Recently reclamation land is largely developed to utilize the land according to economic growth. The soil of landfill is soft, low shear strength, which makes it difficult to use the equipment. A large movement is occurred on the utility tunnel under construction. The inclined land with high water level and underground facilities are widely distributed and the excess pore water pressure may occur under construction similarly to this study. Some different conditions are made to design result, such as 4m of soil piling near the construction area, heavy rainfall during 2nd excavation that may cause flow liquefaction. To analyze the cause of transverse lateral movement, Three dimensional analysis are performed to four load cases, which is original design condition, flow liquefaction by heavy rainfall, unsymmetric lateral soil pressure, and both of them simultaneously. Ten steps of full construction stage, 1st excavation for utility tunnel, construction of utility tunnel, 1st refill, piling soil from 1m to 4 m, 2nd excavation for drainage culvert, liquefaction around the utility tunnel, construction of drainage culvert and 2nd refill, are take into account to investigate the cause of movement.
Journal of Korean Tunnelling and Underground Space Association
/
v.8
no.3
/
pp.219-225
/
2006
Although the round length for tunnel excavation has a major technical and economical impact in conventional tunnelling, there is no coherent procedure available for its determination. In this study, the influence of round length on the behaviour modes of weak rock tunnel was investigated by numerical analyses. Quantitative estimation of the behaviour modes of the face and the unsupported span was established by use of the safety factor for the face stability and the conditional chart. In addition, the optimum round length in the tunnel design stage was investigated based on the detail construction information such as cycle time and material costs. Although this proposed method has some restrictions, it is expected to provide useful information for the optimization of the tunnel excavation, especially in design stage.
Transportation and further expansion of social infrastructure was needed along the development of urbanization and population concentration. To use the underground space due to the lack of availability of land, it is inevitable to intersect between present structure and tunnel during construction. Soil grouting is one of the ground improvement methods to reinforce weak soil around the underground structures by injection of grouting liquid. Some of central columns of an upper structure are damaged during injection of grouting liquid by injection pressure. To investigate and improve the stability of the tunnel, three dimensional analysis are performed with full construction stages which includes the construction of present underpass, damaging columns of the underpass, reinforcing the columns by H-pile and shear walls, and excavation and construct tunnel. The arrangement of grouting holes such as curtain and horizontal type affects largely to the stability of upper structure and horizontal arrangement diminish the shear forces which is the cause of damage of central columns. The liquid injection type of reinforcement for tunnel is not recommended while the presence of upper structure with columns. Wall type reinforcing is utilize for permant support of upper structures which is affected by grouting injection pressure. H-pile is utilize for temporary support, but not for permanent since the sharing of shear forces is not much to shear wall during tunnel construction.
The influence of round length on the tunnel stability and construction cost is well acknowledged by many researchers and engineers but the coherent procedure is not available for its determination. In this study, the behaviour modes of the face and unsupported span was investigated for weak rock tunnel by a small scale model test, PFC3D and FDM analyses in consideration of the round length. Total five types of behaviour modes are defined and quantitative estimation of the behaviour modes was established in terms of the safety factor for the face stability and the conditional chart. Although the proposed method has some restrictions, this method can provide useful information for the optimization of the round length and excavation, especially in design stage.
Because recently(July 14, 2011) fire occurred in the engine room of a moving taxi under Namsan Tunnel 1, 51 vehicles' driver and more than 250 passengers in the road tunnel were urgently evacuated with abandoned vehicles. Vehicle fires in Namsan Tunnel that day, Sufferers struggled to escape quickly difficult to escape the two-way by abandoned vehicles on the road and to fear many casualties by using vehicle fuel and combustible interior and the driver who is ignorant of vehicle accident continuous entered in the road tunnel had accessibility the site of fire department was more difficult. In this study, It is to investigate structure and basic materials, such as fire extinguish equipment and facilities for damage prevention and to analyze the problems and to plan improvement method of fire extinguish equipment, facilities for damage prevention and transportation facilities(Large traffic signs, Breaker, etc.) on the Namsan Tunnel that in the long-term plan is prepared to strengthen for accessibility of the site of fire department in case of Vehicle's fire.
Where an interchange is located just after a tunnel not only it is impossible to install the traffic signs in tunnel sections but also sufficient sight distance to identify the interchange can't be provided. The objective of this study is to suggest the safety based spacing between tunnel and interchange. For this study accident rate was used as an index representing characteristics for vehicle operation to suggest the appropriate spacing. Traffic volume and the number of accidents on freeway from 1992 to 1997 were analyzed. The relationship between accident rate and spacing represents negative logarithm function such that shorter spacing increases accident rate. An appropriate safety based spacing between tunnel and interchange for four lane freeway with the design speed of 100kph was found as 2.6km.
The Journal of the Convergence on Culture Technology
/
v.8
no.6
/
pp.757-763
/
2022
In the NATM tunnel construction method for urban subway and underpass construction, various causes of disaster exist. In this study, in order to analyze the importance of disaster influencing factors during NATM tunnel excavation, the possible risk factors were analyzed through prior research such as drilling, charging and blasting, It was divided into the work items of wrinkle treatment, pumice cleanup, and support materials. Next, the final 21 detailed measurement indicators were selected through the FGI survey of related experts, and AHP (Analytic Hierarchy Process) analysis were conducted. As a result, it was found that the workers involved in the tunnel construction were the most influential disaster influencing factor.
Journal of Korean Tunnelling and Underground Space Association
/
v.8
no.4
/
pp.325-334
/
2006
Understanding the airflow characteristics within the canopy structure installed between closely adjacent tunnels either for light adaptation or for protection from snow hazards is required for the normal ventilation as well as safety system design. Grade, horizontal alignment, cross-sectional area and shape are known to substantially influence the fire smoke behavior and their influences raise great concern for the safety design. This paper aims at studying the effects of tunnel geometrical characteristics and canopy installation on the ventilation and fire propagation through CFD analysis. In the case of 145m long canopy, 50% opening ratio is preferred with respect to the airflow pattern and ventilation efficiency. When a 20MW fire occurs in a 1.8km-long tunnel and four 1250mm reversible jet fans are instantly turned on, smoke concentration at 40m downstream of the fire decrease 13% for the upgrade tunnel with 2% gradient and increases 20% for -2% gradient, compared to the standard horizontal tunnel. Backlayering is observed within 45m-long segment toward the entrance in 2% down-graded tunnel. In a rectangular tunnel, there is no significant difference of smoke concentration as well as velocity profile from the standard crown tunnel. Three-laned tunnel shows lower level of both profiles and backlayering is detected up to 50m upstream of the fire, while the risky situation rapidly disappears thereafter.
Journal of Korean Tunnelling and Underground Space Association
/
v.26
no.2
/
pp.113-128
/
2024
Items of road tunnel PISD (Precise Inspection for Safety and Diagnosis) were reviewed and analyzed using newly enhanced MMS (Mobile Mapping System) technology. Possible items with MMS can be visual inspection, survey and non-destructive test, structural analysis, and maintenance plan. The resolution of 3D point cloud decreased when the vehicle speed of MMS is too fast while the calibration error increased when it is too slow. The speed measurement of 50 km/h is determined to be effective in this study. Although image resolution by MMS has a limit to evaluating the width of crack with high precision, it can be used as data to identify the status of facilities in the tunnel and determine whether they meet disaster prevention management code of tunnel. 3D point cloud with MMS can be applicable for matching of cross-section and also possible for the variation of longitudinal survey, which can intuitively check vehicle clearance throughout the road tunnel. Compared with the measurement of current PISD, number of test and location of survey is randomly sampled, the continuous measurement with MMS for environment condition can be effective and meaningful for precise estimation in various analysis.
Kim, Yongon;Ok, Seung-Yong;Kim, Il Gyu;Ryu, Seonho;Bae, Jungjoo
Journal of the Korean Society of Safety
/
v.31
no.5
/
pp.67-73
/
2016
This study investigates the seismic performance of the surge tank which is of the atmospheric type and constructed above the ground. For that purpose, three different numerical models of the surge tank have been taken into account. Two models are constructed to describe the surge tank with different support conditions: one is to model all supports as fixed, and the other is to use spring element for the rock conditions. The third model is constructed to describe not only the surge tank with spring element of the rocks but also the vertical waterway tunnel. Through the time-history analysis of the surge tank subjected to three artificially excited ground motions, it is demonstrated that there can be much difference between the three models of our interest according to the support conditions and inclusion of the vertical waterway tunnel. However, their seismic performances still remain below the safety criteria, i.e., dynamic allowable stress. Also, the numerical results let us know where the critical sections occur. These results could be used to develop the efficient seismic enhancement method for the surge tank.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.