• Title/Summary/Keyword: Underground road

Search Result 341, Processing Time 0.026 seconds

DEM Simulation on the Initiation and Development of Road Subsidence (개별요소법을 활용한 도로함몰 발생과 전개거동 예측)

  • Kim, Yeonho;Park, Seong-Wan
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.7
    • /
    • pp.43-53
    • /
    • 2017
  • Road subsidence, frequently occurring in urban areas, is caused by collapsing of surface layer due to underground cavities followed by a loss of soils. To better understand this phenomenon, the mechanism of cavity formation should be identified firstly. Two kinds of possible subsidence mechanisms were established through previous case studies and the numerical analyses based on Distinct Element Method were conducted for each of these mechanisms. It was confirmed that particle loss and surface settlement can develop differently depending on slit size, void ratio, and particle shape among the various factors influencing the road subsidence. The result demonstrated that the effects of varying cavity diameter and depth could be quantified as a damage chart.

Accuracy Analysis of Road Surveying and Construction Inspection of Underpass Section using Mobile Mapping System

  • Park, Joon Kyu;Um, Dae Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.2
    • /
    • pp.103-111
    • /
    • 2021
  • MMS (Mobile Mapping System) is being used for HD (High Definition) map construction because it enables fast and accurate data construction, and it is receiving a lot of attention. However, research on the use of MMS in the construction field is insufficient. In this study, road surveying and inspection of construction structures were performed using MMS. Through data acquisition and processing using MMS, point cloud data for the study site was created, and the accuracy was evaluated by comparing with traditional surveying methods. The accuracy analysis results showed a maximum of 0.096m, 0.091m, and 0.093m in the X, Y, and H directions, respectively. Each RMSE was 0.012m, 0.015m, and 0.006m. These result satisfy the accuracy of topographic surveying in the general survey work regulation, indicating that construction surveying using MMS is possible. In addition, a 3D model was created using the design data for the underpass road, and the inspection was performed by comparing it with the MMS data. Through inspection results, deviations in construction can be visually confirmed for the entire underground roadway. The traditional method takes 6 hours for the 4.5km section of the target area, but MMS can significantly shorten the data acquisition time to 0.5 hours. Accurate 3D data is essential data as basic data for future smart construction. With MMS, you can increase the efficiency of construction sites with fast data collection and accuracy.

A numerical study on the influence of small underground cavities for estimation of slope safety factor (소규모 지하공동이 사면안전율 산정에 미치는 영향에 관한 수치해석 연구)

  • An, Joon-Sang;Kang, Kyung-Nam;Song, Ki-Il;Kim, Byung-Chan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.5
    • /
    • pp.621-640
    • /
    • 2019
  • Quantitative stability assessment of underground cavities can be presented as a factor of safety based on the Shear Strength Reduction Method (SSRM). Also, SSRM is one of the stability evaluation methods commonly used in slope stability analysis. However, there is a lack of research that considers the relationship between the probability of occurrence of cavities in the ground and the potential failure surface of the slope at the same time. In this study, the effect of small underground cavities on the failure behavior of the slope was analyzed by using SSRM. Considering some of the glaciology studies, there is a case that suggests that there is a cavity effect inside the glacier in the condition that the glacier slides. In this study, the stability evaluation of underground cavities and slope stability analysis, where SSRM is used in geotechnical engineering field, was carried out considering simultaneous conditions. The slope stability analysis according to the shape and position change of underground cavities which are likely to occur in the lower part of a mountain road was analyzed by using SSRM in FLAC3D software and the influence of underground cavities on the slope factor of safety was confirmed. If there are underground cavities near slope potential failure surface, it will affect the calculation of a factor of safety. The results of this study are expected to be basic data on slope stability analysis with small underground cavities.

Reserch On The Fundamental Technology To Utilization Of Platform To Providing Mobile Underground Geospatial Infomation Map (모바일용 지하공간통합지도 제공 플랫폼 활용을 위한 기반 기술 연구)

