• Title/Summary/Keyword: Tunnel Interface

Search Result 169, Processing Time 0.028 seconds

건설-IT융합 기술을 위한 터널 환경에서 무선 메쉬 네트워크를 이용한 실험적 성능 검증 (Empirical Evaluation of Wireless Mesh Networks for Construction IT in Tunnel Environments)

  • 양창모;이승범;최수환;엄두섭
    • 한국IT서비스학회지
    • /
    • 제10권2호
    • /
    • pp.271-279
    • /
    • 2011
  • This paper draws performance results through comparing WMNs' methods when the WMNs are used in tunnel construction sites. There are many advantages of WMNs : lower cost, easy to network maintenance, robustness and reliability within RF-ranges. As a result, using the WMNs would be suitable to employ as a network infrastructure for the construction sites. This paper evaluates the performance of WMNs which we have installed in a tunnel construction. Through the performance results, we conclude the performance of data throughputs gets lower when we perform the network in tunnel environments. We make attempts WMNs' two major methods which are SISC(Single Interface with Single Channel) and MIMC(Multi Interface with Multi Channel) to figure out which method will be better for the construction sites. Through the experiments, the WMN based on the MIMC method was comparatively suitable in network performance aspect for the tunnel Sites.

전하 트랩 형 비휘발성 기억소자를 위한 재산화 산화질화막 게이트 유전악의 특성에 관한 연구 (Characteristics of the Reoxidized Oxynitride Gate Dielectric for Charge Trap Type NVSM)

  • 이상은;박승진;김병철;서광열
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 1999년도 추계학술대회 논문집
    • /
    • pp.37-40
    • /
    • 1999
  • For the first time, charge trapping nonvolatile semiconductor memories with the deoxidized oxynitride gate dielectric is proposed and demonstrated. Gate dielectric wit thickness of less than 1 nm have been grown by postnitridation of pregrown thermal silicon oxides in NO ambient and then reoxidation. The nitrogen distribution and chemical state due to NO anneal/reoxidation were investigated by M-SIMS, TOF-SIMS, AES depth profiles. When the NO anneal oxynitride film was reoxidized on the nitride film, the nitrogen at initial oxide interface not only moved toward initial oxide interface, but also diffused through the newly formed tunnel oxide by exchange for oxygen. The results of reoxidized oxynitride(ONO) film analysis exhibits that it is made up of SiO$_2$(blocking oxide)/N-rich SiON interface/Si-rich SiON(nitrogen diffused tunnel oxide)/Si substrate. In addition, the SiON and the S1$_2$NO Phase is distributed mainly near the tunnel oxide, and SiN phase is distributed mainly at tunnel oxide/Si substrate interface.

  • PDF

Spin injection and transport properties of Co/Au/Y$Ba_2$$Cu_3$$O_y$ tunnel junctions

  • Lee, Kiejin;Kim, Sunmi;Ishibashi, Takauki;Cha, Deokjoon
    • Progress in Superconductivity
    • /
    • 제3권1호
    • /
    • pp.70-73
    • /
    • 2001
  • We report the spin injection and transport properties of three terminal devices of Co/Au/$YBa_2$$Cu_3$$O_{y}$(F/N/S) tunnel junctions by injection of spin-polarized quaiparticles using a cobalt ferromagnetic injector. The observed current gain depends on the thickness of Au interlayer and is directly related to the nonequilibrium magnetization due to spin relaxation effects. The tunnel characteristic of a F/N/S tunnel junctions exhibited a zero bias conductance peak (ZBCP). The suppression of the ZBCP was observed due to the suppression of Andreev reflection at the interface, which is due to the spin scattering processes at the interface between a ferromagnetic and a d-wave superconductor.r.

  • PDF

스크린도어가 설치된 지하철에서 열차운행에 의한 비정상유동의 실험 및 수치적 해석 (Experimental and Numerical Analyses of Unsteady Tunnel Flow in Subway Equiped with Platform Screen Door System)

  • 김정엽;김광용
    • 설비공학논문집
    • /
    • 제18권2호
    • /
    • pp.103-111
    • /
    • 2006
  • To optimize the ventilation and smoke control systems in subway equipped with platform screen door, the technology to analyze the unsteady tunnel flow caused by running of train should be developed. The development of model experiment and numerical analysis technique with relation to unsteady flow of subway were presented. The pressure and air velocity changes in 1/20-scaling experiment unit were measured and results were comparied to those of 3-D unsteady numerical analysis applied with sharp interface method. The experimental and numerical results were quantitatively similar and it would be reasonable to apply sharp interface method to analyze the unsteady flow in subway equipped with platform screen door.

