• 제목/요약/키워드: Uncertainty measurement

검색결과 926건 처리시간 0.029초

변압기철손 측정시스템의 측정 불확도 (Review of the measurement uncertainty of Tr no-load loss measuring system)

  • 강택수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.139-141
    • /
    • 2005
  • For the reliable evaluation of the distribution and power transformer no-load loss measurement, measurement uncertainty of the transformer measuring system, consisted of current transformer, potential transformer and power metering equipment is required. In this paper, we describe the uncertainty of transformer measuring system based on ANSI/IEEE C57.12.90.

  • PDF

방진장갑 진동 전달률 측정에서의 측정불확도 추정 (Estimation of the Measurement Uncertainty in Measuring the Vibration Transmissibility of Anti-vibration Gloves)

  • 홍석인;장한기;최석현
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2005년도 추계학술대회논문집
    • /
    • pp.251-254
    • /
    • 2005
  • In this study vibration transmissibilities of the selected anti-vibration gloves were measured, and the measurement uncertainty was estimated. Since human factors such as palm size, gripping condition and dynamic properties of the hand-arm effect the measurement a lot, it is necessary to know ow much the uncertainty is. This study takes the measurement procedure suggested in ISO 10819. Three subjects Joined at each test and each anti-vibration glove was tested twice per a subject. Average and standard deviation of vibration transmissibility were calculated and uncertainty of them were estimated at 95% confidence level.

  • PDF

Hot Leg Temperature Uncertainty due to Thermal Stratification

  • Jang, Ho-Cheol;Ju, Kyong-In;Kim, Young-Bo;Sul, Young-Sil;Cheong, Jong-Sik
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1996년도 춘계학술발표회논문집(2)
    • /
    • pp.29-35
    • /
    • 1996
  • For the Reactor Coolant System(RCS) flow rate measurement by the secondary calorimetric heat balance method, the coolant temperature of the hot leg is needed. Several Resistance Temperature Detectors(RTD) are installed in the hot leg to measure the temperature, but the average value of RTDs does not correctly represent the energy-averaged(bulk) temperature because of the thermal stratification phenomenon. Therefore some correction is introduced to predict the bulk temperature, but the correction inevitably contains uncertainty because the stratification is not defined well quantitatively yet. Therefore a large uncertainty for the correction has been used for the conservative estimation. But unrealistically large uncertainty causes degradation of the measurement method and yields difficulty to meet the acceptance criterion in start-up flow measurement test. In this paper, an analytical estimation is made on the correction and the related uncertainty using the measured hot leg velocity profile of System 80 reactor flow model test and the measured temperatures of YGN 3&4 and PVNGS 1&2 start-up tests. The results reveal that the magnitude of the correction uncertainty is much smaller than that used in the previous design. Therefore, the confidence on the flow rate measurement method can be improved and the difficulty in start-up flow measurement test can be lessened if the smaller correction uncertainty obtained through this estimation is applied.

  • PDF

가스터빈엔진 고공성능시험설비의 측정불확도 개선 (Improving the Measurement Uncertainty of Altitude Test Facility for Turbine Engines)

  • 윤민수;양인영;전용민;양수석
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집D
    • /
    • pp.777-781
    • /
    • 2001
  • An Altitude Engine Test Facility(AETF) was built at the Korea Aerospace Research Institute in October 1999 and has been being operated for altitude testing of the gas turbine engines of 3,000 Ibf class or less. The AETF has been calibrated using several engines such as J69 engine of Teledyne Co. as a facility checkout engine. Based on the test results, uncertainty analyses on the air flow rate and thrust were performed according to ASME PTC 19.1-1998. As the analyses showed that the level of uncertainty was not satisfactory over the whole operating envelop, several modifications of the facility and testing method were made in order to improve the measurement uncertainty. As a result, the uncertainty of the air flow measurement was improved by 0.1 % over all the test conditions, and the net thrust measurement by upto 3%. The improved measurement uncertainties of air flow and thrust are 0.68-0.73% and 0.4-1.3%, respectively.