  • LEE, Tae-Hyung;KIM, Hyun-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.4
    • /
    • pp.173-183
    • /
    • 2020
  • In the midst of the aging of underground facilities in urban areas and anxiety about road excavation safety accidents, the Ministry of Land, Infrastructure and Transport began to build Underground Geospatial Infomation Map from 2015 as part of the 「ground subsidence prevention measures」 and efficient use of underground spaces. So, the scope is spreading every year. The current Underground Geospatial Infomation Map information is web-based and is operated in a desktop environment, so it is true that there are some limitations in its use in a field environment such as an excavation construction site. The Underground Geospatial Infomation Map, built and operated in a web-based environment, is a large-scale 3D data. Therefore, in order to service by transmitting data to the field without delay, it is necessary to lighten the Underground Geospatial Infomation Map data. In addition, the current Underground Geospatial Infomation Map is not unified in data formats such as 3DS and COLLADA, and the coordinate system method is also different in relative coordinates and absolute coordinates. In this study, by analyzing domestic and overseas prior research and technical use cases, a mobile Underground Geospatial Infomation Map data format and a lightweight method were presented, and a technology development was conducted to create a mobile underground space integration map in the presented format. In addition, the weight reduction rate was tested by applying 3D data compression technology so that data can be transmitted quickly in the field, and technology was developed that can be used by decompressing 3D data compressed in the field. finally, it aims to supplement the technology experimentally developed in this study and conduct additional research to produce it as software that can be used in the excavation site and use it.

Development of an Application System for Efficient Management of Underground Water Supply Facility - Pilot Study in Chonju City - (상수도 지하시설물의 효율적 관리를 위한 응용시스템 개발 -전주시를 대상으로-)

  • 오권호;진철하;이근상;정승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.2
    • /
    • pp.111-120
    • /
    • 2000
  • Water, waste, electric and gas facilities are urban based facilities that needed in our life and are often located in underground. Therefore, underground facilities are more difficult to manage efficiently than ground facilities. It is needed to carry out survey/probe into underground facilities and to build database in order to prevent city-misfortunes being occurred because of negligent management and in order to minimize budget-waste and a traffic jam according to repetition of road excavation constructions. Also, the development of application system is required to manage efficiently underground facility. Chonju city has launched underground water supply facility computerizing project as a part of National Geographic Information System project until December 1998 and executed survey/probe into 402.89 km water supply that is 80 mm up inside central town area 39.6 $km^2$. Also, chonju city built database into 537 km water supply that is 80 mm below based on water supply card without other survey/probe works. Also, existing work process each department is changed into GIS applied work process and underground water supply facility management system is developed by its work process basis. Water supply underground facility management system that is developed is composed of sub-system like base-map management, water supply inspect, water supply management and water supply inquiry, construction work management, administration management and map management. This research presents the procedure and method of underground water supply facility survey/probe and problem being occurred during survey/probe procedure and also show the functions of each sub-systems composing underground water supply facility management system.

  • PDF

A study on use of quantitative risk analysis on life safety performance for the effect of fixed fire fighting system at road tunnel fires (정량적 위험성 평가를 활용한 도로터널 화재시 물분무 소화설비의 피난 안전 효과 연구)

  • Park, Kyung-Hwan;Yoo, Ji-Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.1
    • /
    • pp.1-22
    • /
    • 2012
  • This paper tried to verify whether the fixed fire fighting system (FFFS) that is installed in road tunnel improves evacuation performance or not. Verification was performed according to the Disaster Prevention Facilities Installation and Management Guide at Road Tunnel. Twenty seven different fire scenarios were set up for the verification and the cases that FFFS was installed were compared with the cases that FFFS was not installed. The result of the comparison showed that the average equivalent death was reduced in 26 cases out of 27 cases when water spray extinguishing system was installed. It was confirmed that the risk when was not installed was unacceptable in Hong Kong and the Netherlands. On the other hand, it was confirmed that the risk was reduced to as low as reasonably practicable (ALARP) when was installed. The cumulative frequency of average death in case with FFFS was compared against the frequency of death without FFFS: death of one or more is about 50 times less; 10 or more is about 100 times less; and the death of more than 100 is four times less. It was verified that FFFS makes improved conditions to escape from the fires in road tunnel.

Development and Evaluation of the Road Energy Harvester Using Piezoelectric Cantilevers (압전 캔틸레버 구조를 이용한 도로용 에너지 하베스터의 개발 및 평가)

