• Title/Summary/Keyword: Transmission problem

Search Result 1,925, Processing Time 0.024 seconds

An Approach for Optimal Dispatch Scheduling Incorporating Transmission Security Constraints (송전계통 안전도 제약조건을 반영한 급전계획 알고리즘 개발에 관한 연구)

  • Chung, Koo-Hyung;Kim, Bal-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.12
    • /
    • pp.597-602
    • /
    • 2005
  • The introduction of competition in electricity market emphasizes the importance of sufficient transmission capacities to guarantee various electricity transactions. Therefore, when dispatch scheduling, transmission security constraints should be considered for the economic and stable electric power system operation. In this paper, we propose an optimal dispatch scheduling algorithm incorporating transmission security constraints. For solving these constraints, the dispatch scheduling problem is decomposed into a master problem to calculate a general optimal power flow (OPF) without transmission security constraints and several subproblems to inspect the feasibility of OPF solution under various transmission line contingencies. If a dispatch schedule given by the master problem violates transmission security constraints, then an additional constraint is imposed to the master problem. Through these iteration processes between the master problem and subproblems, an optimal dispatch schedule reflecting the post-contingency rescheduling is derived. Moreover, since interruptible loads can positively participate as generators in the competitive electricity market, we consider these interruptible loads active control variables. Numerical example demonstrates efficiency of the proposed algorithm.

A Study on the Apparatus for Image Transmission and Transmission Control using Cellular Phone Network (셀룰러폰 통신망을 이용한 영상전송 및 전송제어 장치에 관한 연구)

  • 박성욱;황수철;박종욱
    • Journal of Internet Computing and Services
    • /
    • v.3 no.1
    • /
    • pp.1-10
    • /
    • 2002
  • A remote image transmission apparatus combines robot technology and image transmission there is safe problem or place that a person can not go. Recently, control apparatus that use wire and RF between web server and robot for remote control are developed. But, there is problem that must install Internet line and communication distance. Transmission distance problem can solve when using the equipment of RF, but price of RF router is problem that is very high cost. In this paper, we developed remote control system using the cellular phone communication network that can control image transmission and image transmission apparatus to solve these problem. Developed system could solve defects of methods that use existent RF and internet. And could transmit the most suitable image and voice under limited condition include current communication network.

  • PDF

Design and Implementation of the Remote Image Transmission System using CDMA Communication Network (CDMA 통신망을 이용한 원격 영상 전송 시스템의 설계 및 구현)

  • 박성욱;황수철;박종욱
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.7 no.3
    • /
    • pp.54-61
    • /
    • 2002
  • A remote image transmission apparatus combines robot technology and image transmission there is safe problem or place that a person can not go. Recently, control apparatus that use wire and RF between web server and robot for remote control are developed. But there is problem that must install internet line and communication distance. Transmission distance problem call solve when using the equipment of RF, but price of RF router is problem that is very high cost. In this paper, we developed remote control system using the CDMA cellular phone communication network that can control image transmission and image transmission apparatus to solve these problem. Developed system could solve defects of methods that use existent RF and internet. And could transmit the most suitable image and voice under limited condition include current communication network.

  • PDF

An Approach to Optimal Dispatch Scheduling Incorporating Transmission Security Constraints

  • Chung, Koo-Hyung;Kang, Dong-Joo;Kim, Balho H.;Kim, Tai-Hoon;Oh, Tae-Kyoo
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.2
    • /
    • pp.199-206
    • /
    • 2008
  • The introduction of competition in electricity markets emphasizes the importance of sufficient transmission capacities to guarantee effective power transactions. Therefore, for the economic and stable electric power system operation, transmission security constrains should be incorporated into the dispatch scheduling problem. With the intent to solve this problem, we decompose a dispatch scheduling problem into a master problem(MP) and several subproblems(SPs) using Benders decomposition. The MP solves a general optimal power flow(OPF) problem while the SPs inspect the feasibility of OPF solution under respective transmission line contingencies. If a dispatch scheduling solution given by the MP violates transmission security constraints, then additional constraints corresponding to the violations are imposed to the MP. Through this iterative process between the MP and SPs, we derive an optimal dispatch schedule incorporating the post-contingency corrective rescheduling. In addition, we consider interruptible loads as active control variables since the interruptible loads can participate as generators in competitive electricity markets. Numerical examples demonstrate the efficiency of the proposed algorithm.