Study on the behaviour of pre-existing single piles to adjacent shield tunnelling by considering the changes in the tunnel face pressures and the locations of the pile tips

  • Jeon, Young-Jin;Jeon, Seung-Chan;Jeon, Sang-Joon;Lee, Cheol-Ju
    • Geomechanics and Engineering
    • /
    • 제21권2호
    • /
    • pp.187-200
    • /
    • 2020
  • In the current work, a series of three-dimensional finite element analyses have been conducted to investigate the behaviour of pre-existing single piles in response to adjacent tunnelling by considering the tunnel face pressures and the relative locations of the pile tips with respect to the tunnel. Via numerical modelling, the effect of the face pressures on the pile behaviour has been analysed. In addition, the analyses have concentrated on the ground settlements, the pile head settlements and the shear stress transfer mechanism at the pile-soil interface. The settlements of the pile directly above the tunnel crown (with a vertical distance between the pile tip and the tunnel crown of 0.25D, where D is the tunnel diameter) with a face pressure of 50% of the in situ horizontal soil stress at the tunnel springline decreased by approximately 38% compared to the corresponding pile settlements with the minimum face pressure, namely, 25% of the in situ horizontal soil stress at the tunnel springline. Furthermore, the smaller the face pressure is, the larger the tunnelling-induced ground movements, the axial pile forces and the interface shear stresses. The ground settlements and the pile settlements were heavily affected by the face pressures and the positions of the pile tip with respect to the tunnel. When the piles were inside the tunnel influence zone, tensile forces were induced on piles, while compressive pile forces were expected to develop for piles that are outside the influence zone and on the boundary. In addition, the computed results have been compared with relevant previous studies that were reported in the literature. The behaviour of the piles that is triggered by adjacent tunnelling has been extensively examined and analysed by considering the several key features in substantial detail.

다중 인터페이스 MIPv6 환경에서의 Fast Handover 방안 및 성능 분석 (Fast Handover Mechanism for Multi-Interface MIPv6 Environments and Performance Evaluation)

  • 박만규;황안규;이재용;김병철
    • 대한전자공학회논문지TC
    • /
    • 제44권12호
    • /
    • pp.34-43
    • /
    • 2007
  • 최근에 이동 단말들의 급격한 증가와 함께 이동 노드에 다양한 무선 접속 기술들의 사용이 가능해졌다. 또한 IPv6 기술이 네트워크에 도입되면 하나의 단말이나 인터페이스에 여러 개의 공중 IP주소를 가지는 멀티호밍 (multi-homing) 단말이 일반화될 것이다. 이에 맞추어 다중 인터페이스 멀티호밍 단말에 대한 이동성 관리기술 연구가 무선 인터넷 분야에서 활발히 진행 중이다. 본 논문에서는 다중 인터페이스를 지원하는 FMIPv6의 FBU 메시지를 대신하여, "tunnel destination" 이동성 옵션과 이 옵션을 표시하는 'T' flag를 이용하는 MFBU 메시지를 새로 정의하여, NAR이 아닌 특정 터널링 목적지로 핸드오버 동안 패킷을 터널링 시키는 다중 인터페이스 fast handover Mobile IPv6 절차의 확장을 제안한다. 이는 기존의 FMIPv6를 이용하여 핸드오버절차를 수행하는 동안 TCP 플로우의 패킷 도착순서가 바뀌어 세 개의 중복 ACK에 의한 불필요한 혼잡 제어로 성능이 저하되는 것을 완화하여 핸드오버 성능을 향상시키게 된다. 본 논문에서는 그 성능을 검증하기 위해 기존의 단일 인터페이스 MIPv6 NS-2 시뮬레이터를 확장하여 다중 인터페이스 FMIPv6 시뮬레이터를 구현하였으며, TCP 트래픽을 이용한 시뮬레이션을 통해 핸드오버 성능 향상을 확인하였다.

