• Title/Summary/Keyword: Tunnel site

Search Result 662, Processing Time 0.019 seconds

3D Resistivity Survey at a Collapsed Tunnel Site (붕락 터널에서의 3차원 전기비저항 탐사)

  • Cho, In-Ky;Kim, Ki-Seog;Lee, Keun-Soo
    • Geophysics and Geophysical Exploration
    • /
    • v.18 no.1
    • /
    • pp.14-20
    • /
    • 2015
  • Three-dimensional (3D) resistivity method is an effective tool in the engineering site survey because it can provide a 3D resistivity distribution of the site. In this study, we tried to find out faults, fractures and coal seams that can cause the collapse of the tunnel. We carried out 2D resistivity survey along 5 parallel lines and 11 cross lines and merged all the apparent resistivity data for 3D inversion. Finally, from the 3D resistivity image and drilling data we presented the 3D distribution of faults, fractures and coal seams that are considered the main cause of the tunnel collapse.

The Efficiency Evaluation of One Person Non-Prism Surveying System for Tunnel Measurement (터널계측을 위한 1인 무프리즘 측량시스템의 효율성 평가)

  • Park, Kyeong-Sik;Hahm, Chang-Hahk;Lee, Jae-Kee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.4
    • /
    • pp.89-96
    • /
    • 2007
  • The tunnel measurement data such as deficiency quantity, outbreak quantity, inner displacement and crown settlement are very important elements in tunnel sites under construction and obtained mostly by displacement gauge and total station. However, it is difficult and dangerous to install targets or measurement equipments on the points in tunnel construction site and also we need several persons to work in the tunnel. Non-prism total station with remote control system which is developed recently has various efficient functions for tunnel measurement. Therefore, for efficient tunnel measurement, this study suggested one person surveying system which consisted of non-prism total station and notebook PC to control total station remotely, and we evaluated the suggested tunnel measurement system. In this study, the tunnel site under construction was chosen as the test field and tunnel surveying was done by existing surveying method and suggested method separately. As result of the test, we analyzed processing time and accuracy to demonstrate the superiority of suggested one person non-prism surveying system.

  • PDF

Mapping Submarine Bathymetry and Geological Structure Using the Lineament Analysis Method

  • Kwon, O-Il;Baek, Yong;Kim, Jinhwan
    • The Journal of Engineering Geology
    • /
    • v.24 no.4
    • /
    • pp.455-461
    • /
    • 2014
  • The Honam-Jeju, Korea-Japan, and Korea-China subsea tunnel construction projects have drawn significant attention since the early 2000s. These subsea tunnels are much deeper than most existing natural shallow sea tunnels linking coastal areas. Thus, the need for developing new technologies for the site selection and construction of deep subsea tunnels has recently emerged, with the launch of a research project titled "Development of Key Subsea Tunnelling Technology" in 2013. A component of this research, an analysis of deep subsea geological structure, is currently underway. A ground investigation, such as a borehole or geophysical investigation, is generally carried out for tunnel design. However, when investigating a potential site for a deep subsea tunnel, borehole drilling requires equipment at the scale of offshore oil drilling. The huge cost of such an undertaking has raised the urgent need for methods to indirectly assess the local geological structure as much as possible to limit the need for repeated borehole investigations. This study introduces an indirect approach for assessing the geological structure of the seafloor through a submarine bathymetry analysis. The ultimate goal here is to develop an automated approach to the analysis of submarine geological structures, which may prove useful in the selection of future deep subsea tunnel sites.

Development of Expert System for Maintenance of Tunnel (II) (터널의 유지관리를 위한 전문가시스템 개발(II) : 수치해석을 통한 지식베이스 확장)

  • Kim, Do-Houn;Huh, Taik-Nyung;Lim, Yun-Mook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.2
    • /
    • pp.185-191
    • /
    • 2000
  • The safety problem of aged tunnels has been emphasized. For the effective maintenance, site inspection of tunnel structures and surrounding grounds are required periodically. Also, the determination of safety of tunnels is not a simple problem. So the role experienced engineer in the maintenance is very important and development of an expert system that can perform as the engineers, has been needed. In this study, from the results of numerical analysis in several case, new precision inspection rules which can substitute actual numerical analysis are determined by a commercial program FLAC and regression analysis under various parameters such as material property, lining thickness, overburden and laterial coefficients. They are added to the knowledge base to determine safety of tunnel lining. To verify the expert system, the results are compared with an existing tunnel diagnosis report. It can be concluded that the new rule are well represented the actual numerical analysis under various site conditions. Therefore it is expected that the systematic management for effective maintenance of tunnel structure will be possible.

