• Title/Summary/Keyword: Underground excavation

Search Result 844, Processing Time 0.028 seconds

ENGINEERING GEOLOGICAL STUDIES ON THE SUBMERGED TOMB OF KING MUNMU, SHILLA DYNASTY, KOREA (문무대왕 수증릉에 대한 지질공학적 연구)

  • HoWoongShon;SeongBeomKim
    • Journal of the Korean Geophysical Society
    • /
    • v.6 no.3
    • /
    • pp.139-153
    • /
    • 2003
  • Subsurface information is one of the most important factors in the archaeological excavation. To obtain the information on the underground, geophysical prospecting is becoming a popular method. This study is on the small rocky islands located 200m away from the shoreline of Gampo, Gyeongju city, Korea. According to the historical records and field surveys, it was revealed as the tomb of King Munmu of Shilla Dynasty. However, the questions and debates, such as whether it is really the tomb of King Moonmu or not, and whether it is a buried place or not, are still remains, in addition to the incompletion of precise surveying and scientific studies. The scope of this study contains the researches on the above problems and debates using the geophysical and geological methods and techniques. The rocky islands around the submerged Tomb of King Moonmu is composed of granite, and sag exists inside of the islands. Sea water enters through the east groove by wave and is drained to the west slot by hydraulic gradient, since west slot is 15cm lower than the east. Sag inside of the islands is believed to be extended and widened from pre-existed sinkage by applying tools like chisel in the joints and cracks. It is concluded that the submerged megalith inside of sag was from the rock block which was developed by joints. Geophysical surveys reveal that there is no artificial structure or stone/china/steel chest, under the m egalith and rocky island. Researches show that the tomb of King Moonmu was constructed in the small rocky island artificially. However, the evidences show that planners and constructors of the tomb made every possible effort to preserve the natural environment and condition. It is strongly believed that the megalith was sort of alter to sprinkle bone-ash rather than buried place.

  • PDF

A Study on the Stress Induced Brittle Failure around Openings with Cross-sectional Shape by Scaled Model Test and DEM Simulation (모형시험과 개별요소법을 이용한 단면 형상에 따른 공동 주변 취성파괴에 관한 연구)

  • Bae, Seong-Ho;Jeon, Seok-Won;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.17 no.5
    • /
    • pp.389-410
    • /
    • 2007
  • For moderately jointed to massive rock masses, the failure and deformation behaviors around an excavated opening are absolutely influenced by the initial rock stress and strength of in-situ rock mass. The localized and progressive brittle failure around an opening does not mean whole collapse of an excavated opening. But, for many cases, it may induce temporary stopping of excavation works and reexamination of the current supporting system, which can result in delay of the entire construction works and additional construction cost. In this paper, the characteristics of the brittle failure around an opening with stress level and tunnel shape was studied by the biaxial compressive test using scaled specimen and by the numerical simulation with $PFC^{2D}$. The biaxial test results were well coincided with the stress induced failure patterns around the excavated openings observed and monitored in the in-situ condition. For the circular part of the opening wall, the stress induced cracks initially occurred at the wall surface in the direction of the minimum principal stress and contributed to the localized notch shaped failure region having a certain range of angle. But for the corner and straight part of the opening wall, the cracks initiated at sharp corners were connected and coalesced each other and with existing micro cracks. Further they resulted in a big notch shaped failure region connecting two sharp corners.

Fire Suppression Test using the Automatic Monitor System for Double-Deck Tunnel (복층터널 자동 모니터 소화설비를 이용한 화재진압 실험)

  • Park, Jin-Ouk;Yoo, Yong-Ho;Kim, Hwi-Seung;Park, Byoung-Jik;Kim, Yang-Kyun
    • Fire Science and Engineering
    • /
    • v.31 no.6
    • /
    • pp.40-46
    • /
    • 2017
  • As one of the solutions to deal with economic loss caused by traffic congestion in metropolitan area, a deep underground road has been planned and implemented at home and abroad. The part of them has been pushed ahead with a double-deck scheme which has an advantage in constructability and cost efficiency comparing to traditional road tunnel. However, the double-deck tunnel has a lower floor height than the general road tunnel due to the special structure used as the upper and lower lines by installing the middle slab on one excavation section. Therefore, it is relatively weak against fire accidents and ventilation problems occurring in tunnels. Thus study to develop the life safety system optimized to a double-deck tunnel has been systematically carried out in order to overcome their weak point. In this study, automatic monitoring fire extinguisher (AMFE) is developed to suppress a fire and prevent its spread at early stage of tunnel fire, conducting the performance test through vehicle fire tests as verification. The tests were conducted with AMFE being 30 m apart from the vehicle and 10 m apart from engine room. As a results, it was confirmed that AMFE enables to suppress a fire and prevent its spread in both cases.

Trend of Physical Modelling For Ground Subsidence And Study of Its Application (지반함몰 모형실험 연구동향 및 적용방안 고찰)

  • Jeong, Seong-Yun;Jeong, Yeong-Hoon;Kim, Dong Soo
    • Journal of Korean Society of Disaster and Security
    • /
    • v.10 no.1
    • /
    • pp.1-10
    • /
    • 2017
  • Recently, increasing cases of ground subsidence in the urban area has become social issue, and related bill has been passed. Ground subsidence occurs through complex combination of various factors, and numerical analysis of this problem is limited thereby. This is why verification of ground subsidence mechanism has been conducted through physical modelling. Previous researches has been focused on modelling ground subsidence caused by utility pipe defects, and there has been insufficient physical modelling study on ground subsidence caused by various reasons such as groundwater flow and excavation activity. Also, most previous physical modelling studies were performed in 1g condition, which cannot take the in-situ stress condition into the evaluation of the ground subsidence mechanism. Therefore, in this study, physical modelling techniques to simulate various conditions is discussed by studying the previous researches on the ground subsidence mechanism through physical modelling. Also, centrifuge modelling test is suggested in this study as the technique to perform more reliable evaluation of ground subsidence mechanism. Lastly, this study suggests to apply the techniques used in the evaluation of ground subsidence mechanism into Ground Stability Assessment.

A Study on Conservation and Management of the Joseon Royal Tomb's System - Focused on Joseon Royal Tombs Under the Eastern District Management Office - (조선왕릉의 능제보존관리에 관한 연구 - 동부지구관리소 산하 조선왕릉을 중심으로 -)

  • Choi, Jong-Hee;Lee, Chang-Hwan;Hwang, Kyu-Man;Kim, Kyu-Yeon
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.36 no.3
    • /
    • pp.75-87
    • /
    • 2018
  • The purpose of this study is to investigate conservation and management methods of the Joseon Royal Tombs under the Eastern District Management Office. Through the literature survey, we understood the process of change of Joseon royal tombs, and through field surveys and interviews, we understood the status of the interior and the surrounding area. In this process, topography, land use and flow of human traffic, architecture and stone objects, water system, historical forests, and facilities were set as the main evaluation indicators. Urbanization has damaged the original terrains of Royal Tombs as national roads, buildings and facilities have constructed in the inner and outer area of Joseon Royal Tombs. Construction of underground passage, land purchase, relocation and demolition of the buildings are required for the conservation of the Royal Tombs area, and then it is necessary to recover the original terrain. In the case of land use and pathways, there are many disconnection of the original ritual circulation, they should be maintained to remind the sacred atmosphere of the royal tomb. And It is necessary to collect accurate information on the lost buildings and stoneworks through literature survey and excavation investigation, and that investigations should be lead to the exposure or restoration of the ruins. Historical forests require periodic and ongoing monitoring and management, and it is necessary to establish new entrance area and appropriate facilities following the long-Term conservation and management plan. These plans should be classified into short, medium and long-Term projects according to urgency and securing financial resources with a long perspective to implement continuous and systematic projects.

A Numerical Study for Ground Stability Assessment in ○○Mine (○○광산의 지반 안정성 평가를 위한 수치해석적 연구)

  • Son, Min;Moon, Hyun-Koo
    • Tunnel and Underground Space
    • /
    • v.26 no.6
    • /
    • pp.484-492
    • /
    • 2016
  • This study is the numerical analysis for the ground stability assessment in ${\bigcirc}{\bigcirc}$mine. The subsidence factors applied to the numerical analysis were as follows. First, the deterioration of the rock mass properties by excavation of the disturbed zone. Second, using the average lateral pressure coefficient of Korea. Third, a study of the mine history. Fourth, the excavating collapsed rock mass in numerical analysis based on the assumption that the rock mass around the goaf was collapsed due to the mining. The developed methods were applied to the cross section (5+10) of the actual subsidence in ${\bigcirc}{\bigcirc}$mine. The feasibility of the numerical analysis methods was confirmed by providing the same results as those of the actual subsidence. Next, the developed methods were applied to the cross section (3+10) that had a high probability of subsidence and the ground stability was evaluated. The analysis results show that the vertical displacement for the 5+10 cross section occurs at a maximum of 46 mm, whereas the analysis results show that the vertical displacement for the 3+10 cross section occurs at a maximum of 7 mm. Hence, it is concluded that the probability for subsidence is low.

Case Study about the Ground Characteristics Analysis of Tunnel Face Fault Fractured Zone (터널막장 단층파쇄대의 지반특성 분석에 대한 사례연구)

  • Min Kyoung-Nam;Lim Kwang-Su;Jang Chang-Sik;Lim Dae-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.111-118
    • /
    • 2005
  • The area of investigation belongs to Okchon metamorphic zone and the fault fractured zone runs parallel to the tunnel direction. It causes the independent decline of tunnel face and the slackness of the tunnel surrounding base so, after all, the severe displacement has occurred within the tunnel. Accordingly, the TSP(Tunnel Seismic Prediction) survey has been performed to investigate the extent of fault fractured zone and to analize its characteristics. Also, we have analized the behavior causes by performing the tunnel face mapping and drilling investigation, and confirmed the position and scale of geological anomaly area and front fractured zone which influences tunnel excavation and supporting. Collected data analyzed ground layer condition through 3 dimensional modeling. Several variables included in the modeling were analyzed by geostastistics. The analysis of the modeling data shows that the belt of weathering by fault fractured zone is developing on the basis of the right side of tunnel and that is decreasing to the left side. The fault fractured zone was confirmed that it has strike, $N0\~5^{\circ}E$ dip NW, and it is consisted of large-scale fractured zone including several anomalies. The severe displacement in tunnel is probably caused by asymmetrical load that n generated by the crossing of discontinuity and the rock strength imbalance of tunnel's both side by fault fractured zone, and judge that need tunnel reinforcement method of grouting etc.

