Damage Mechanism of Drift Ice Impact

  • Gong, Li;Wang, Zhonghui;Li, Yaxian;Jin, Chunling;Wang, Jing
    • Journal of Information Processing Systems
    • /
    • v.15 no.6
    • /
    • pp.1350-1364
    • /
    • 2019
  • The ice damage occurs frequently in cold and dry region of western China in winter ice period and spring thaw period. In the drift ice condition, it is easy to form different extrusion force or impact force to damage tunnel lining, causing project failure. The failure project could not arrive the original planning and construction goal, giving rise to the water allocation pressure which influences diversion irrigation and farming production in spring. This study conducts the theoretical study on contact-impact algorithm of drift ices crashing diversion tunnel based on the symmetric penalty function in finite element theory. ANSYS/LS-DYNA is adopted as the platform to establish tunnel model and drift ice model. LS-DYNA SOLVER is used as the solver and LS-PREPOST is used to do post-processing, analyzing the damage degrees of drift ices on tunnel. Constructing physical model in the experiment to verify and reveal the impact damage mechanism of drift ices on diversion tunnel. The software simulation results and the experiment results show that tunnel lining surface will form varying degree deformation and failure when drift ices crash tunnel lining on different velocity, different plan size and different thickness of drift ice. The researches also show that there are damages of drift ice impact force on tunnel lining in the thawing period in cold and dry region. By long time water scouring, the tunnel lining surfaces are broken and falling off which breaks the strength and stability of the structure.

Modern High-Power TBM with Advanced Procurement System (오늘날의 고성능 TBM과 선진 장비조달 방안)

  • Jee, Warren W.
    • Tunnel and Underground Space
    • /
    • v.23 no.3
    • /
    • pp.161-168
    • /
    • 2013
  • Recently, the application of High-Power mechanized tunnelling technology has been expended around the world. Especially, High-power Modern TBM machines are used in a successful results. Essential for the great success of this modern TBM in difficult rock conditions are based on the development of machine power, suitable better cutter developments, and also developed assesment technology regards on the extensive site investigations. OPP (Owner Procurement Process) system is a proven alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures the TBMs and tunnel lining in advance of the tunnel contract procurement and provides TBM to a tunnel contractor with a goals of reducing project risks and accelerating project schedule. Depending on the blasting vibrations and noises, mechanized tunnelling will be more important particularly in city areas.

An Impact Analysis of the Korea-Japan Undersea Tunnel Project;focus on Economic Potential Model Analysis (한일간 해저터널사업의 효과분석;성장잠재력 분석을 중심으로)

  • Park, Jin-Hee
    • Journal of Navigation and Port Research
    • /
    • v.32 no.1
    • /
    • pp.47-56
    • /
    • 2008
  • With rapid growing of the Northeastern Asia, the interest for the connection of Infrastructure that was behind of interesting until now is getting larger. In a line of same connection, UN-ESCAP are forwarding transcontinental railway project, asian highway project et al.. And this study aimed at analysis on the effect that extended to a space by Korea-Japan undersea tunnel project. In aspect of a national land balanced-development to solve various problems such as overcrowding in capital region, unbalanced state by regions, weak exchange between South and North Korea, and weakness of national land basis to prepare for unification et al., this study consulted the economic potentiality model as a analysis method to examine an effect. In this analysis, I used 24 scenarios including all cases by combination of 3 scenarios for Korea-Japan undersea tunnel, 4 scenarios for transportation modes in the section of undersea tunnel, and 2 scenarios for adjacency infrastructure. Transportation modes in the section of undersea tunnel are railway, car-train, mixing way of railway and car-train, and mixing way of road and railway. Adjacency infrastructure applied railway and road. In all scenarios, Korea showed higher growth potentiality than Japan. Also, proposal plan C route relatively showed better in national land balanced-development than other proposal plans. The growth potentiality relatively appeared higher by buildup of a connection together with non-capital regions from the construction of Korea-Japan undersea tunnel. In aspect of Northeastern Asia, it resulted in a increasing of trade and chance of network formation in the region of Asia through infrastructure connection. But, in considering passenger and various factors that extended to the economic growth, this analysis have some limitation. Therefore, I hope that deep studies will continuously perform with various factors.

Case Study of Shield Tunnel Construction : Incheon Metro Line 1 Geomdan Extension Phase 1 Project (쉴드TBM 터널 시공 사례 : 인천도시철도1호선 검단연장선 1공구)

  • Byungkwan Park;Chaeman Joo;Dohak Huh;Hyunsup Song;Gwangsu Joo;Dohoon Kim;Minsang Lee
    • Tunnel and Underground Space
    • /
    • v.34 no.3
    • /
    • pp.185-195
    • /
    • 2024
  • The Incheon Metro Line 1 Geomdan Extension Phase 1 is the first project in South Korea where both a roadheader and TBM (Tunnel Boring Machine) are being used together. The shield TBM tunnel section is 1,057 m long, and is mostly composed of rock, including the section beneath the Airport Railroad and the Gyeongin Ara Waterway. A 7.8 m earth pressure balance shield TBM was used for tunnel excavation. The average monthly advance rate for both the North and South tracks is 239.1 m, with a maximum monthly advance rate of 334.5 m. This technical article comprehensively evaluates the productivity of the shield TBM, focusing on the TBM excavation performance. Above all, it aims to provide useful reference material for the successful execution of shield TBM tunnel construction.

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

Ontology for estimating excavation duration for smart construction of hard rock tunnel projects under resource constraint

  • Yang, Shuhan;Ren, Zhihao;Kim, Jung In
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.222-229
    • /
    • 2022
  • Although stochastic programming and feedback control approaches could efficiently mitigate the overdue risks caused by inherent uncertainties in ground conditions, the lack of formal representations of planners' rationales for resource allocation still prevents planners from applying these approaches due to the inability to consider comprehensive resource allocation policies for hard rock tunnel projects. To overcome the limitations, the authors developed an ontology that represents the project duration estimation rationales, considering the impacts of ground conditions, excavation methods, project states, resources (i.e., given equipment fleet), and resource allocation policies (RAPs). This ontology consists of 5 main classes with 22 subclasses. It enables planners to explicitly and comprehensively represent the necessary information to rapidly and consistently estimate the excavation durations during construction. 10 rule sets (i.e., policies) are considered and categorized into two types: non-progress-related and progress-related policies. In order to provide simplified information about the remaining durations of phases for progress-related policies, the ontology also represents encoding principles. The estimation of excavation schedules is carried out based on a hypothetical example considering two types of policies. The estimation results reveal the feasibility, potential for flexibility, and comprehensiveness of the developed ontology. Further research to improve the duration estimation methodology is warranted.

  • PDF

Simplification of Tunnel Support System in Karst (석회암 공동발달지역의 터널지보패턴개발에 대한 연구)

  • 김상환;허종석;전덕찬
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.281-288
    • /
    • 2003
  • In karst formation area, the tunnel support system is an important factor for the tunnel safety during operation. This paper presents the simplified tunnel support systems to be adopt in karst formation. For the tunnel planned in the project area, karst features and the expected scenarios in the tunnel area were developed based on the results of the geological and geotechnical assessment. In order to provide specific supporting system and construction details for a wide range of possible karst features, the generalized typical support systems are developed according to the classification of karst features. In addition, the initial support systems and construction sequence for each karst feature are also presented in this paper.

  • PDF

Development of An Internet-Based Tunnel Construction Risk Management System (Internet 기반의 터널 시공 위험도 관리 시스템 개발)

  • 유충식;김재훈;박영진;유정훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.679-686
    • /
    • 2002
  • A substantial portion of the cost of a tunnelling project in urban environments is, therefore, devoted to prevent ground movement. Therefore, prediction of ground movements and assessment of risk of damage to adjacent buildings has become an essential part of the planning, design, and construction of a tunnelling project in the urban environments. An internet-based tunnelling-induced ground movements and building damage assessment system (IT-TURIMS) was developed and implemented to Daegu Metro Subway Line tunnel construction project in Korea. This paper describes the concept and implementation of IT-TURIMS. Practical significance of tunnelling risk assessment is also discussed.

  • PDF

Design of the Oslofjord Subsea Tunnel: A Case Study (노르웨이 Oslofjord 해저터널의 설계경향)

  • Shin, Hee-Soon;Park, Eui-Sub
    • Tunnel and Underground Space
    • /
    • v.17 no.1 s.66
    • /
    • pp.1-8
    • /
    • 2007
  • In Norway, about 30 subsea tunnels have been constructed over the last 20 years. The minimum depth of 17 subsea tunnels is 56 m and rock cover are between 23 and 49 m. As the project areas for subsea tunnel are covered by water, special investigation techniques need to be applied and the investigation results are more uncertain than that of most conventional tunnel projects. The indefinite potential of water inflow and the salinic character of ingress water represent considerable problems for tunnel equipment and rock support materials. The least stable conditions are represented by major faults or weakness zones containing heavily crushed rock and clay gouge. This paper introduces the Oslofjord subsea tunnel project including minimum rock cover requirement, risk of water inflow, investigation costs, construction costs, and traffic & operation costs.

Determination of the Construction Method for Young Dong Tunnel by Risk Assessment (위험도 분석기법에 의한 영동선 터널의 굴착공법 결정사례)

  • Kim, Yong-Il;Hencher, S.R.;Yoon, Young-Hoon;Cho, Sang-Kook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.13-25
    • /
    • 2002
  • The construction method for Young Dong Tunnel has been chosen following detailed risk assessment. In this paper, the specific risks to the project programme, associated with adopting either mechanical excavation in the form of a shielded TBM, or drill and blast excavation methods, are assessed. From the risk assessment results, and taking other important factors into account, such as project sensitivity and local experience, the recommendation is made that the relatively low risk drill-and-blast method is the most appropriate for construction of Young Dong Tunnel.

  • PDF