• Title/Summary/Keyword: Underground excavation

Search Result 844, Processing Time 0.024 seconds

Numerical Evaluation of Excavation Damage Zone Around Tunnels by Using Voronoi Joint Models (Voronoi 절리모델에 의한 터널 주변 굴착손상권(EDZ)의 해석 사례)

  • Park, Eui-Seob;Martin, C. Derek;Synn, Joong-Ho
    • Tunnel and Underground Space
    • /
    • v.18 no.5
    • /
    • pp.328-337
    • /
    • 2008
  • Quantifying the extent and characteristics of the excavation damage zone(EDZ) is important for the nuclear waste industry which relies on the sealing of underground openings to minimize the risk for radionuclide transport. At AECL's Underground Research Laboratory(URL) the Tunnel Sealing Experiment(TSX) was conducted and the tunnel geometry and orientation relative to the stress field had been selected to minimize the potential for the development of an EDZ. The extent and characteristics of the EDZ was measured using velocity profiling and permeability measurements in radial boreholes. The results from this EDZ characterization are used in this paper to evaluate a modeling fir estimating the extent of the EDZ. The methodology used a damage model formulated in the Universal Distinct Element Code and calibrated to laboratory properties. This model was then used to predict the extent of crack initiation and growth around the TSX tunnel and the results compared to the measured damage. The development of the damage zone in the numerical model was found to be in good agreement with the field measurements.

The prediction of deformation according to tunnel excavation in weathered granite (화강 풍화암지반의 터널굴착에 따른 변형예측)

  • Cha, Bong-Geun;Kim, Young-Su;Kwo, Tae-Soon;Kim, Sung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.329-340
    • /
    • 2010
  • Mechanical behavior of underground cavity construction such as tunnel is very difficult to estimate due to complexity and uncertainty of ground. Prediction of behavior according to excavation of tunnel mainly uses method utilized of model test or numerical analysis. But scale model test is difficult to reappear field condition, numerical analysis is also very hard to seek choice of suitable constituent model and input data. To solve this problem, this paper forecasted the deformation of tunnel that applied to information of crown settlement and convergence, RMR in weathered granite by using the regression analysis. The result of the analysis shows that the crown settlement according to excavation occurs approximately 70~80% of total displacements within about 20 days. As a result of the prediction of crown settlement and convergence, an exponential function becomes more accurate at measurements than an algebraic function. Also this paper got a correlation in comparison of RMR and displacements of 6 sections.

Interactions between pre-existing large pipelines and a new tunnel (기존 대구경 파이프라인과 신설터널간의 상호작용)

  • Jeong, Sun-Ah;Choi, Jung-In;Hong, Eun-Soo;Chun, Youn-Chul;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.175-188
    • /
    • 2009
  • When a new tunnel is excavated by the drill and blast method near pre-existing underground structures or tunnels due to the region restricted condition such as urban area, the ground will be relaxed by the excavation. In this case, issues can be created in terms of stability of pre-existing underground structures. One of major factors determining the stability of pre-existing underground structures can be a separation distance between pre-existing underground structures and a newly excavated tunnel. The region of ground relaxation defined by the plastic zone due to new excavation can be varied by separation distance. In this study, in other to estimate an influence of new tunnel excavation in terms of separation distance on the stability of pre-existing large pipelines, two-dimensional scaled model tests using plaster were performed for six models which have a different separation distance, The results show that based on the analysis of induced displacement during tunnel construction, the displacement decreases as the separation distance between large pipeline and new tunnel is increased until the distance is 2.5 times of pipeline diameter. Beyond this point, however, the displacement has become stabilized.

