시공단계를 고려한 대단면 정거장 터널 안정성 해석 (The stability analysis on large sectional tunnel station considering construction steps)

  • 강은구;김양운;안경철;한명식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1062-1068
    • /
    • 2009
  • Urban construction has numerous difficulties due to ground weakness and various complaints from third party, so it is not economically efficient and constructability is not favorable. Therefore, underground, which has good ground conditions, was used for construction field and facilities such as stations, and they are scaled up to enhance accommodation of facility limitation and function of stations. Large section tunnel station construction has numerous risk factors such as work boundary of excavation equipment, a relaxation of stress concentration, a safety plan of tunnel stability, and so on. Therefore, by using large section tunnel station stability analysis considering construction step, we expect to analyze the latent problem during construction, and to stabilize a future project plan of a large section structure design by using an auxiliary method and a support design.

  • PDF

지반의 한계변형률을 이용한 터널수치해석 및 현장 적용성 연구 (A Study on Numerical Analyses and Field Application for Tunneling Using the Critical Strain in the Ground)

  • 박시현
    • 지질공학
    • /
    • 제18권3호
    • /
    • pp.339-347
    • /
    • 2008
  • 본 연구는 지반의 한계변형률을 활용하여 터널의 정량적 안정성 평가를 수행한 것이다. 한계변형률은 지반재료에 대한 새로운 역학적 물성치의 하나이다. 한계변형률 개념은 터널굴착 현장에서 계측된 변위정보와 함께 굴착지반의 변형에 대한 한계치 설정에 활용될 수 있다. 이러한 목적을 위해서 본 연구에서는 한계변형률 개념을 터널 안정성 평가에 활용한 것이다. 먼저, 수치해석 프로그램을 이용하여 터널굴착시 발생한 변위를 역해석 기법에 의해 지반변형률로 산정한 후, 이를 한계변형률 개념에 의해 터널 안정성을 평가하였다. 이어서, 터널시공현장에서 계측된 변위정보를 활용하여 실증적으로 한계변형률 관점에서 터널안정성 평가를 수행하였다. 본 연구를 통해 한계변형률 개념에 의해 터널의 안정성을 정량적으로 평가하는 것이 가능한 것을 확인하였다.

초음속/극초음속 풍동(MAF)의 성능 향상을 위한 개조 및 검증 (Modificaion and Performance Test for improving ability of Supersonic/Hypersonic Wind Tunnel(MAF))

  • 최원혁;서동수;이재우;변영환
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2010년도 제35회 추계학술대회논문집
    • /
    • pp.717-722
    • /
    • 2010
  • 초음속 풍동은 실험하고자 하는 모델 주위에 인공적으로 초음속 유동장을 형성하여 모델에 작용하는 현상을 관찰 및 측정하는 실험 장비이다. 이러한 풍동 실험 장비는 비행체 설계에 있어 시제기를 제작하지 않고도 비행체 외형에 대한 공기역학적 특성을 파악하는데 유용하다. 본 연구에서는 러시아에서 제작된 초음속/극초음속 풍동(MAF : The Model Aerodynamic Facility)을 시험 시간 증가 및 활용성 증가를 목적으로 개조하였다. 안전성 확보 및 원격 작동을 위해 공압 밸브를 설치, 실험 시간의 증가를 위해 새 저장 탱크를 설치했다. 설치한 밸브와 탱크를 이용할 수 있도록 배관 시스템을 개조하였다. 또한 광학적 시험을 위하여 시험부의 광학창을 확장하였다. 개조 후 마하수 2,3,4에 대하여 성능 시험을 수행하였다. 유동가시화 기법중 하나인 Shadow graph 기법을 이용하여 초음속 유동장의 형성을 확인하였으며, 마하수 2,3,4에 대하여 Settling Chamber, Working section의 압력측정을 통해 성능 시험을 수행하였다. 결과로부터 해당 초음속 풍동에 사용가능한 모델 크기 및 시험 시간을 도출하였다.

