• Title/Summary/Keyword: Transportation and Installation

Search Result 333, Processing Time 0.021 seconds

A review of the characteristics related to the platform design, transportation and installation of floating offshore wind turbine systems with a tension-leg platform (인장각형 부유식 해상풍력발전시스템의 하부 플랫폼 설계 및 운송·설치 관련 특성 고찰)

  • Hyeonjeong Ahn;Yoon-Jin Ha;Ji-Yong Park;Kyong-Hwan Kim
    • Journal of Wind Energy
    • /
    • v.14 no.4
    • /
    • pp.29-42
    • /
    • 2023
  • In this study, research and empirical cases of floating offshore wind turbine systems with a tension-leg platform are investigated, and hydrodynamic and structural characteristics according to platform shapes and characteristics during transportation and installation are confirmed. Most platforms are composed of pontoons or corner columns, and these are mainly located below the waterline to minimize the impact of breaking waves and supplement the lack of buoyancy of the center column. These pontoons and corner columns are designed with a simple shape to reduce manufacturing and assembly costs, and some platforms additionally have reinforcements such as braces to improve structural strength. Most of the systems are assembled in the yard and then moved by tugboat and installed, and some platforms have been developed with a dedicated barge for simultaneous assembly, transportation and installation. In this study, we intend to secure the basic data necessary for the design, transportation, and installation procedures of floating offshore wind turbine systems with a tension-leg platform.

Evaluation of Installation Damage Factor for Geogrid using Maximum Particle Size of Backfill Material (뒤채움 최대입도를 이용한 지오그리드 보강재의 시공손상계수 산정 방법)

  • Kim, Kyung-Suk;Choi, Young-Chul;Kim, Tae-Soo;Lim, Seoung-Yoon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.6 no.4
    • /
    • pp.29-37
    • /
    • 2007
  • Reduction Factor for Installation Damage required for calculation of design strength of geogrid used in MSEW(mechanically stabilized earth wall) design is usually obtained in the field test simulating real construction condition. However, damages occurred in geogrid during backfill work are influenced by many factors such as polymer types, unit weight per area, backfill construction method and gradation of backfill material and field test considering these factors demands lots of time and costs. In this study, factors affecting installation damage are analyzed and empirical method for evaluating reduction factor for installation damage using maximum particle size in backfill material is suggested.

  • PDF

Tiny Magnetic Robot Mechanism and Manipulation for Stent Transportation and Installation

  • Yu, Chang-Ho;Kim, Sung Hoon
    • Journal of Magnetics
    • /
    • v.22 no.1
    • /
    • pp.162-167
    • /
    • 2017
  • Magnetic spiral-type microrobots, which are driven by a rotating magnetic field, have excellent locomotive abilities, whereas their medical applications are limited in the terms of function, such as the ability to drill in blood vessels. In this study, we propose a new robot with superior applications using a magnetic spiral-type machine. The proposed robot can be applied to stent transportation and installation without a catheter. In particular, the robot can be applied to the cardiovascular system, cerebrovascular disease, and nonvascular stent applications depending on the robot size. The robot consists of two independent spiral-type machines and four magnets in total. We controlled directions of thrust force of the two machines, respectively, for active locomotion with a task. We conducted a preliminary validation of the proposed robot for stent transportation and installation through experimental analyses.

Wind load estimation of a 10 MW floating offshore wind turbine during transportation and installation by wind tunnel tests (풍동시험을 활용한 10 MW급 부유식 해상풍력터빈 운송 및 설치 시 풍하중 예측)

  • In-Hwan Sim
    • Journal of Wind Energy
    • /
    • v.15 no.1
    • /
    • pp.11-20
    • /
    • 2024
  • As the generation capacity of floating offshore wind turbines increases, the wind load applied to each turbine increases. Due to such a high wind load, the capacity of transport equipment (such as tugboats or cranes) required in the transportation and installation phases must be much larger than that of previous small-capacity wind power generation systems. However, for such an important wind load prediction method, the simple formula proposed by the classification society is generally used, and prediction through wind tunnel tests or Computational Fluid Dynamics (CFD) is rarely used, especially for a concept or initial design stages. In this study, the wind load of a 10 MW class floating offshore wind turbine was predicted by a simplified formula and compared with results of wind tunnel tests. In addition, the wind load coefficients at each stage of fabrication, transportation, and installation are presented so that it can be used during a concept or initial design stages for similar floating offshore wind turbines.

Study on Applicability of the Vehicle Detection Using a Coil Sensor (코일센서를 이용한 차량검지기 적용성에 대한 연구)

  • Lee, Sang-O;Lee, Choul-Ki;Yun, Ilsoo;Kim, Nam-Sun;Lee, Yong-Ju
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.14 no.2
    • /
    • pp.14-23
    • /
    • 2015
  • This study was intended to evaluate the feasibility of the vehicle detector using a coil sensor. For the evaluation, the research team built a test environment for the detector consisting of a oscillation circuit, data collecting circuit, data monitoring and saving circuit, etc. As the result of the frequency analysis of the detector from the test environment, it was verified for the detector using a coil sensor to generate stable frequencies. In addition, the ease of construction and management was tested by comparing the size of cutting areas, consumption of installation materials, and installation time for a traditional loop detector and the detector using a coil sensor. As a result, the installation of the detector using a coil sensor requires less size of cutting areas, consumption of installation materials, and installation time.

