• Title/Summary/Keyword: Underground facility

Search Result 379, Processing Time 0.025 seconds

The Externality of an Unwelcomed Facility on the Nearby Multi-family Houses: A Case Study of Dangin-Ri Power Plant (기피시설이 인근 공동주택(연립, 다세대)에 미치는 외부효과 - 당인리 화력발전소를 사례로 -)

  • Kim, Chul-Joong;Song, Myung-Gyu
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.5
    • /
    • pp.729-745
    • /
    • 2011
  • The purpose of this paper is to estimate the external diseconomies of an unwelcomed facility on the nearby houses. The facility and the area studied are Dangin-Ri power plant in Mapo-Gu, Seoul and the residential district surrounding it respectively. The nearby housing prices have been changed according to the time and circumstances of the public announcements about the reconstruction or removal plans of the plant. These price changes are regarded as the capitalized values of the external diseconomies due to the plant. This study is based on the hedonic price theory in order to estimate the diseconomies in monetary value. The tools for the estimation are four models of multiple regression with the transaction price as the dependant variable and various housing characteristics including the external effects of the plant as the independent variables. The sample analyzed is 833 house transactions for the past 5 years in the research area. The facts found are as follows; First, the most suitable functional form for the estimation is confirmed to be the linear model. Second, there are significant differences in influence on the housing values among the independent variables, that is, locational characteristics, physical features, and environmental changes with time. Third, the external diseconomy is estimated as \80,137,807 in case that the plant would be reconstructed in the underground of the present site, whereon a substitutional public park would be constructed and as \59,142,248 in case that the plant would move away.

Efficient Construction of Open Source-based Sewage Facility Database (오픈소스 기반의 하수 시설물 데이터베이스의 효율적 구축)

  • Ko, Jeongsang;Xu, Chunxu;Yun, Heecheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.5
    • /
    • pp.393-402
    • /
    • 2022
  • Effective data management of underground facilities is very important in terms of human life. For this, input of up-to-date and high-accuracy data should be preceded. Therefore, it is important to have an efficient data input method. In this study, by developing a sewage facility site survey program using open source software, paper drawings could be replaced with tablet PCs. By using a tablet PC, figures and property information acquired from the field are transmitted in real time through a database server. PostGIS query is developed to automate structured editing to minimize manual work in constructing a GIS (Geographic Information System) database for sewage facilities. did. In addition, the database was built using the sewage facility GIS database building program. As a result of comparing and analyzing the existing sewage facility database construction, work process, and work time, the work process was simplified and work time was shortened. In addition, through simple customization of open source software, it will be able to be used for field surveys and database construction in other fields.

Behavior Case Study of Temporary Structures during Underground Extension Work by Field Measurement (현장계측을 통한 지하증축공사 중 가설구조물의 거동 사례연구)

  • Kim, Uiseok;Min, Byungchan;Kang, Minkyu;Kim, Dongkwan;Choi, Hangseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.8
    • /
    • pp.5-13
    • /
    • 2020
  • During the construction of underground space expansion of old facilities, it is necessary to secure temporary residence space for existing residents as well as noise and vibration issues during construction, and in the case of commercial, industrial, and social use, damage is expected from suspension of the use of facilities. There is a need for a technology that minimizes noise and vibration during underground expansion, enabling the use of existing facilities even during construction. In this study, a practical underground extension model is proposed by analyzing the behavior of the temporary structure and the surrounding ground as a result of measurement at each construction stage for a actual construction site. In order to solve the problems that occurred during construction, the basement slabs were placed in advance after the initial excavation. The measurement results (building inclinometer, crack measurement system, structure inclinometer and surface settlement meter) at the site were reviewed to analyze the behavior of the temporary structure and surrounding ground. As a result, it was confirmed that the inclinometer of the building and the structural inclinometer showed a tendency that the displacement after the slab line was placed was reduced or converged. The placement of basement slabs during underground extension not only relived the noise and vibration problems during construction, but also secured the stability of structures.

Research on Classification of Monitoring Items for the Integrated Management of the Underground Facilities (지하시설물 통합관리를 위한 모니터링 항목 분류에 관한 연구)

  • Kim, Jung-Hoon;Min, Kyung-Ju;Lee, Mi-Sook;Lim, Si-Yeong
    • Spatial Information Research
    • /
    • v.18 no.1
    • /
    • pp.19-26
    • /
    • 2010
  • It is important to manage the underground facilities efficiently because they are directly related to the convenience and safety of citizens. But the fact that the different agencies take on a role of managing the underground facilities respectively makes it impossible. So Korean government has exerted great efforts to solve this problem through several projects. Korean government expects that the ubiquitous technologies such as sensor and wireless communication in the domain of the underground facilities management will be useful. It is main duty of u-City Management Center to monitor several situations about the underground facilities using ubiquitous technologies. But there is no consensus about what concrete situations it has to monitor even though u-cities under construction. Because local governments or related companies are in charge of carrying out these roles yet, there is no legal basis on which to do these tasks by the center. And it is needed to develop new technologies for u-services efficiently. Because technologies for u-service are vast, various and converged, so it necessary to develop them according to priority or in cooperation with other developers. In this paper, we classify the monitoring items for each facility which were investigated by a recent research. It is expected to make use of defining the role of the center and developing technologies with u-service.