  • PDF

An Experimental Study of Smoke Movement and Evacuation in Road Tunnel (도로터널내 연기거동 및 피난에 관한 실험적 연구)

  • Kang Hyun-Wook;Lee Ho-Seok;Shin Young-Wan;Lee In-Ki
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.335-340
    • /
    • 2005
  • Recently, According to increased tunnel accident, a matter of concern in tunnel fire safety is on an interesting trend. In case of tunnel fire, Evacuation is a primary factor for refugee safety. Therefore safety measures should be taken to increase capability of evacuation. Evacuation walking speed and characteristics of movement in tunnel is differ from building or outdoor site so, these characteristics must be considered in tunnel safety planning. In this study has performed to evaluate the smoke movement and characteristics of evacuation by full-scale test method. and aimed for basic data establishment in characteristics of evacuation for tunnel safety system design.

  • PDF

On The influence study to building by seoul sub-way construction 7-20 site Tunnel works. (서울지하철 7-20공구 터널 굴착으로 인한 지상 주택 구조물에 미치는 진동 소음 영향 조사연구)

  • Huh, Ginn
    • Explosives and Blasting
    • /
    • v.13 no.3
    • /
    • pp.7-18
    • /
    • 1995
  • On the Seoul sub-way tunnel works 7-20 site, Cautious blasting works were so effectivelly carried out. The vibration record were under 0.3cm/sec and blasting noise was under 80dB. Which was measured at the ground of house. At a result cautious blasting works under above allowable value was not influenced the structure of house and living conditions. On the architectural survey, They were some hair crack on the wall and floors but this was not a crack from blasting works.

  • PDF

On the Influence Study to Building by Seoul Sub-way(8-6 site) Tunnel works (서울지하철공사 8-6공구터널 발파작업으로 인한 진동, 소음이 지상주택가 구조물에 미치는 연구조사)

  • Huh Ginn;Cheon Sang Back
    • Explosives and Blasting
    • /
    • v.12 no.1
    • /
    • pp.5-31
    • /
    • 1994
  • On the Seoul Sub-way Tunnel works (8-6 site ). Cautious blasting works were so effectivelly tarried out the vibration record were under 0.3cm /sec and blasting noise was under 75dB which was measured at the ground of house. As a result cautious blasting works under above allowable value was not influenced the structure of house and living. On the architectural survey, There were some hair crack on the wall and floors but this was not a crack from balsting work.

  • PDF

1. NATM design changed into open type excavation on the 8 meter overburden of subway construction. (지하철 선로부 토피 8m의 경우 NATM공법설계를 개착공법으로 대체한 실례)

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.10 no.2
    • /
    • pp.3-7
    • /
    • 1992
  • Concerning to Taeku city subway construction project(1-4 site), the original design was adapted NATM Tunnel method to the 8 meter thickness of overburden. Surveyor checked sity and design material and finally decided to change into Open Cut method because overburden is not only below 1 1/2 times thickness of comparate Tunnel width but there is no traffic conjunction in job site.

  • PDF

Concept design and site characterization for the Underground Disposal Research Tunnel at KAERI site (원자력연구소내 지하 처분연구 시설 건설을 위한 지반조사 및 개념설계)

  • 권상기;박정화;조원진
    • Tunnel and Underground Space
    • /
    • v.14 no.3
    • /
    • pp.175-187
    • /
    • 2004
  • 고준위방사성폐기물 처분의 경우 심부 암반에 만들어진 처분장에 영구 처분하는 것이 최선의 방안으로 여겨지고 있다. 하지만 지하 심부의 암반에 대한 물리적, 화학적, 역학적, 열적, 수리적 물성과 이들과 핵종 이동의 관계, 처분환경에서의 공학적 방벽 및 암반의 거동이 처분장 안정성 및 안전성에 미치는 영향 등을 파악해야하는 어려움이 따른다. 특히 고준위폐기물 처분의 경우 장기간의 안전성을 고려해야하기 때문에 자연방벽과 공학적 방벽의 시간에 따른 거동변화도 고려하여야 할 필요가 있다. (중략)

Non-Destructive Test for Tunnel Lining Using Ground Penetrating Radar (지하레이다(GPR)를 이용한 터널 라이닝 비파괴시험에 관한 연구)

  • 김영근;이용호;정한중;신상범;조철현
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.274-283
    • /
    • 1997
  • It is necessary to estimate the soundness of tunnel using non-destructive tests(NDT) for effective repairs and maintenances. But, the state of tunnel lining could not be investigated using previous non-destructive techniques, due to the various types of support and accessibility only from one side in tunnel lining. Recently, the various non-destructive techniques such as ground penetrating radar(GPR) have been researched and developed for inspection of tunnel lining. In this study, the usefulness and applicability of GPR test in tunnel lining inspection has been investigated through model tests and tunnel site application. This paper described the tunnel lining inspection for lining thickness, cavity and support using GPR test. From the results of tests, we have concluded that GPR test are very useful and effective techniques to look into the interior of lining and measure the lining thickness.

  • PDF