• Title/Summary/Keyword: Tunnel maintenance monitoring

Search Result 53, Processing Time 0.019 seconds

A Safety Analysis of Tunnel Lining for Monitoring (계측에 의한 터널 라이닝의 안전성 분석)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.103-110
    • /
    • 2002
  • Maintenance monitoring of the tunnel which offers continuous data during and after tunneling has been applying to tunnels in order to meet the maintenance of tunnel and to confirm continuous security of the tunnel after tunneling. But, the maintenance monitoring of tunnel results for long period is not easy to find, and moreover, the rational analysis method on tunnel monitoring has not been established yet. In this study, the relationships between displacement and stress of the tunnel concrete lining using various analysis methods are compared with maintenance monitoring. The tunnel behavior were measured in the subway tunnel passing comparative soft the weathering and analyzed both security and mechanical characteristics of the tunnel concrete lining. Also, analyzed relationship between residual water pressure applied on tunnel design and one obtained by monitoring.

Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel (지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안)

  • Woo, Jong-Tae;Kim, Jong-Soo;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

Stress Analysis of Tunnel Concrete Lining for Maintenance Monitoring (유지관리 계측에 의한 터널 콘크리트 라이닝의 응력 분석)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea Concrete Institute
    • /
    • v.14 no.3
    • /
    • pp.341-348
    • /
    • 2002
  • The purpose of maintenance monitoring is to offer the objective and continuous data in order to be lasting security affirmation and best fitted maintenance of tunnel structure. Though recently the examples of maintenance monitoring which Is applied to tunnel are rapidly increasing, long-term measured monitoring actual results and rationally analysis method researches are wholly lacking. In this study, it is analyzed that the relationship of stress and reinforcement stress of concrete lining, i.e., last support materials of tunnel through regression analysis based on the monitoring result of the subway tunnel, which was accomplished the monitoring for long period, passing the weathering. Also, through the analysis of the stress and the safety of concrete lining, it is estimated that the frequency of maintenance monitoring and the in-situ application of the criteria value of management.

A Study on the Mechanical Characteristics of Tunnel Structures and Ground Behavior by Synthetic Analysis Method with Tunnel Monitoring Results used (터널의 계측결과 종합분석에 의한 지반의 거동 및 터널 구조체의 역학적 특성 연구)

  • Woo, Jong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.3
    • /
    • pp.115-124
    • /
    • 2003
  • In this study, the relationships between the displacement and stress of the tunnel using various analysis methods were compared with monitoring results carried out during construction and maintenance monitoring. The behavior of tunnel were measured in the subway tunnel passing comparative soft the weathering and analyzed both security and mechanical characteristics of the tunnel lining. With the results of simplified monitoring observed in top heading and bench excavation tunnel, it is confirmed that the crown settlement is larger than the surface settlement. it is interesting to note that the crown settlement and the crown shotcrete lining stress are widely used monitoring items for the back analysis. It is analyzed that the residual water pressure applied in the drainage type tunnel is reasonable.

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.

A Case Study for Quality Confirmation and Maintenance Monitoring of Tunnel Underpassing the Han River (하저터널 품질확인 및 유지관리 계측 연구)

  • Woo, Jong Tae;Yang, Tae Seon;Koo, Jai Dong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.2
    • /
    • pp.185-194
    • /
    • 1998
  • This paper shows a case study on quality confirmation and maintenance monitoring of the tunnel underpassing the Han River. First of all, when it comes to the quality confirmation, soil investigation techniques and shotcrete core test will be improved. On the construction stages, quality control procedures are needed. Second, on the maintenance monitoring, it is the main tool to control stability and safety of the tunnel structures throughout the construction period. On the geotechnical monitoring instrumentation, some considerations such as installation of monitoring sections in time, immediate base readings, adequate reading frequency, etc - shall be improved.

  • PDF

A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel (터널 유지관리계측의 측정 및 분석주기 설정 연구)

  • Woo, Jong-Tae;Lee, Kang-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

A study on estimation of the total loss and damage ratio of maintenance monitoring sensor of subway tunnel (지하철 터널 유지관리 계측센서의 총 손망실율 산정 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.25-31
    • /
    • 2013
  • In this study, the total loss and damage ratio of maintenance monitoring which is installed and operated in the domestic and foreign tunnel structure is researched and analyzed for estimating the loss and damage ratio of maintenance monitoring sensor of subway tunnel. The total loss and damage ratio at the elapsed time of 5-6 years after installation is 14.2% in the Seoul metro line no.5,6 and 7, 14.8% in the section 1 of the Seoul metro line no.9, 13.9% in the Channel tunnel of England and all of them are close to 15%. Therefore, it is reasonable to reflect that the total loss and damage ratio of maintenance monitoring sensor of subway tunnel is estimated provisionally 15% on design, and hence the study of the loss and damage ratio with the number of elapsed years in long-term by the measurement category will be needed.

Case Study on Technology and Regulation Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 기술 및 제도 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.303-308
    • /
    • 2000
  • By means of analyzing of monitoring technology and monitoring regulation based on maintenance monitoring system installed in subway tunnel section, it needs monitoring system, development of operating program, monitoring analyzing system and development of analysis method, establishment of maintenance monitoring standard specification, and performance of responsible monitoring supervision for applying to subway monitoring maintenance effectively in future. It requires specialized monitoring and legislation of monitoring subcontract, improvement of monitoring work contract method, establishment the standard payment of monitoring, and effective calibration and correction of monitoring system in the plan of improving monitoring regulation.

  • PDF