Defining the hydraulic excavation damaged zone considering hydraulic aperture change (수리적 간극변화를 고려한 수리적 굴착손상영역의 정의에 관한 연구)

  • Park, Jong-Sung;Ryu, Chang-Ha;Lee, Chung-In;Ryu, Dong-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.2
    • /
    • pp.133-141
    • /
    • 2007
  • The excavation damaged zone (EDZ) is an area around an excavation where in situ rock mass properties, stress condition, displacement, groundwater flow conditions have been altered due to the processes induced by the excavation. Various studies have been carried out on EDZ, but most studies have focused on the mechanical bahavior of EDZ by in situ experiment. Even though the EDZ could potentially form a high permeable pathway of groundwater flow, only a few studies were performed on the analysis of groundwater flow in EDZ. In this study, the 'hydraulic EDZ' was defined as the rock zone adjacent to the excavation where the hydraulic aperture has been changed due to the excavation by using H-M coupling analysis. Fundamental principles of distinct element method (DEM) were used in the analysis. In the same groundwater level, the behavior of hydraulic aperture near the cavern was analyzed for different stress ratios, initial apertures, fracture angles and fracture spacings by using a two-dimensional DEM program. We evaluate the excavation induced hydraulic aperture change. Using the results of the study, hydraulic EDZ was defined as an elliptical shape model perpendicular to the joint.

  • PDF

Time-lapse Geophysical Survey Analysis for Field-scale Test bed of Excavation Construction (실규모 굴착 시험장에서의 시간경과 물리탐사 자료 분석)

  • Shin, Dong Keun;Song, Seo Young;Kim, Bitnarae;Yoo, Huieun;Ki, Jung Seck;Nam, Myung Jin
    • The Journal of Engineering Geology
    • /
    • v.29 no.2
    • /
    • pp.137-151
    • /
    • 2019
  • Geophysical exploration techniques are effective for monitoring changes in the ground condition around the excavation project to prevent subsidence risks during excavation work, therefore, improving analysis techniques is required for applying and supplementing various geophysical exploration technologies. In this study, a field-scale on-site test was conducted to detect possible ground subsidence hazards and areas of relaxation zone that may occur during excavation work and due to underground water level changes. In order to carry out the field test, a real-scale excavation test bed was constructed and the geophysical exploration methods, such as electrical resistivity survey and multi-channel analysis of surface wave (MASW) survey for urban sites condition, have researched for optimal geophysical exploration parameter, design and correlation analysis between the results by reviewing the validity of each individual geophysical exploration and modeling. The results of this study showed the impact of each geophysical exploration on the relaxation zone and, in particular, the location of the underground water surface and the effects of excavation were identified using electrical resistivity survey. Further research on modeling will be required, taking into account the effects of excavation and groundwater.

A Combined Finite Element -Boundary Element Method of Underground Displacements Analysis (유한요소와 경계요소를 결합한 지하공동의 변위해석)

  • 황창규;박성재
    • Geotechnical Engineering
    • /
    • v.6 no.1
    • /
    • pp.25-34
    • /
    • 1990
  • The finite element and boundary element methods of underground analysis are both well established numerical techniques for determination of stress and displacement distributions at underground excavation. The finite element method presents antithetical advantages and limitations. Complex constitutive behaviour may be modelled, at the expense of numerical efficiency and, for infinite domain, inadequate representation of remote bounadry conditions. The inherent advantages of the boundary element method are the ease with which infinite domain problems may be analysed, and the efficiency of analysis typically associated with a boundary value solution procedure. Application of the method is limited by the requirements linear constitutive behaviour for the medium. A combined of the finite element and boundary element methods of underground analysis is shown to preserve the advantages of each procedure, and, eliminates their individual disadvantages. Procedures employed in this papers described combined FEBEM algorithm. Solutions of underground excavation verifying the performance of combined FEBEM code are compared with theoretical solution, boundary element solution and finite element solution.

  • PDF

Monitoring Rock Physical Property Changes due to Excavations Using Horizontal Crosshole Georadar Tomography (수평 시추공간 지오레이다 토모그래피를 이용한 터널 굴착에 의한 암반 물성 변화의 고찰)