  • PDF

근접시공에 대한 수로터널 지반조사 및 안정성 분석 (Site Investigation and stability analysis for water tunnel being neighboring construction)

  • 전제성;김기영;이상덕;김두준
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.550-555
    • /
    • 2005
  • In vicinity of Seoul, there has been water service tunnel that classified into 1st grade facility by special act for the safety control of public structures and with providing capacity equals to $1,543{\times}10^3$(ton/day) and inner pressure equals to $2.5-3.5kg/cm^2$. In this research, site investigation and stability analysis for water tunnel caused by new construction of road tunnel were carried out. the ground near water tunnel were zoned into spatial area having similar geotechnical characteristics and estimating geotechnical properties for each area. The site for analysis consists of banded biotite gneiss, biotite schist and granite gneiss with spatial non-homogeneity, and for that reason weathering and fault zone were distributed with large scale. It's important thing to consider spatial ground zone and their geotechnical properties properly into stability analysis at design and construction stage. Also, using results of site investigation, stability of existing tunnel have been analyzed for Hydraulic Fracture/Jacking and deformation in detail.

  • PDF

화재 발생시 환기방식에 따른 지하공동구내 열유동 특성 연구 (Characteristics of Fire-induced Thermal-Flowfields in an Underground Utility Tunnel with Ventilation)

  • 김홍식;황인주;김윤제
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 춘계학술대회
    • /
    • pp.1845-1850
    • /
    • 2003
  • The underground utility tunnels are important facility as a mainstay of country because of communication developments. The communication and electrical duct banks as well as various utility lines for urban life are installed in the underground utility tunnel systems. If a fire breaks out in this life-line tunnel, the function of the city will be discontinued and the huge damages are occurred. In order to improve the safety of life-line tunnel systems and the fire detection, the behaviors of the fire-induced smoke flow and temperature distribution are investigated. In this study we assumed that the fire is occurred at the contact or connection points of cable. Numerical calculations are carried out using different velocity of ventilation in utility tunnel. The fire source is modeled as a volumetric heat source. Three-dimensional flow and thermal characteristics in the underground tunnel are solved by means of FVM (Finite Volume Method) using SIMPLE algorithm and standard ${\kappa}-{\varepsilon}$ model for Reynolds stress terms. The numerical results of the fire-induced flow characteristics in an underground utility tunnel with different velocity of ventilation are graphically prepared and discussed.

  • PDF

관리도 기법을 이용한 터널 변위수렴 특성에 관한 연구 (A Study on Convergency of Tunnel Displacement using Control Chart Method)

  • 임성빈;김성권;서용석;박시현
    • 지질공학
    • /
    • 제17권2호
    • /
    • pp.197-204
    • /
    • 2007
  • 터널은 굴착에 의해 지반의 변형을 일으키며, 지보를 설치하고 시간이 지남에 따라 점차 안정화된다. 터널 굴착이 지반 거동에 미치는 영향은 계측지점과 막장간의 거리가 증가함에 따라 감소한다. 터널의 변위가 수렴하여 안정화되는 시점을 예측할 수 있다면, 안정화 이후 이루어지는 여러 공정들을 앞당김으로써 시간적, 경제적 손실을 줄일 수 있다. 따라서 본 연구에서는 변위 수렴 시점을 예측하기 위하여 관리도 기법을 적용하였다. 퇴적암을 기반으로 하는 터널에 대한 관리도 판정 결과, 막장에서부터의 거리가 최대 100 m 이내에서 변위가 수렴하였다.

재난안전관리를 위한 디지털 트윈 데이터셋 구조 연구 (A Study on the Dataset Structure of Digital Twin for Disaster and Safety Management)

  • 정기숙;정우석
    • 한국인터넷방송통신학회논문지
    • /
    • 제23권5호
    • /
    • pp.89-95
    • /
    • 2023
  • 지하공동구는 도시의 상하수, 전력, 통신 등과 같은 중요한 시설을 수용하여 관리하는 도시기반시설로 화재, 지진, 침수 등과 같은 재난으로부터 보호해야 하는 국가 시설이다. 예측, 예방, 대비, 대응, 복구 등의 재난안전 전주기 관리 체계를 구축함에 있어서 첨단 ICT 기술과 데이터가 융합된 디지털 트윈 기술을 활용하여 지하공동구의 재난안전관리 플랫폼을 개발 중에 있다. 이 논문에서는 재난안전 디지털 트윈에 대한 성숙도 모델을 살펴보고 각 성숙도 단계 별 재난안전 디지털 트윈 구현을 위해 필요한 데이터셋을 정의하였다. 정의된 데이터셋의 카테고리의 조합에 따라 성숙도 단계를 다르게 하여 디지털 트윈 구현이 가능하도록 구성하였다.

탄약저장시설 지하화에 따른 안전거리 축소방안 연구 (Study for Reducing Safety Distance by Installing Ammunition Storage Facility in Underground)

  • 박상우;전종훈;최항석;박영준
    • 한국건축시공학회지
    • /
    • 제20권3호
    • /
    • pp.253-260
    • /
    • 2020
  • 지하형 탄약고에 대한 관심이 증가하면서, 관련된 설계 결과가 다수 도출되고 있다. 그러나 터널 민간 전문가들뿐만 아니라 탄약관련 군 실무자들도 안전거리 기준을 완벽하게 숙지하지 못하여 안전거리 기준을 모두 준수한 신뢰성 있는 설계 결과는 도출되고 있지 않고 있는 실정이다. 또한 안전거리를 과하게 적용하여 부지를 비효율적으로 활용하거나 시공불가판정을 받는 사례도 보고되고 있다. 본 연구에서는 지하형 탄약고에 대한 안전거리 기준을 정리하고 이를 준수하면서 효율적으로 설계할 수 있는 방안에 대해 연구하였다. 또한 여러 방법 중 안전거리를 획기적으로 저감시킬 수 있는 방법을 도출하여 향후 지하형 탄약고 설계 및 시공 시에 적용할 수 있도록 데이터를 마련하였다.

교량 및 터널 시설물의 유지관리 의사결정을 위한 성능 예측 방법 개발 (Development of Performance Prediction Method for Bridge and Tunnel Management Decision-making)

  • 이동현;김지원;전태현;정원석;박기태
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제20권1호
    • /
    • pp.33-40
    • /
    • 2016
  • 본 연구에서는 비용예측모델과 성능예측모델을 이용하여 네트워크 레벨에서 향후 교량과 터널 유지관리 비용과 성능을 예측할 수 있는 방법론은 개발하였다. 현재 국내의 시설물 유지관리 관련 연구는 대부분 단일 시설물에 집중되어 있어 도로망차원의 네트워크 레벨 분석에는 적용하기 어렵다. 따라서 시설물군 단위로 유지관리 계획을 수립해야하는 실무주체에게 유의한 정보를 제공하지 못하고 있는 실정이다. 본 연구의 예측모델은 시설물의 성능에 현재 시특법에 의해 평가하고 있는 상태외 사용성과 기능성을 포함하였으며, 기본 분석과 확장 분석을 통해 각 시설물의 조치 시기와 연간 예산을 추정할 수 있다. 또한 사례 분석을 통해 기술적 타당성을 검증하였다. 본 연구의 방법론이 활성화된다면 다수의 시설물의 비용대비 미래 성능을 파악할 수 있으며, 효과적인 중장기 예산 수립을 할 수 있을 것으로 판단된다.

지하환기소 대단면 터널 시공 사례 연구 (A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System)

  • 노승환;최성욱;노상림
    • 터널과지하공간
    • /
    • 제27권4호
    • /
    • pp.195-204
    • /
    • 2017
  • 본 사례연구에서는 신림~봉천터널 지하환기소 대단면 터널의 시공 사례를 소개하였다. 환기갱(폭 7.8 m, 높이 6.6 m)에서 환기소(축류팬실, 폭 20.8 m, 높이 12.3 m)로 터널 단면이 확대되는 구간에 대해 안전성 및 시공성 등을 고려하여 점진적인 확대 굴착 방안 및 Q 시스템을 이용한 확폭 구간의 임시 보강 방안이 검토되었다. 확폭이 완료된 이후 대단면 터널은 현장의 암반조건을 확인하고, 전산해석을 이용한 터널의 안정성 검토 등을 통해 암반등급에 따라 굴진장을 일부 조정하고, 터널 상부 굴착을 분할 없이 전단면 굴착으로 변경하여 시공성을 향상시켰다. 본 사례연구에서 소개한 시공 사례가 향후 유사한 조건의 지하환기소 또는 4차로 도로 등의 대단면 터널의 설계 및 시공에 유용한 참고 자료가 될 수 있기를 기대한다.