Journal of the Korean Society of Hazard Mitigation
/
v.11
no.3
/
pp.91-96
/
2011
The design, construction and management of underground facilities as infrastructure of nation should be properly carried out. One of reasons for underground facilitie's failure is a non-proper construction of backfill materials. This is common for circular underground pipes. A non-proper compaction is the cause of settlement and decrease of performance of underground facilities. The use of controlled low strength materials is an alternative to reduce the couple of failure problems. The flowability, self-cementation, and non-compaction are the major advantages to use the controlled low strength materials. In this research, couple of recycled materials, such as in-situ soil, water-treatment sludge, and crumb rubbers, were adopted. The basic properties of each materials were determined according to KS or ASTM. Also, couple of laboratory tests were carried out to get the design parameters for geotechnical and roadway area.
Lee, Ji Yeon;Ryu, Ji Hui;Jeong, Da Woon;Ahn, Jong Wook
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.39
no.6
/
pp.371-380
/
2021
This study aims to design a tunnel part model for underpass and subway lines that correspond to tunnel sector among the underground facilities(structure types) covered in the integrated map of underground spaces. For this purpose, we compared and reviewed the characteristics of international standards related to tunnel data models. As a result, it was found that CityGML 3.0 - Tunnel module was the most suitable for designing a 3D tunnel data model. Afterwards we reviewed the legal and institutional regulations to derive the standard elements of the 3D tunnel data model. Then we conducted a demand survey targeting experts in related fields to derive standard elements for addition and extension of underpasses and subway lines. Based on the above process, we designed and presented a 3D tunnel data model using UML. This study is expected to be meaningful as a basic study to improve the utilization of tunnel model in the integrated map of underground spaces.
In this paper, the transmissivities obtained from the pulse test, the slug test and the constant head test were compared each other to assess an applicability and a reliability of the hydrogeological test method, which are commonly used to derive the hydrogeological properties of a crystalline rock at un underground research facility. When comparing the results of the pulse test and the slug test, the transmissivities were very similar in the entire test section of the medium. However, there was a little discrepancy in the results in the areas where the permeability is relatively high. The results of the constant head test on the same section showed the lower transmissivity than the results of the pulse test and the slug test on the highly permeable section. This difference in permeability was considered to be due to the difference in the radius of the hydraulic effect applied in each hydraulic test. When the heterogenetic distribution of fracture affects the hydrogeological properties on crystalline rock, it is believed that the hydrogeological characteristics can be explained through a constant head test or a constant flow rate test with a large hydraulic effective radius, as well as a pulse and a slug test that can identify hydrogeological properties in a relatively short time.
Journal of Korean Tunnelling and Underground Space Association
/
v.25
no.6
/
pp.555-567
/
2023
The cracks in the tunnel are currently determined through visual inspections conducted by inspectors based on images acquired using tunnel imaging acquisition systems. This labor-intensive approach, relying on inspectors, has inherent limitations as it is subject to their subjective judgments. Recently research efforts have actively explored the use of deep learning to automatically detect tunnel cracks. However, most studies utilize public datasets or lack sufficient objectivity in the analysis process, making it challenging to apply them effectively in practical operations. In this study, we selected test datasets consisting of images in the same format as those obtained from the actual inspection system to perform an objective evaluation of deep learning models. Additionally, we introduced ensemble techniques to complement the strengths and weaknesses of the deep learning models, thereby improving the accuracy of crack detection. As a result, we achieved high recall rates of 80%, 88%, and 89% for cracks with sizes of 0.2 mm, 0.3 mm, and 0.5 mm, respectively, in the test images. In addition, the crack detection result of deep learning included numerous cracks that the inspector could not find. if cracks are detected with sufficient accuracy in a more objective evaluation by selecting images from other tunnels that were not used in this study, it is judged that deep learning will be able to be introduced to facility safety inspection.
