• 제목/요약/키워드: Trial construction

검색결과 268건 처리시간 0.028초

765kV 변전소 시운전에 관한 고찰 (Consideration on the trial operation of 765kV substation)

  • 변강;정시환;박근원;이상면;최만식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.29-31
    • /
    • 2002
  • Purpose of the 765kV trial operation conducted for the first time in our country are performance verification of domestic developed equipment(765kV M.Tr, GIS,etc) and extraction of problem in advance to commercial operation and cultivation of operation ability. The trial operation of 765kV substation was finished successfully under the positive supports of institutes. manufactures. and constructers. It is expected that extraction of problems in advance and accumulation of operation techniques through the trial operation of 765kV substation will be contributed largly to the realization of the without a hitch operation of 765kV system.

  • PDF

Analyzing consolidation data to predict smear zone characteristics induced by vertical drain installation for soft soil improvement

  • Parsa-Pajouh, Ali;Fatahi, Behzad;Vincent, Philippe;Khabbaz, Hadi
    • Geomechanics and Engineering
    • /
    • 제7권1호
    • /
    • pp.105-131
    • /
    • 2014
  • In this paper, the effects of variability of smear zone characteristics induced by installation of prefabricated vertical drains on the preloading design are investigated employing analytical and numerical approaches. Conventional radial consolidation theory has been adopted to conduct analytical parametric studies considering variations of smear zone permeability and extent. FLAC 2D finite difference software has been employed to conduct the numerical simulations. The finite difference analyses have been verified using three case studies including two embankments and a large-scale laboratory consolidometer with a central geosynthetic vertical drain. A comprehensive numerical parametric study is conducted to investigate the influence of smear zone permeability and extent on the model predictions. Furthermore, the construction of the trial embankment is recommended as a reliable solution to estimate accurate smear zone properties and minimise the post construction settlement. A back-calculation procedure is employed to determine the minimum required waiting time after construction of the trial embankment to predict the smear zone characteristics precisely. Results of this study indicate that the accurate smear zone permeability and extent can be back-calculated when 30% degree of consolidation is obtained after construction of the trial embankment.

시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론 (Database establishment method for process scheduling by means of simulation)

  • 고용호;노재윤;키앙;신도형;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

필로티건축물의 화재확산방지를 위한 시범시공 (Trial Construction for the Prevention of Fire Spread in Piloti Building)

  • 이병흔;권영진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2019
  • In case of Korea, The Large-scale fire is consistently being such as 2015 Uijeongbu Fire, 2017 Jecheon Fire, 2018 Sejong Hospital Fire. Such a fire has a problem that the fire is spreading upper due to external flame spread. As a countermeasure the fire safety, the study about axial temperature prediction of external flame spread is consistently doing. But in korea, Vertical spandrel is specified as 40cm, and improvement is urgently needed. In this study, a repair material was selected to prevent the fire from spreading to a building where a flammable exterior material was installed and then pilot construction was carried out. Also, fire safety measures for buildings constructed with flammable exterior materials were examined.

  • PDF

A Low-Cost Approach for Path Programming of Terrestrial Drones on a Construction Site

  • Kim, Jeffrey;Craig, James
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.319-327
    • /
    • 2022
  • Robots for construction sites, although not deeply widespread, are finding applications in the duties of project monitoring, material movement, documentation, security, and simple repetitive construction-related tasks. A significant shortcoming in the use of robots is the complexity involved in programming and re-programming an automation routine. Robotic programming is not an expected skill set of the traditional construction industry professional. Therefore, this research seeks to deliver a low-cost approach toward re-programming that does not involve a programmer's skill set. The researchers in this study examined an approach toward programming a terrestrial-based drone so that it follows a taped path. By doing so, if an alternative path is required, programmers would not be needed to re-program any part of the automated routine. Changing the path of the drone simply requires removing the tape and placing a different path - ideally simplifying the process and quickly allowing practitioners to implement a new automated routine. Python programming scripts were used with a DJI Robomaster EP Core drone, and a terrain navigation assessment was conducted. The study examined the pass/fail rates for a series of trial run over different terrains. The analysis of this data along with video recording for each trial run allowed the researchers to conclude that the accuracy of the tape follow technique was predictable on each of the terrain surfaces. The accuracy and predictability inform a non-coding construction practitioner of the optimal placement of the taped path. This paper further presents limitations and suggestions for some possible extended research options for this study.

  • PDF

사장교용 FRP-콘크리트 합성바닥판의 시험시공 (Trial Construction of FRP-Concrete Composite Deck for Cable-Stayed Bridge)

  • 김성태;박성용;조근희;조정래;김병석
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2010년도 춘계 학술대회 제22권1호
    • /
    • pp.43-44
    • /
    • 2010
  • 본 연구는 사장교에 적용이 용이하도록 프리캐스트화한 FRP-콘크리트 합성 바닥판 개발에 대한 것이다. 개발된 바닥판에 대해서 구조상세 별로 성능실험을 완료한 후, 실제 중차량이 통과하는 공사용가교 상에 시험시공을 수행하였으며 구조적 성능 및 현장 적용성을 살펴보았다.

  • PDF

냉간압연용 장수명 중간롤 개발 (Development of intermediate roll which has a long life for cold rolling mills)

  • 박영철;김병훈;김일봉;김정태;김현문;이우동
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2004년도 제5회 압연심포지엄 신 시장 개척을 위한 압연기술
    • /
    • pp.207-215
    • /
    • 2004
  • There are various characteristics called for in work roll and intermediate rolls for cold rolling mills. Among these characteristics, the two main requirements are to ensure the quality of the rolled products and to reduce roll cost. To achieve these needs, resistance to wear, to thermal shock and to contact fatigue are especially important. This paper describes that new material(named DSR1) for intermediate rolls which greatly increases rolling campaign and improves resistance to wear has been developed. DSR1 was successfully manufactured and has been used in the cold rolling mill. It showed that Trial product was homogenous in hardness distribution and sufficient usable diameter. Also in service test, trial product is much more excellent rolling performance than conventional $5\%Cr$.

  • PDF

내부마찰각과 토압 산정방법에 따른 철도교대의 안정성 비교 연구 (Stability of Railway Bridge Abutment with Earth Pressure and Internal Friction Angle of Backfill)

  • 최찬용;김현기;양상범;김병일
    • 한국철도학회논문집
    • /
    • 제19권6호
    • /
    • pp.765-776
    • /
    • 2016
  • 본 연구에서는 철도 교대를 위한 표준단면을 선정하고, 선정된 단면에 대하여 토압산정방법과 내부마찰각에 따른 직배면과 가상배면에 작용하는 주동토압을 비교 분석하였다. 또한, 기존토압과 개량시행쐐기법의 토압을 이용하여 내부마찰각에 따른 교대의 외적 안정성, 부재력 및 경제성을 분석하였다. 본 연구로부터 가상배면에서의 주동토압은 직배면에서의 주동토압보다 크며, 내부마찰각이 증가함에 따라 감소한다는 것을 알 수 있었다. 기존토압(Rankine, Coulomb, 시행쐐기법) 및 개량토압(개량시행쐐기법) 모두 내부마찰각이 증가함에 따라 부재력은 크게 감소하였고, 경제성은 향상되는 것으로 평가되었다.

공동주택 토목공사의 책임기술자와 품질의 상관관계 분석 (Correlation analysis of the quality and civil construction engineer in apartment house)

  • 정상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF