고속의 주파수 계측 알고리즘을 갖는 저주파 계전기 설계 (The Design of UFR with Fast Frequency Measurement Technique)

  • 박종찬;김병진
    • 전기학회논문지P
    • /
    • 제55권1호
    • /
    • pp.1-5
    • /
    • 2006
  • In this paper, the frequency estimator and DFT filter gain compensation for UFR(Under Frequency protection Relay) is introduced. Due to the sudden appearance of generator loads or faults in power system, the frequency is supposed to deviate from its nominal value. Because a frequency calculation is based on phase information, it needs sufficient sampling data to figure out a precious frequency. Therefore the frequency measurement for UFR needs excellent qualities such as high speed and precision with low sampling frequency Authors propose the frequency estimator which compares the vector differences and the DFT filter gain compensation which identifies DFT filter error and correct it. Using the frequency estimator and compensation, UFR which has the 0.01[ms] calculation delay and 0.003[Hz] measurement error is implemented with digital processor.

대규모 발전단지 상시제약 감소를 위한 에너지 저장장치(ESS) 적용에 관한 연구 (A Study on Energy Storage System(ESS) Application for Dynamic Stability Improvement and Generation Constraint Reduction)

  • 이재걸;정솔영;최장흠;김용학;윤용범
    • 전기학회논문지
    • /
    • 제66권11호
    • /
    • pp.1554-1560
    • /
    • 2017
  • Prepare a lose of 765kV transmission route in power system operation condition, there are some Special Protection Scheme(SPS)s in Korean power system. These SPS can make some preselected generators are tripped to avoid generator overspeed. Because of many of the new large power plants are installed to existing power generation sites due to the siting problem, the number of generator tripped by SPS should be increased. But that can be a cause of system frequency change under the Under Frequency Relay(UFR) 1st pickup level 59.0Hz. Therefore generation constraint should be considered until new transmission lines are installed. In this paper, we propose the ESS application for generation constraint mitigation by frequency damping control of ESS. To analysis an effect of ESS application, we use PSS/E dynamic simulation tool, CBEST model and controller model. The proposed ESS application is applied to the empirical Korean power system.

풍력발전 한계운전용량에 대한 계통영향 분석 (Analysis of effect on power system considering the maximum penetration limit of wind power)

  • 명호산;김봉언;김형택;김세호
    • 한국태양에너지학회 논문집
    • /
    • 제32권3호
    • /
    • pp.19-25
    • /
    • 2012
  • About supply and demand to see that you need to match, the limitations of wind power capacity is low demand and the commitment of the general generator will exist between the minimum generation. if the turbine's output can be controlled, The limitation of wind power capacity will be adopted based on instant power generation. Namely, The minimum limits of wind power generation based load operation by calculating the amount that is higher than if the output should be restricted to highest operation. in this paper, we committed to the demand for low enough that the combination of the general generator of wind power capacity to accommodate the operation of determining whether the limit is intended to. For this, power system analysis program PSS/E was used, Jeju system by implementing the model simulations were performed.

발전제약완화용 배터리 ESS 효과 분석 및 기술 적용 (Analysis of Battery ESS Technology and its Effects for Generation Constraint)

  • 정솔영
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.45-50
    • /
    • 2021
  • 우리나라 서해안 및 동해안지역에는 대규모 발전단지가 집중되어 운영 중이며 이 발전단지들의 발전력을 송전하고 있는 765kV 송전선로 2 회선 고장이 발생하는 경우 송전선로의 용량부족으로 인해서 수 GW 규모의 발전력을 불시에 탈락시키도록 보호체계(SPS, Special Protection System)가 운영 중이다. 이 SPS 가 동작하여 대규모 공급능력이 불시에 상실되면 급격한 주파수 하락이 발생하게 되어 저주파수계전기(Under Frequency Relay, UFR)가 동작할 수 있기 때문에 SPS 탈락 발전기의 출력을 상시에 감소시키는 제약비발전(Constraint off)을 시행하고 있다. 이 제약비발전으로 인해 매년 수천억원의 제약비용이 발생하고 있기 때문에 제약을 완화시키기 위한 방안으로 배터리 에너지저장장치(BESS)를 적용하는 사업이 추진되고 있다. 이는 "발전제약완화 에너지저장장치(이하 발전제약완화용 ESS) 사업"으로 불리며 전국 19 개 변전소에 총 1.4GW(2C-Rate)의 에너지저장장치가 설치되는 국내 최대규모의 BESS 사업이다. 향후 송전망 확충에 의해서 발전제약이 해소되는 경우 주파수 조정용, 재생에너지 변동성 완화용 등의 다목적 ESS 로 활용될 계획이다. 본 보고서에서는 발전제약완화 ESS 사업의 기술적 효과를 실효치 기반의 시뮬레이션(PSS/E v33.3)을 통해서 검토하였다.