  • Jung, Yun-Moon;Lee, Myung-Sung;Song, Myung-Jun;Woo, Ik
    • Tunnel and Underground Space
    • /
    • v.6 no.4
    • /
    • pp.342-347
    • /
    • 1996
  • The changes of electromagnetic wave velocity in rock were monitored to investigate rock behaviors due to the drill & blasting excavations through georadar tomography during the construction of the underground rock laboratory (5 m wide, 6 m high, and 140 m long) at Mabuk-Ri, Goosung-Myun, Yongin-Si, Kyunggi-Do. Two horizontal boreholes spaced 1.4 m apart were drilled parallel to the test tunnel before excavating it, high-resolution crosshole georadar tomography with about 500 MHz electromagnetic waves was performed at pre-excavation phase (May, 1996) and post-excavation phase (August, 1996). The data were acquired with the combination of 34 sources and 44 receivers with space of 0.3 m. Only 11 continuous receivers were selectively utilized with one fixed source. Sampling interval was 0.4 ns and each trace has 512 samples. The first arrival of each trace was picked manually with a picking software. The total number of rays used in inversion amounted to 34x11 and the size of pixel was determined to be 0.3 m. As an inversion technique, SIRT(Simultaneous Iterative Reconstruction Technique) was applied in this study. The velocity of electromagnetic waves at post-excavation phase decreased as large as 15% in comparison with that at pre-excavation phase, which may be attributed to the creation of micro-cracks in rock due to excavations and saturation with groundwater. Small amount of borehole deviation made a critical effect in radar tomography. Totally different tomograms were created after borehole deviation corrections.

  • PDF

Behavior of the Ground in Obliquely Crossed area Due to Tunnel Excavation Under the Existing Tunnel (기존터널에 근접하여 경사로 교차되는 하부터널굴착에 따른 교차부지반의 거동)

  • Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.4
    • /
    • pp.285-294
    • /
    • 2005
  • The behaviors of the ground in crossed zone and the existing upper tunnel in shallow cover due to the excavation of new lower tunnel crossed to that was studied. Model test was performed in the large scale test pit, the size was '$4.0m(width){\times}3.8m(height){\times}4.1m(length)$'. Test ground was constructed uniformly by sand in middle density and test with the crossed angle of $56^{\circ}$ (obliquely) were performed. The numerical analysis was performed on equal condition with model test. Results of the study by model test and numerical analysis show that earth pressure and settlement of the ground in crossed zone were redistributed due to the longitudinal arching effect by the excavation of lower tunnel. Model test shows that upper tunnel blocks stress flow due to the longitudinal arching effect by excavation of lower tunnel.

  • PDF

Development of 3-D Flow Model for Porous Media with Scenario-based Ground Excavation (지반굴착 시나리오 기반의 다공성 매질에 대한 3차원 유동해석모델 구축)

  • Cha, Jang-Hwan;Lee, Jae-Young;Kim, Woo-Seok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.10 no.1
    • /
    • pp.19-27
    • /
    • 2017
  • In recent years, ground subsidence has been frequently occurred by underground cavities due to the excessive groundwater inflow, caused by poor construction and management, during tunnel excavation and underground structure construction. In this study, a numerical model (SEEFLOW3D) was developed to estimate groundwater fluctuations for saturated-unsaturated poros media, evaluates the impact on ground excavation with open cut and non-open cut scenarios. In addition, the visual MODFLOW was applied to demonstrate the verification of the model compared with both results. Our results indicated that the RMSE and NRMSE was obtained to range over -3.95~5.7% and 0.56~4.62%, respectively. The developed model was expected to estimate groundwater discharges and apply analysis tool for optimum design of waterproof wall in future.

A Experimental Study of Rock Fragmentation with Plasma Method (플라즈마 공법에 의한 암석파괴의 실험적 연구)

  • Yoon, Ji-Son;Kim, Sang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.27-35
    • /
    • 2002
  • For the excavation of the rock, blast method is put into operation in most of the construction site in Korea. In comparison to other methods of excavation, blast method has many merits such as improvement in efficiency in operation, reducement of operation period, and etc. However, blast operation also creates much loss due to the blast vibration, noise, and fly rocks. Thus, in this study, we have examined main features, rock fragmentation effect and the application of plasma method the one of shallow vibration method. In this study, the attenuation exponent of blast method operated in the site was 1.39~1.40 and that of the plasma method was analysed to be 1.45~2.23. From the location where the distance between excavation location and observation location was over 15 m, most of excavation vibration were measured to be less than 0.2 kine(cm/sec), which is also the allowed standard value of sensitive buildings, such as cultural assets and computer facilities. According to the result of FFT(Fast Fourier Transform) analysis, the frequency measured through blast method in this site was 30~50 Hz and the frequency of plasma method ranges in between 30~130 Hz.

  • PDF