The Field Applica1ion of The 154[kV] low Noise Transformers (154[kV] 저소음 변압기의 현장적용)

  • Kweon, Dong-Jin;Koo, Kyo-Sun;Woo, Jung-Wook
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.8
    • /
    • pp.124-129
    • /
    • 2009
  • Recently, there has been a growing global interest in environmental conservation, and the field of electric power equipment has been working to become more environment-friendly. Accordingly the 154[kV] low noise transformer is developed through the research. The low noise transformer decreases the audible noise level but the low noise transformer has several changes in the increase of weight and volume and the application of rubber damper. Therefore it is necessary to inspect the test, transportation, installation and operation about field application. In this paper, we investigate the standards of the audible noise level, the weight and volume of the transportation, the installation space and operation in order for effective field application.

Regional Differentiation Effect of Transportation System (교통체계의 지역분화작용)

  • 이주영
    • Journal of Korean Society of Transportation
    • /
    • v.3 no.1
    • /
    • pp.76-85
    • /
    • 1985
  • The significant role of transportation system for economic development process has been recognized, but the argument that transportation improvements stimulate economic development has brought sometimes no resonance in lacking of a plausible theory on the conditions and process of economic development by transportation investment. This paper reviews the theory on regional differentiation of transportation system and shows why and how the installation of a new transportation system or the improvements of the old transportation quality differentiate the spatial order of economic activities. It presents the interaction between the change of transportation quality with introducing of definition "transportation value" as tool of its determination and economic activities following the regional differentiation process, which result means regional defferentiation of niveau of economic development.

  • PDF

Development of Guidelines for Installing Speed Control Humps (차량과속방지턱의 설치기준 개발에 관한 연구)

  • 문무창;장명순
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.1
    • /
    • pp.137-149
    • /
    • 1994
  • The objective of study is to evaluate the effect of speed control hump on traffic operation and accidents. Three sites were investigated for the change of traffic accidents before and after the hump installation. Vehicle speeds approaching the hump were also analyzed. The study revealed that not only the number of traffic accidents but also the accident severity were significantly reduced by the installation of hump. Further, different types of traffic accidents with lower severity were observed after the hump installation. For the effect of speed reduction by hump, it was found that the speeds observed at 15m upstream of hump were in the range of 36~50 percent of approaching speeds which were not affected by (ie, without) the hump. Economic analysis of hump installation showed the benefit-cost ratio of 4.3 and 11.2 at two sites. Further analysis revealed that the benefit by the accident reduction exceeds the cost by speed reduction and installation capital if AADT is below 43,150 vehicles on two lane highways. It is recommended from the study that humps should be considered on two lane highways of high accident locations for excessive speeds to reduce traffic accidents and severity.

  • PDF

Risk Analysis for Installation Types of Pressure Safety Valve used in the High-pressure Gas Facility (고압가스 사용시설 내 안전밸브 설치유형별 리스크 분석)

  • Kim, Myung-Chul;Woo, Jeong-Jae;Lee, Hyung-Sub;Baek, Jong-Bae
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.129-136
    • /
    • 2017
  • This study investigated the probability of possible accident through qualitative and quantitative analysis of the pressure safety valve types installed in facilities using high pressure gas to compare the installation domestic and foreign pressure safety valve standards sought the safety characteristics and safety improvement direction accordingly. The three types are the case where the shut-off valve is not installed at the front of the PSV (Case A), If a shut-off valve is installed at the front of the PSV for inspection (Case B) and If a shut-off valve is installed in front of PSV (C.S.O), PSV is installed in parallel (Case C). Three types of cases were compared with FTA and HAZOP. The results of study of the possible accidents due to over-pressure safety valve installation type, used in a high-pressure gas facilities was shows in the following order Case B > Case A > Case C. The results of analysis through FTA was in order to protect the reservoir for the possible occurring of accident the safety valve installation is depend on its type. In the FTA analysis, defects in the device itself which attached to the storage tank as a substitute for analysis of the probability of operator mistakes was Case B with as high as $2.01{\times}10^{-6}$. Depending on the type of installation analysis of Case B in order to ensure safety is prohibited to install shut-off valve and believes that mandatory regulations are needed. Rationally installing of pressure safety valve in the high pressure using facilities will be expected to improve the industrial safety from severe accidents such as high-pressure gas fire explosion.

Productivity Analysis of the Site Installation Stage of Laminated Modular Multi-Family Housing (적층식 모듈러 공동주택 현장설치 단계의 생산성 분석)

  • Park, Moon-Sun;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.5
    • /
    • pp.519-527
    • /
    • 2019
  • This study was conducted to present useful information on the utilization and productivity analysis of laminated modular multi-family housing. To this end, the process of site installation was investigated and analyzed through a prior study, and the monitoring survey was conducted through the site installation case of an stacked multi-family housing. Based on the above, the results of productivity analysis using the web-cyclone technique were also presented. However, the site installation process has limitations on generalisation because the process is not the same for each construction company, and also limits that require verification through application in the actual site of the web-cyclone model presented in this study.