A Numerical Study on the Progressive Brittle Failure of Rock Mass Due to Overstress (과지압으로 인한 암반의 점진적 취성파괴 과정의 수치해석적 연구)

  • Choi Young-Tae;Lee Dae-Hyuck;Lee Hee-Suk;Kim Jin-A;Lee Du-Hwa;You Kwang-Ho;Park Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.16 no.3 s.62
    • /
    • pp.259-276
    • /
    • 2006
  • In rock mass subject to high in-situ stresses, the failure process of rock is dominated by the stress-induced fractures growing parallel to the excavation boundary. When the ratio of in situ stresses compared to rock strength is greater than a certain value, progressive brittle failure which is characterized by popping and spatting of rock debris occurs due to stress concentration. Traditional constitutive model like Mohr-Coulomb usually assume that the normal stress dependent frictional strength component and the cohesion strength component are constant, therefore modelling progressive brittle failure will be very difficult. In this study, a series of numerical analyses were conducted for surrounding rock mass near crude oil storage cavern using CW-FS model which was known to be efficient for modelling brittle failure and the results were compared with those of linear Mohr-Coulomb model. Further analyses were performed by varying plastic shear strain limits on cohesion and internal friction angle to find the proper values which yield the matching result with the observed failure in the oil storage caverns. The obtained results showed that CW-FS model could be a proper method to characterize essential behavior of progressive brittle failure in competent rock mass.

Pillar Width of Twin Tunnels in Horizontal Jointed Rock Using Large Scale Model Tests (대형모형실험을 통한 수평 절리암반에서의 병설터널 이격거리)

  • Lee, Yong-Jun;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.352-359
    • /
    • 2010
  • Stability of twin tunnels depends on the pillar width and the ground condition. In this study, large scale model tests were conducted for investigating the influence of the pillar width of twin tunnels on their behavior in the regular horizontal jointed rock mass. Jointed rocks was composed of concrete blocks. Pillar width of twin tunnels varied in 0.29D, 0.59D, 0.88D and 1.18D, where D is the tunnel width. During the test, pillar stress, lining stress, tunnel distortion, and ground displacement were measured. Lateral earth pressure coefficient was kept in a constant value 1.0. As a result, it was found that the pillar stress and the displacement of the ground and tunnel were increased by decreasing pillar width. The maximum displacement rate was measured just after the upper excavation in each construction sequence. And the maximum influence position was the right shoulder of the preceeding tunnel at the pillar side. It was also found that for the stability assessment the inner displacement was more critical than the crown displacement. The influence zone was formed at the pillar width 0.59D~0.88D that was smaller than 0.8D~2.0D, which was proposed by experience for a good ground condition. And it would be concluded that horizontal joints could also influence on the stability of the twin tunnels.

A Simple Numerical Procedure for Assessing the Effect of Ground Improvement Around a Circular Tunnel Excavated in Mohr-Coulomb Rock Mass (Mohr-Coulomb 암반에 굴착된 원형터널의 보강효과 해석을 위한 간편 수치해석법)

  • Lee, Youn-Kyou
    • Tunnel and Underground Space
    • /
    • v.18 no.2
    • /
    • pp.98-106
    • /
    • 2008
  • When a tunnel is excavated in a rock mass of poor condition, the adjacent zone of excavation surface may be reinforced by adopting the appropriate methods such as grouting and rock bolting. The reinforced effect can be evaluated by use of various numerical approaches, where the reinforcing elements may be expressed as distinct discretizations or smeared into the equivalent material properties. In this study, a simple numerical method, which can be classified as the latter approach, was developed for the elasto-plastic analysis of a circular tunnel. If a circular tunnel in a Mohr-Coulomb rock mass is reinforced to a finite thickness, the reinforced annulus may have different material properties from the in-situ rock mass. In the proposed elasto-plastic method for assessing the reinforcing effect, Lee & Pietruszczak (2007)'s method is applied to both the reinforced annulus and the outer insitu rock mass of the fictitious tunnel, and then two results are combined by enforcing the compatibility condition. The method were verified through comparing the results with the proposed method and the commercial finite difference code FLAC. When taking the variation of deformation modulus and strength parameters in the reinforced zone into account, the distributions of stress and radial displacement were much different from those obtained with the assumption of homogeneous rock mass.