  • Kim, Chang-Il;Kim, Kyung-Bum;Jeon, Jong-Hac;Jeong, Young-Hun;Cho, Jeong-Ho;Paik, Jong-Hoo;Kang, In-Seok;Lee, Moo-Yong;Choi, Beom-Jin;Cho, Young-Bong;Park, Shin-Seo;Nahm, Sahn;Lee, Young-Jin
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.25 no.7
    • /
    • pp.511-515
    • /
    • 2012
  • A road energy harvester was designed and fabricated to convert mechanical energy from the vehicle load to electrical energy. The road energy harvester is composed of 24 piezoelectric cantilevers and a vehicle load transfer mechanism. Applying a vehicle load transfer mechanism rather than directly installing energy harvesters under roads decreases the area of road construction and allows more energy harvesters to be installed on the side of the road. The power generation amount with respect to the vehicular velocity change was assessed by installing the vehicle load transfer mechanism and the energy harvester in the form of speed bumps and underground. The energy harvester installed in a speed bump form generated power of 7.61 mW at the vehicular velocity of 20 km/h. Also, power generation of the energy harvester installed in the underground form was 63.9 mW at the vehicular velocity of 28 km/h. Although the number of piezoelectric cantilevers was reduced by 1/3 to 24 in comparison to the previous research results with 72 piezoelectric cantilevers, similar power generation characteristic value was obtained within the vehicular velocity of 20 km/h by altering the vehicle load transfer mechanism and cantilever vibration method.

CFD analysis of the effect of hydrogen jet flame in road tunnel (도로 터널 내 수소 제트 화염에 대한 CFD 해석 연구)

  • Park, Jinouk;Yoo, Yongho;Kim, Hwiseong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.629-636
    • /
    • 2022
  • Domestic eco-friendly vehicles currently account for 5.8% of the total registered vehicles in Korea. Hydrogen vehicles, one of the representative eco-friendly vehicles, have grown rapidly as they have been expanded to the market based on the government's policy to boost the hydrogen industry. Therefore, it is time to expand the safety review of hydrogen vehicles in various directions according to the increase in supply. In this study, the effect of internal heat damage was analyzed when a jet flame was generated by a hydrogen car in a road tunnel. It was simulated using Fluent, and the amount of jet flame injection was selected in consideration of the hydrogen tank capacity of commercial hydrogen vehicles for road tunnels. In addition, the study was conducted with the direction of the jet flame and the nozzle distance from the tunnel wall as variables. From the results, when the jet flame erupted in the road tunnel, high radiant heat emission of more than 20 kW/m2 was generated in most areas within ±5 m in the longitudinal direction based on the vehicle (spray nozzle) and 5 to 7 m in the lateral direction based on the adjacent tunnel wall.

A Case Study on M & E Design for Double-Deck Tunnel in Urban Area (도심지 대심도 복층터널의 환기 및 방재계획)

  • Byun, Sang-Hun;Jeong, Jae-Ho;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Tunnel and Underground Space
    • /
    • v.21 no.4
    • /
    • pp.281-286
    • /
    • 2011
  • The west underground express way is a recent initiated BTO (Build-Transfer-Operate) project for releasing heavy traffic of the existing west express way which is notorious on-ground road for extremely traffic stuck area in the west of Seoul, South Korea. The new express way for light vehicles is the first double-deck tunnel ever designed in South Korea and 10.91 km long including both open cut structures and concrete lining with middle-deck in bored tunnel. Because the new express way is going through underground of heavily populated area, mechanical & electrical design for the safety of drivers in tunnel is one of the most important parts among many design issues. This paper discusses M & E design focuses including ventilation-evacuation plan and various safety facilities.

A Study on the Prediction of Outflow of Groundwater in Tunnel Construction Areas (터널 굴착시 발생하는 지하수의 유출량 예측에 관한 연구)

  • Park, Sun Hwan;Chang, Yoon Young;Kang, Hyung Sik;Choi, Joon Gyu;Yang, Keun Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.6
    • /
    • pp.407-419
    • /
    • 2007
  • This study investigated the predicted and abserved outflow of groundwater which occurred during tunnel constructions. Among the 586 road construction projects from 1986 to 2006, 4 route 25 tunnel construction areas and 26 waste water treatment facilities under construction were studied. Most of the tunnel outflow prediction in EIA (Environmental Impact Assessment) process have been classified into the 17 types of units depending on the assessor's options, which have not conformed to the request of the residents and non government organizations. The investigation results showed that the outflow of underground water in tunnel construction areas averaged about $0.133m^3/km{\cdot}min$ with the maximum $0.386m^3/km{\cdot}min$, and that the outflow mostly occurred in the early stage of tunnel excavation and diminished gradually. The prediction of outflow of underground water in the EIA process showed excessive results compared to observed outflow, the even 51.7 times. Consequently for more realistic prediction, current EIA method for prediction of outflow of underground water in tunnel construction areas has to adopt numerical methods coupled with hydraulics and geologic informations from unit methods of present time.