  • PDF

Uncertainty Assessment using Monte Carlo Simulation in Net Thrust Measurement at AETF

  • Lee, Bo-Hwa;Lee, Kyung-Jae;Yang, In-Young;Yang, Soo-Seok;Lee, Dae-Sung
    • International Journal of Aeronautical and Space Sciences
    • /
    • 제8권2호
    • /
    • pp.126-131
    • /
    • 2007
  • In this paper, Monte Carlo Simulation (MCS) method was used as an uncertainty assessment tool for air flow, net thrust measurement. Uuncertainty sources of the net thrust measurement were analyzed, and the probability distribution characteristics of each source were discussed. Detailed MCS methodology was described including the effect of the number of simulation. Compared to the conventional sensitivity coefficient method, the MCS method has advantage in the uncertainty assessment. The MCS is comparatively simple, convenient and accurate, especially for complex or nonlinear measurement modeling equations. The uncertainty assessment result by MCS was compared with that of the conventional sensitivity coefficient method, and each method gave different result. The uncertainties in the net thrust measurement by the MCS and the conventional sensitivity coefficient method were 0.906% and 1.209%, respectively. It was concluded that the first order Taylor expansion in the conventional sensitivity coefficient method and the nonlinearity of model equation caused the difference. It was noted that the uncertainty assessment method should be selected carefully according to the mathematical characteristics of the model equation of the measurement.

PV모듈의 발전성능시험을 위한 Solar Simulator의 측정불확도 요인 분석 (Analysis of Solar Simulator's Uncertainty Factor for Maximum Output Power Test of Photovoltaic Module)

  • 강기환;김경수;박지홍;유권종;안형근;한득영
    • 한국태양에너지학회 논문집
    • /
    • 제27권1호
    • /
    • pp.39-45
    • /
    • 2007
  • In this paper, we analyzed the elements of measurement uncertainty on electrical performance test which are the most important things in photovoltaic module performance test. Repeating the performance test by 6 men, the measurement uncertainty could be calculated. In this experiment, Solar Simulator (A-Class pulse type) used for domestic certificate test of PV module is Pasan IIIb (Balval, Switzerland). The possible elements of the measurement uncertain that could effect electrical performance test of PV module are reference cell, spectrum correction, error from measurement repetition, test condition, stability and uniformity of artificial solar simulator. To find the measurement uncertainty, 6 men repeated the test by 10 times. And the results were that numerical average value was 124.44W and measurement uncertainty was $124.44W{\pm}0.36W$ with 95% confidence level for 125W PV module(KD-5125).

PV모듈의 I-V특성 시험을 위한 Solar Simulator의 측정불확도 요인 분석 (Analysis of Solar Simulator's Uncertainty Factor for Photovoltaic Module's I-V curve test)

  • 강기환;박지홍;김경수;유권종;안형근;한득영
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2006년도 하계학술대회 논문집 Vol.7
    • /
    • pp.5-7
    • /
    • 2006
  • In this paper, we analyzed the elements of measurement uncertainty on electrical performance test which are the most important things in photovoltaic module performance test. Repeating the performance test by 6 men, the measurement uncertainty could be calculated. In this experiment, Solar Simulator (A-Class pulse type) used for domestic certificate test of PV module is Pasan IIIb (Balval, Switzerland). The possible elements of the measurement uncertain that could effect electrical performance test of PV module are reference cell, spectrum correction, error from measurement repetition, test condition, stability and uniformity of artificial solar simulator. To find the measurement uncertainty, 6 men repeated the test by 10 times. And the results were that numerical average value was 124.44W and measurement uncertainty was $124.44W{\pm}0.75W$ with 95% confidence level for 125W PV module.

  • PDF

밭토양에서 폐쇄형 자동 챔버법으로 측정한 아산화질소 농도에 대한 측정 불확도 (Measurement Uncertainty of Nitrous Oxide Concentrations from a Upland Soil Measured by an Automated Open Closed Chamber Method)

