• 제목/요약/키워드: Turnkey project in construction

검색결과 23건 처리시간 0.022초

건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 - (The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim-)

  • 윤준선
    • 한국중재학회지:중재연구
    • /
    • 제15권3호
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

전환 정액일괄도급 계약방식 프로젝트의 리스크 분석 (Risk Assessment for the Converted Lump-sum Turnkey Project)

  • 황덕진;문승재;유호선
    • 플랜트 저널
    • /
    • 제7권2호
    • /
    • pp.39-43
    • /
    • 2011
  • Due to the recent uncertainty of market situations such as the escalation of petroleum prices, increased production capacities of plants, limitations of the available EPC (Engineering, Procurement, Construction) contractors, and the increase of raw material prices, EPC contractors have had a tendency to include a higher reserve contingency in the lump-sum turnkey contract price. In order to overcome the changes in the market, the plant project construction industry has started to apply the converted lump-sum turnkey contract in plant construction market. This study was focused to find the associated risks and to analyse the identified risks on recent trend of application of the new contract type, which is the converted lump-sum turnkey contract. It was recognized from the analysis that quality and cost have more high priority risks than other project objectives. This paper also suggests the mitigation plan for identified risks to achieve project objectives appropriate to the converted lump-sum turnkey project from the viewpoint of an EPC contractor keeping transparency with owner.

  • PDF

턴키공사 설계품질관리에 관한 연구(시공단계의 설계변경을 중심으로) (The Study of Quality Control in Engineering on the Turnkey Project(Focus on Change Orders at the Construction Phase))

  • 이용진;이택운;김진영;한충희;김선국
    • 한국건설관리학회논문집
    • /
    • 제2권3호
    • /
    • pp.58-66
    • /
    • 2001
  • 본 연구는 턴키공사의 문제점 가운데 설계변경에 있어 부실한 설계관리가 상당한 비중을 차지하고 있음에 착안하여, 당초의 설계물이 시공단계에서 설계변경을 초래하게 하는 제도적 문제점을 찾아보고, 현행 책임감리제도하에서 시공자가 수행하는 현장설계변경 절차를 ISO에서 권고하는 절차와 비교하여 그 개선 방안을 알아보고자 하였다. 설계변경상에서 나타나는 문제점으로는 첫째, 시공단계의 설계변경은 원 설계조직이 기술적 타당성, 전반적 완전성, 품질요건 등 사업 전체적 시각으로 검토하는 절차수립 및 이행이 요구되었으며, 둘째로 효율적인 설계관리를 위해서 사업의 조직 및 분장업무, 기술표준의 결정, 설계문서별 작성기준 등 설계계획 단계에서의 개선이 필요하며, 마지막으로 공동도급업체간 설계품질관리체계를 구축하여 설계정보의 공유, 사전검토, 확인 등으로 설계오류를 최소화하는 것이다.

  • PDF

설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석 (Case Study in Current State of Amount of Order for Turnkey Project)

  • 이양규;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.197-202
    • /
    • 2004
  • 설계$\cdot$시공일괄입찰제도는 기술인력이 부족한 발주자를 대신해서 건설사업을 효율적으로 수행할 수 있는 제도로서 공사기간의 단축이 가능하고, 건설공사의 품질향상, 설계와 시공의 통합에 의한 기술력제고 효과를 기대할 수 있으나, 상대적으로 계약자 측면에서는 책임 일원화에 따른 어려움이 발생되고 있다. 본 연구는 국내에서 운영되고 있는 설계$\cdot$시공일괄입찰제도 발주현황과 낙찰률 현황, 공종별 시행규모, 발주처별 시행규모, 심의방식 등을 분석하여 동 제도의 문제점을 구체적으로 분석하고자 하며, 기본적인 제도의 개선방안을 제시한다.

  • PDF

대형 건축 턴키공사의 클레임예방을 위한 클레임 요인 분석에 관한 연구 - 국내 사례를 중심으로 - (The Study on Analysis of the Claim Elements for Preventing the Potential Claim in a Large-Scale Turnkey-Base Building Project - Focused on Cases of Domestic Project -)

  • 윤준선
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.205-211
    • /
    • 2005
  • 국내의 연간 공사발주 물량의 약 $10\%$를 차지하고 있는 턴키공사는 발주처의 인력부족과 기술력부족으로 인하여 충분히 검토되지 못하고 진행되는 경우가 많으며, 발주자우위의 계약조항을 포함하고 있는 등의 문제점을 안고 진행되고 있다. 본 논문은 턴키공사가 가지고 있는 문제점으로 인하여 발생하게 될 클레임의 효과적인 예방을 위하여 현장에서 실제로 발생하고있는 클레임요인을 추출하고 영향도를 분석하여 그 결과를 실무에서 사용할 수 있도록 하는데 목적이 있다. 추출된 요인들에 대해서 전문가들에게 설문조사를 실시하여 턴키프로젝트에 미치는 영향도가 높은 클레임요인을 선별하고, 사례분석을 통한 클레임 금액의 조사를 실시하여 어떤 요인들이 클레임에 얼마나 영향을 미치는 지를 분석 검증하였다.