지반의 강성변화에 따른 지반-터널 동적 상호작용 연구 (Ground-Tunnel Interaction Effect Depending on the Ground Stiffness)

  • 김대상
    • 터널과지하공간
    • /
    • 제11권4호
    • /
    • pp.339-343
    • /
    • 2001
  • 쉴드 터널과 같이 토사 지반 혹은 연암 지역에 건설되는 원형 단면을 가진 터널은 지진 시에 지반의 전단변형의 영향을 받아 좌우교차로 경사진 타원형상의 변형을 반복한다. 본 논문에서는 이 진동모드를 이용하여 지반-터널계의 상호작용에 관하여 검토하였다. 터널주변지반은 균질한 탄성체로 가정되었고 지반-터널라이닝 경계가 완전히 부착되어 있는 경우에 대한 상호작용효과를 검토하였다. 지반의 포아송비 및 강성이 증가할수록 지반으로부터 터널라이닝에 전달되는 변형률이 증가함을 확인할 수 있었다.

  • PDF

$Fe/CeO_{2}Fe_{75}Co_{25}$ 터널접합의 잔기저항효과 (Magnetroresistance Effect of $Fe/CeO_{2}Fe_{75}Co_{25}$ Tunnel Junctions)

  • 이창호;김익준
    • 한국전기전자재료학회논문지
    • /
    • 제14권8호
    • /
    • pp.688-693
    • /
    • 2001
  • A series of Fe/CeO$_2$/Fe$_{75}$Co$_{25}$ tunnel junctions (Magnetic Tunnel Junction, MTJ) having CeO$_2$ barrier layers from 30 to 90$\AA$ in thickness were prepared by ion beam sputtering (IBS) method. In order to compare the properties of MTJs, Fe/Al oxide/Fe-Co tunnel junctions were also prepared. Some junctions with a CeO$_2$ barrier layer showed the ferromagnetic tunneling effect and the highest MR ratio at room temperature was 5%. The electric resistance of junctions with a CeO$_2$ barrier layer was higher that that of junctions with an Al oxide barrier. On the other hand, The interface analysis of the Fe/CeO$_2$ bilayer was conducted by means of X-ray photoelectron spectroscopy (XPS). It was found that CeO$_2$ was decomposed to Ce and $O_2$ during sputtering, and Fe was oxidized with these decomposed $O_2$ molecules. The reduction of both electric resistance and MR ratio may be associated with the decomposed Ce in the barrier layer.r.r.

  • PDF

원형터널에서 지반-라이닝 상호작용에 대한 수학적 해석해에 관한 연구 (An analytical solution for soil-lining interaction in a deep and circular tunnel)

  • 이성원;정재형;김창용;배규진;이주공;박경호
    • 한국터널지하공간학회 논문집
    • /
    • 제11권4호
    • /
    • pp.427-435
    • /
    • 2009
  • 본 연구는 원형 터널에서 지반-라이닝 상호작용에 대한수학적 모델에 관한 연구를 다룬다. 정적, 동적 하중으로 인하여 터널 라이닝에서 발생하는 축력과 모멘트를 구하는 간단한 수학적 해가 제시되었다. 수학적 해를 유도하기 위하여 지반-라이닝의 경계면에서의 힘-변위 관계식을 고려하였고, 경계면에서의 상호작용을 고려하고자 새로운 계수비들을 제시하였다. 축력과 모멘트에 대한 계수비의 영향이 조사되었다.

터널 화재시 터널 단면의 종횡비에 따른 연기 거동에 관한 (An Experimental Study of Smoke Movement in Tunnel Fires with Aspect Ratio of Tunnel Cross Section)

  • 이성룡;유홍선;김충익
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 추계학술대회
    • /
    • pp.115-120
    • /
    • 2003
  • In this study, smoke movement in tunnel fires was investigated with various aspect ratio(0.5, 0.667, 1.0, 1.5, 2.0) of tunnel cross section. Reduced-scale experiments were carried out under the Froude scaling using 8.27 kW ethanol pool fire. Temperatures were measured under the ceiling and vertical direction along the center of the tunnel. Smoke front velocity and temperature decrease rate were reduced as higher aspect ratio of the tunnel cross-section. Smoke movement was evaluated by analysis of vertical temperature distribution 3 m downstream from the fire source. Elevation of smoke interface according to N percent rule was under about 60% of tunnel height.

  • PDF