Abstract
When a new tunnel is excavated by the drill and blast method near pre-existing underground structures or tunnels due to the region restricted condition such as urban area, the ground will be relaxed by the excavation. In this case, issues can be created in terms of stability of pre-existing underground structures. One of major factors determining the stability of pre-existing underground structures can be a separation distance between pre-existing underground structures and a newly excavated tunnel. The region of ground relaxation defined by the plastic zone due to new excavation can be varied by separation distance. In this study, in other to estimate an influence of new tunnel excavation in terms of separation distance on the stability of pre-existing large pipelines, two-dimensional scaled model tests using plaster were performed for six models which have a different separation distance, The results show that based on the analysis of induced displacement during tunnel construction, the displacement decreases as the separation distance between large pipeline and new tunnel is increased until the distance is 2.5 times of pipeline diameter. Beyond this point, however, the displacement has become stabilized.
도심지 등 지역적인 여전에 의하여 기존의 지하 공동 또는 터널에 근접하여 발파를 이용한 새로운 터널을 굴착할 경우, 새로운 터널의 굴착으로 인하여 지반이 이완되고 따라서 기존 지하 공동의 안정성에 문제가 발생할 수 있다. 이러한 가존 지하 공동의 안정성에 문제를 발생시킬 수 있는 가장 큰 요소로는 기존 지하 공동과 신설 터널의 이격거리가 될 수 또한 신설 터널 굴착으로 인한 소성영역의 발생에 따른 지반 이완을 문제 심을 수 있다. 따라서 본 연구에서는 기존 광역 상수관과 신설 터널의 이격거리에 따른 기존 광역 상수관의 안정성을 평가하기 위하여 이격거라가 다른 여섯 가지 모델에 대해 석고를 이용힌 2차원 축소 모형실험을 실시하였다. 실험 결과는 터널 굴착과정과 파괴 단계에서 발생된 변위 벡터와 균열양상으로 표현하였다. 터널 굴착과정 중 발생하는 변위를 분석하면, 터널과 광역 상수관의 간격이 상수관 직경의 2.5배 (2.5D)까지는 이격거리가 증가함에 따라 감소하는 경향을 보인다. 그러나 중심 간격이 2.5D를 넘으면 추가변위는 발생하지 않았다.