Ground Subsidence Risk Grade Prediction Model Based on Machine Learning According to the Underground Facility Properties and Density (기계학습 기반 지하매설물 속성 및 밀집도를 활용한 지반함몰 위험도 예측 모델)

  • Sungyeol Lee;Jaemo Kang;Jinyoung Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.4
    • /
    • pp.23-29
    • /
    • 2023
  • Ground subsidence shows a mechanism in which the upper ground collapses due to the formation of a cavity due to the movement of soil particles in the ground due to the formation of a waterway because of damage to the water supply/sewer pipes. As a result, cavity is created in the ground and the upper ground is collapsing. Therefore, ground subsidence frequently occurs mainly in downtown areas where a large amount of underground facilities are buried. Accordingly, research to predict the risk of ground subsidence is continuously being conducted. This study tried to present a ground subsidence risk prediction model for two districts of ○○ city. After constructing a data set and performing preprocessing, using the property data of underground facilities in the target area (year of service, pipe diameter), density of underground facilities, and ground subsidence history data. By applying the dataset to the machine learning model, it is evaluated the reliability of the selected model and the importance of the influencing factors used in predicting the ground subsidence risk derived from the model is presented.

In-Situ Stress Measurements for Excavation of Deep Cavern (대심도 지하 공간 굴착을 위한 초기지압 측정 결과)

  • Lee, Hong-Gyu
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.567-582
    • /
    • 2009
  • The world's largest nucleon decay experiment facility is constructed at a depth of approximately 1,000meters, in the Kamioka mine, Japan. Because of the character as a large cavern in deep underground, in-situ stress measurements were conducted to provide basic information for design of the cavern. Three overcoring methods were used: 8-element embedding gauges developed by Japanese Central Research Institute of Electric Power Industry, hemispherical ended borehole technique with eight strain cross-gauges, and Hollow Inclusion Cell with 12 strain gauges. The principle stresses were not perfectly similar in each measurement. The average values of the 6 stress element were used to provide the direction and the magnitude of three principle stress.

A Study on the Safety Checking and Testing method of the underground power transmission line (OF Cable) (지중송전선로 안전관리 방안 (OF케이블))

  • Choi, Jong-Soo;Park, Kang-Seo;Jeon, Jun-Man
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.429-434
    • /
    • 2009
  • In this paper it was written about the safety management plan for underground power transmission cable, and it guarantees the reliable electric power supply and facility management to prevent an electric disasters according to that. Recently fires which happens on OF Cable lead to a breakdown of power system and cause a power outage of wide area and serious social problems. So it needs an improvement of inspection ability on OF cable as well as a strict inspection system to prevent that problems in advance and it will bring us the development of electric safety management and the reliable electric power supply.

  • PDF

Pillar load and ground deformation in 2-arch tunnel in the jointed rock mass (절리암반에서 2-Arch 터널의 필라하중과 지반변위)

  • Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.91-97
    • /
    • 2007
  • Loads on the pillar and ground deformation in 2-arch tunnel, which is excavated in the rock mass with regular discontinuities, depending on the dips of discontinuities and the construction sequences were experimentally studied. Large scale model tests in the biaxial test facility were performed. Tested model (width 3.3m, height 3.0m, and length 0.45m) for 2-arch tunnel in 1/10 scale were built with various dips. Test results show that discontinuities have greate affects on the behavior of the 2-arch tunnel, especially on the pillar loads and ground deformation.

  • PDF

Fire Endurance Estimate of Reinforced Concrete Structure Using Nonlinear Finite Element Method (비선형 유한요소해석을 이용한 철근콘크리트 구조물의 내화성능평가)

  • Byun, Sun-Joo;Im, Jung-Soon;Hwang, Jee-Wook
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.1 s.20
    • /
    • pp.17-27
    • /
    • 2006
  • To estimate the retained strength of reinforced concrete structure after fire is very difficult because the complex behavior of structure is hard to understand during course of a fire. However, the damages which is caused by fire of the traffic facility infrastructure are enormous. Therefore the security against fire is important element that must not be overlooked. For this reason, an exact estimate method of the fire endurance is highly demanded. In this study, the validity of the nonlinear finite element method approach for the fire endurance of reinforced concrete structure is verified. The results of fire endurance estimate of underground road way by nonlinear finite element method approach are compared with those by ACI 216R-89.

Defect Length Estimation Using SQI for Underground Gas Pipelines (SQI를 이용한 지하 매설 가스 배관 결함 길이 추정)

  • Kim, Min-Ho;Choi, Doo-Hyun
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.2
    • /
    • pp.27-32
    • /
    • 2011
  • In this paper a new defect length estimation algorithm using SQI(self quotient image) is presented for the MFL(magnetic flux leakage) inspection of underground gas pipelines. Gas pipelines are magnetized by the permanent magnets of the MFL PIG(pipeline inspection gauge) when the PIG runs through pipelines. If defects or corrosions exist in the pipeline, magnetic leakage flux is increased. The MFL signals measured by hall sensors are analyzed to estimate defect length using SQI. For 74 real defects carved in KOGAS pipeline simulation facility(KPSF) the accuracy of defect length estimation of the proposed algorithm was compared with that of conventional methods.