  • 주옥정;강남구;임갑준
    • 한국환경농학회지
    • /
    • 제39권3호
    • /
    • pp.237-245
    • /
    • 2020
  • BACKGROUND: The closed chamber method is the most commonly used for measuring greenhouse gas emissions from upland fields. This method has the advantages of being simple, easily available and economical. However, uncertainty estimation is essential for accurate assessment of greenhouse gas emissions and verification of emission reductions. The nitrous oxide emissions from upland field is very important for the nitrogen budget in the agriculture sectors. Although assessment of uncertainty components affecting nitrous oxide emission from upland field is necessary to take account of dispersion characteristics, research on these uncertainty components is very rare to date. This study aims at elucidation of influencing factors on measurement uncertainty of nitrous oxide concentrations measured by an automated open closed chamber method from upland field. METHODS AND RESULTS: The nitrous oxide sampling system is located in the upland field in Gyeonggi-do Agricultural Research and Extension Services (37°13'22"N, 127°02'22"E). The primary measurement uncertainty components influencing nitrous oxide concentrations (influencing factors) investigated in this research are repeatability, reproducibility and calibration in the aspects of nitrous oxide sampling and analytical instrumentation. The magnitudes of the relative standard uncertainty of each influencing factor are quantified and compared. CONCLUSION: Results of this study show what influencing factors are more important in determination of nitrous oxide concentrations measured using the automated open closed chambers located in the monitoring site. Quantifying the measurement uncertainty of the nitrous oxide concentrations in this study would contribute to improving measurement quality of nitrous oxide fluxes.

Standard Measurement Procedure for Soil Radon Exhalation Rate and Its Uncertainty

  • Seo, Jihye;Nirwono, Muttaqin Margo;Park, Seong Jin;Lee, Sang Hoon
    • Journal of Radiation Protection and Research
    • /
    • 제43권1호
    • /
    • pp.29-38
    • /
    • 2018
  • Background: Radon contributing about 42% of annual average dose, mainly comes from soil. In this paper, standard measurement procedures for soil radon exhalation rate are suggested and their measurement uncertainties are analyzed. Materials and Methods: We used accumulation method for estimating surface exhalation rate. The closed-loop measurement system was made up with a RAD7 detector and a surface chamber. Radon activity concentrations in the system were observed as a function of time, with data collection of 5 and 15-minute and the measurement time of 4 hours. Linear and exponential fittings were used to obtain radon exhalation rates from observed data. Standard deviations of measurement uncertainties for two approaches were estimated using usual propagation rules. Results and Discussion: The exhalation rates (E) from linear approach, with 30 minutes measurement time were $44.8-48.6mBq{\cdot}m^{-2} {\cdot}s^{-1}$ or $2.14-2.32atom{\cdot}cm^{-2}{\cdot}s^{-1}$ with relative measurement uncertainty of about 10%. The contributions of fitting parameter A, volume (V) and surface (S) to the estimated measurement uncertainty of E were 59.8%, 30.1% and 10.1%, in average respectively. In exponential fitting, at 3-hour measurement we had E ranged of $51.6-69.2mBq{\cdot}m^{-2} {\cdot}s^{-1}$ or $2.46-3.30atom{\cdot}cm^{-2}{\cdot}s^{-1}$ with about 15% relative uncertainty. Fitting with 4-hour measurement resulted E about $51.3-68.2mBq{\cdot}m^{-2} {\cdot}s^{-1}$ or $2.45-3.25atom{\cdot}cm^{-2}{\cdot}s^{-1}$ with 10% relative uncertainty. The uncertainty contributions in exponential approach were 75.1%, 13.4%, 8.7%, and 2.9% for total decay constant k, fitting parameter B, V, and S, respectively. Conclusion: In obtaining exhalation rates, the linear approach is easy to apply, but by saturation feature of radon concentrations, the slope tends to decrease away from the expected slope for extended measurement time. For linear approach, measurement time of 1-hour or less was suggested. For exponential approach, the obtained exhalation rates showed similar values for any measurement time, but measurement time of 3-hour or more was suggested for about 10% relative uncertainty.

Assessment on shock pressure acquisition from underwater explosion using uncertainty of measurement

  • Moon, Seok-Jun;Kwon, Jeong-Il;Park, Jin-Woo;Chung, Jung-Hoon
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제9권6호
    • /
    • pp.589-597
    • /
    • 2017
  • This study aims to verify experimentally the specifications of the data acquisition system required for the precise measurement of signals in an underwater explosion (UNDEX) experiment. The three data acquisition systems with different specifications are applied to compare their precision relatively on maximum shock pressures from UNDEX. In addition, a method of assessing the acquired signals is suggested by introducing the concept of measurement uncertainty. The underwater explosion experiments are repeated five times under same conditions, and assessment is conducted on maximum quantities acquired from underwater pressure sensors. It is confirmed that the concept of measurement uncertainty is very useful method in accrediting the measurement results of UNDEX experiments.