토목공사 수주현황 분석을 통한 턴키${\cdot}$대안입찰제도의 문제점 및 개선방안 연구 (Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects)

  • 이양규;강인석;박종혁;전성철
    • 한국철도학회논문집
    • /
    • 제8권5호
    • /
    • pp.460-469
    • /
    • 2005
  • Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

해외건설공사 EPC/Turnkey 계약조건 핵심 리스크 세부조항 도출 - FIDIC Silver Book 2017년 개정판 기준으로 - (Deriving Key Risk Sub-Clauses for EPC/Turnkey Contract Conditions for Overseas Construction Projects - Based on FIDIC Conditions of Contract for EPC/Turnkey Projects, second edition 2017 -)

  • 홍성열;제재용;서성철;박형근
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.101-110
    • /
    • 2022
  • 최근 세계 건설시장은 2025년까지 연 평균 4.8%씩 성장할 것으로 예상하고 있으며, 이에 따른 해외건설 리스크도 증가할 것으로 전망하고 있다. 특히, 국내 건설업체들은 EPC(Engineering, Procurement, Construction)/Turnkey 사업에 집중적으로 참여하였지만, 계약적 리스크에 대응하지 못한 결과, 2013년부터 수조원대의 해외사업 손실을 입은 경험이 있다. 그럼에도 불구하고, 지금까지 EPC/Turnkey의 계약적 핵심 리스크 세부조항 도출에 대한 연구는 많지 않았다. 따라서 본 연구에서는 국제컨설팅엔지니어링연맹(FIDIC)에서 발행한 2017년 Silver Book 계약조건을 대상으로 핵심 리스크 세부조항을 연구하였다. 이를 위해서 국제건설계약 경험이 10년 이상인 30인의 전문가를 패널로 구성하여 FIDIC Silver Book 21개 조항 170개 세부조항을 델파이 설문조사를 실시하여 62개의 주요 리스크 세부조항을 도출하였다. 또한, 최종적으로 FMEA(Failure Mode and Effect Analysis)기법을 활용하여 RPN(Risk Priority Number)을 산정하였으며, Critical Risk 범위에 속하는 25개의 핵심 리스크 세부조항을 도출하였다. 본 연구 결과를 통하여 실무관점에서는 해외건설사업에서 입찰 및 계약체결 단계에서 주의 깊게 검토해야 할 계약조항들에 대해 참조할 수 있게 해주고, 학문관점에서는 해외건설 EPC/Turnkey 사업에서 사용되는 계약분야에 대해 어떤 방식으로 연구해야 할지의 방향성과 기초적 지식을 제공하고 있다.

FIDIC의 EPC/Turnkey 프로젝트용 표준약관(標準約款)에 관한 연구(硏究) (A Study on the FIDIC's Conditions of Contract for EPC/Turnkey Projects)

  • 최명국
    • 무역상무연구
    • /
    • 제18권
    • /
    • pp.189-218
    • /
    • 2002
  • The EPC/Turnkey Contract goes to the extreme in allocating risks to the contractor and depending on the types of project, this may be regarded as unacceptable. It has also gone to the extreme in the extent to which the contractor is responsible for the specification and design of the Works. The employer is not responsible for correctness of any information provided by him nor for correctness of any specification or other matter included in the Employer's Requirements, except the definition of the intended purpose and criteria for testing and performance. With such conditions it is surprising that the employer is entitled to interfere in the contractors performance to an extent that is close to what is norm for a construction contract with employer design and with normal risk allocation. The combination of risk allocation and inappropriate administrative provisions makes the EPC/Turnkey Contract a document that will meet severe resistance from contractors. It is also likely that employers will see the risks and difficulties from their own perspective. It is a fiction that the EPC/Turnkey Contract will give the employer a contact with a certainty of final price and completion date. It is not a fiction that the EPC/Turnkey Contract carries many seeds for disputes between the parties. The Orange Book has become an accepted document even if it clearly contains some weaknesses. Some of these have been corrected in the Plant Contract. In my opinion FIDIC should let users become more familiar with the Plant Contract as a follow up to the Orange Book.

  • PDF

양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향 (A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement)

  • 박종순;신창준;유병기;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.5-12
    • /
    • 2008
  • 양산 부산대학교병원 건립공사는 종합병원 의료타운 신축 프로젝트이다. 계획단계부터 건설사업관리자(CMr)가 참가하여 설계 시공일괄사업자를 선정한 후, 실시설계 진행과정을 거쳐 시공단계, 시공이후단계에 이르기까지 프로젝트의 모든 단계에 건설사업관리(CM) 업무를 일관적으로 적용한 사례이다. 또한 설계와 시공의 추진에 Fast Track을 도입하여 공기단축에 성공한 것에 그 의미를 찾을 수 있다. 본 사례는 설계 이전단계에 설계시공일관업체를 선정하였으며, Fast Track수법의 적용을 염두에 둔 설계 및 공사일정계획, 설계단계의 설계관리, Fast Track에 입각한 단계별 공사발주 및 계약관리, 기본설계 실시설계단계의 VE 수행, 시공단계에서의 설계변경 관리, 시공 후 유지관리 단계의 운용관리 등 건설사업관리 업무가 모든 단계에서 다각적으로 제공되었다. 본 보고에서는 상기와 같은 건설사업관리 적용상의 과제와 개선방향, 특히 설계 시공일괄사업에서 효율적으로 CM 업무를 수행할 수 있는 방안을 제시하여, 초대형 턴키(Turnkey) 프로젝트의 CM적용에 기여하고자 한다.

  • PDF