On The influence study to building by seoul sub-way construction 7-20 site Tunnel works. (서울지하철 7-20공구 터널 굴착으로 인한 지상 주택 구조물에 미치는 진동 소음 영향 조사연구)

  • Huh, Ginn
    • Explosives and Blasting
    • /
    • v.13 no.3
    • /
    • pp.7-18
    • /
    • 1995
  • On the Seoul sub-way tunnel works 7-20 site, Cautious blasting works were so effectivelly carried out. The vibration record were under 0.3cm/sec and blasting noise was under 80dB. Which was measured at the ground of house. At a result cautious blasting works under above allowable value was not influenced the structure of house and living conditions. On the architectural survey, They were some hair crack on the wall and floors but this was not a crack from blasting works.

  • PDF

A Blasting Experience in a Shallow Tunnel Section Overlain by Residential Structures (터널 상부 근접시설물 통과구간의 발파시공사례)

  • Won, Yeon-Ho;Kang, Choo-Won;Kim, Joung-In
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.99-107
    • /
    • 2008
  • This study, to reduce a ground vibration damage of the structures in an area adjacent to housing structures located closely above the tunnel section, is the ground vibration reduction instance of a tunnel blasting selectively applied the ground vibration-controlled blasting method (delay time applied blasting method, large center hole cut method, Line Drilling method, etc) with an originally planned blasting method connected, but with it's workability and economic efficiency is satisfactory, so, the results says the ground vibration-controlled blasting method on a similar condition is very effective, even if the applicability is depend on the blasting method and ground condition of the work area.

Utilization of Non-electric Detonator for the Safety of the Tunnel Blasting Site (터널발파 현장의 안전성 확보를 위한 비전기뇌관 활용방안)

  • Choi, Hyung-Bin
    • Explosives and Blasting
    • /
    • v.32 no.3
    • /
    • pp.26-36
    • /
    • 2014
  • A survey for understanding the opinion about the safety and economy of different types of detonators used in domestic tunnel construction was carried out for total 345 people in related areas. From the result, it was found that 86.7% of the surveyed people felt non-electric detonator was safe. From the experimental points that the cost of detonators is in charge of 8.1% in overall tunnel blasting cost, and the utilization of non-electric detonators will also contribute to the prevention of blasting accidents by the electrical safety, this study can help providing opinions and basic data collected from related areas to manufacturing companies, police department, and companies ordering tunnel construction.

The Construction of large and Long Tunnel Using Bulk Explosives (벌크폭약을 이용한 대단면 장대터널 시공 사례)

  • 노상림;문상호;조영천;이상필;유지영
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.65-70
    • /
    • 2004
  • Lately, the length of tunnel, the number of long-large tunnel over 3 lanes are steeply increased because of the request for high-speed and straight road. Therefore, the maximization of excavation efficiency is needed in tunnel construction. The sapaesan tunnel (4 lanes with the length of 4km) construction was delayed with environmental conflict far 2 years. For making-up delayed construction period, various new methods were adopted to improve excavation length, look-out and blasting efficiency. This study introduced bulk explosive which is new method in tunnel blasting and verified the efficiency of bulk explosive far long-large tunnel.

A Study on the Design of PLHBM (선대구경 수평보링 발파공법(PLHBM)의 설계 연구)

  • Beak, Jong-Hyun;Beak, Sang-Hyun;Han, Dong-Hun;Won, Ah-Ram;Kim, Chang-Seop
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.66-76
    • /
    • 2012
  • Blasting technology aims to maximize digging efficiency as well as minimize vibration and noise. So, it is key point of blasting technology to raise blasting effect as much as possible and reduce vibration and noise and the design of PLHBM that is the tunnel blasting method having such merit was studied in this paper. PLHBM has the excellent blasting efficiency as it drills the empty hole with high caliber of 250~1,000mm at centre cut, contributes to blasting vibration reduction effect much and can be usefully applied to tunnel blasting sites. So it is judged that it enables the development of tunnel blasting method to be advanced one more step by studying and suggesting the design method of PLHBM.

A case study on the effect of blasting conditions on ground vibration (발파조건이 지반진동에 미치는 영향에 관한 사례 연구)

  • 고영선;김종우
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.12-19
    • /
    • 1999
  • In this study, ground vibrations of a surface blasting for golf links and a tunnel blasting for highway construction were measured to investigate the effect of blasting conditions such as total charge and distance from blasting point. In surface blasting, site factor K and n were 74.1 and -1.37, respectively, which were analyzed by means of cube root scaled distance. The more were measuring distance, the higher were absolute value of K and n. Principal frequency was in range of 5~60 Hz in surface blasting, where that of 80 percent was in range of 10~30 Hz. On the other hand it was in range of 25~98 Hz in tunnel blasting, which showed higher than of surface blasting.

  • PDF