Kim, Jong-Gwan;Yang, Hyung-Sik;Kim, Won-Beom;Jang, Myoung-Hwan;Ha, Tae-Wook
Tunnel and Underground Space
/
v.20
no.3
/
pp.145-152
/
2010
In this study, a survey of structural geology and discontinuities were carried out on the space in a limestone mine where the construction of crushing facilities is in planning. The stability of the site was analyzed by rock mass classifications and numerical analysis. Through these analyses, it could be known that removal of pillars could make the stability problems in the mine and the supports for pillars must be considered.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.52
no.12
/
pp.602-607
/
2003
We show three-dimensional distribution of voltages resulted from the leakage current originated from outdoor electrical facilities in a submerged area. In case these facilities are grounded by the neutral line multiple grounding method, the existence of ungrounded electrical facilities can cause a disastrous effect on near-by passengers. In order to investigate this situation, we installed a real-scale test field for the experiment type I (for the leakage current path between a enclosure grounded electrical facility and another enclosure grounded one), and that for the experiment type II (for the leakage current path between a enclosure grounded electrical facility and another ungrounded one). For both cases, we carried out three-dimensional monitoring of the voltage distribution while varying additional conditions such as the exposure of the underground cables and the finishing of cable connection part. The result shows that a disastrous effect on human safety can arise from the leakage current without a pertinent measure for the construction and maintenance of outdoor electrical facilities.
Proceedings of the Korean Institute of Building Construction Conference
/
2006.11a
/
pp.127-131
/
2006
Depot have a lagged behind structure in the side of building up the view. With this reason, people have been recognized depot as hatred facility causes to have car noise, air pollution. In the other hand, depot become a underground and complex facility as a higher-value added building, and moreover, it need to understand the environment that depot structure have a specific field condition to apply green roof system. 1) Analysis proper waterproofing material and root barrier apply to depot need root penetrating test method 2) Suggest root barrier and waterproofing material relate to maintain and construction for green roof system 3) Construction condition for depot have crack movement of structure by vehicle vibration and root penetrating force by plant growth
Journal of the Korean Institute of Educational Facilities
/
v.24
no.1
/
pp.3-10
/
2017
This study is to analyze the remodeling method of library in terms of space extension method and urban regeneration by repurposing function in unused facilities through case study. In many case of library extension, horizontal extensions are more frequent than vertical extensions, because there are limits to extend vertically due to high live load estimation by book stacks. Extension schemes was organized by new building extension method in connection with existing buildings, attaching method small scaled mass or linear mass to existing building, connecting method a plurality of existing small buildings, vertical extension method on the top of the structure, underground extension method using special structure. Unused facility remodeling to the library, large scaled buildings can be developed completely to the function of the library through the relocation of the space, while small scaled building needs spatial extension. In the case of spatial extension, existing space that was used for other purposes can be used as a reading room or office, avoiding high live load estimation.
Industrial facilities need design to predict and reduce noise from design to prevent and reduce noise. The purpose of this study is to predict worker's environment and evaluate safety by analyzing noise inside underground blower room and air compressor room with fluid machinery in waste facility. This waste incineration facility was analyzed based on the ground floor, ground floor blower chamber, and air compressor chamber. The results of SPL(Sound Pressure Level) analysis at 1.5m away, which are frequently used to measure the SPL as a noise source, are as follows. SPL of basement level: 46.80[dB], SPL of ground layer: 48.57[dB]. As a result, it was expected that the noise level would be considerably lower than the 8 hours 50[dB] noise exposure per day.
Kim, Joon-Bum;Cho, Seong-Won;Kim, Jae-Min;Jung, Jong-Wook;Lim, Young-Bae;Jung, Jin-Soo
Proceedings of the KIEE Conference
/
2006.07d
/
pp.2079-2080
/
2006
지하상가와 같은 지하구내에 설치된 전기설비는 침수피해의 가능성이 상존한다. 그러므로 침수상황에서 재난복구를 위해 투입되는 인력에게 미칠 수 있는 2차 재해에 대한 안전성을 평가하고, 생명과 재산의 피해를 최소화 할 수 있는 적절한 대책이 필요하다. 본 연구에서는 먼저 지하구내 침수사고사례 조사를 통해 사고의 패턴을 분류하고 전기적 위해요소를 도출한다. 그리고 그것을 바탕으로 퍼지추론을 적용해서 침수상황을 통제하고 안전성을 평가하는 알고리즘과 시스템을 제안한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.