A Local Representative Method for Maintaining a Stable Transmission Rate in Multicasting (멀티캐스트 환경에서의 안정적 전송률 유지를 위한 지역대표자 기법)

  • Jang Jong-Woo;Koo Myung-Mo;Kim Sang-Bok
    • Journal of Korea Multimedia Society
    • /
    • v.8 no.9
    • /
    • pp.1208-1215
    • /
    • 2005
  • In the case of receiving feedbacks from many receivers in the multimedia application using multicasting, the traffic congestion caused bp heavy traffic results in the problem of transmission rate decrease. In solving of this, the local representative method is adopted. However, the control of transmission rate in consideration of all receivers caused uncongested local transmission rate to get slower. In this paper, there is a local representative in solving of this problem. When the transmission rate of a group is less than minimum support threshold, the local representative recounts the transmission rate without congested receivers. Therefore, The local representative method has improved the problem that the transmission rate of uncongested local decreases. The result of this paper shows that this method provides stable transmission rate rather than those of existing methods.

  • PDF

Optimal Packet Scheduling in a Multiple Access Channel with Energy Harvesting Transmitters

  • Yang, Jing;Ulukus, Sennur
    • Journal of Communications and Networks
    • /
    • v.14 no.2
    • /
    • pp.140-150
    • /
    • 2012
  • In this paper, we investigate the optimal packet scheduling problem in a two-user multiple access communication system, where the transmitters are able to harvest energy from the nature. Under a deterministic system setting, we assume that the energy harvesting times and harvested energy amounts are known before the transmission starts. For the packet arrivals, we assume that packets have already arrived and are ready to be transmitted at the transmitter before the transmission starts. Our goal is to minimize the time by which all packets from both users are delivered to the destination through controlling the transmission powers and transmission rates of both users. We first develop a generalized iterative backward waterfilling algorithm to characterize the maximum departure region of the transmitters for any given deadline T. Then, based on the sequence of maximum departure regions at energy arrival instants, we decompose the transmission completion time minimization problem into convex optimization problems and solve the overall problem efficiently.

The Study for Analysis and Prevention Measure of Overhead Transmission Line Fault with Birds (조류에 의한 가공송전선로의 고장분석 및 예방대책 고찰)

  • Jung, Si-Hwan;Kang, Cheul-Won;Kim, Wan-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.96-98
    • /
    • 2006
  • Recently major power outages are increased, because of transmission line fault by birds. Therefore, after finding out the problem of the current prevention measure for the super high voltage transmission Line in Korea and analyzing the protection measure of other foreign power companies for the transmission facilities fault by birds, this paper describes an effective device for power line fault protection by birds which has no legal problem and also protects birds. The described prevention measure of power outage by birds in this paper, has a special feature that is able to be installed on the current overhead transmission facilities without a replacement or change.

  • PDF

A Multi-level Optimal Power Flow Algorithm for Constrained Power Economic Dispatch Control (제약조건을 고려한 경제급전 제어를 위한 다단계 최적조류계산 알고리즘)

  • Song, Gyeong-Bin
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.9
    • /
    • pp.424-430
    • /
    • 2001
  • A multi-level optimal power flow(OPF) algorithm has been evolved from a simple two stage optimal Power flow algorithm for constrained power economic dispatch control. In the proposed algorithm, we consider various constraints such as ower balance, generation capacity, transmission line capacity, transmission losses, security equality, and security inequality constraints. The proposed algorithm consists of four stages. At the first stage, we solve the aggregated problem that is the crude classical economic dispatch problem without considering transmission losses. An initial solution is obtained by the aggregation concept in which the solution satisfies the power balance equations and generation capacity constraints. Then, after load flow analysis, the transmission losses of an initial generation setting are matched by the slack bus generator that produces power with the cheapest cost. At the second stage we consider transmission losses. Formulation of the second stage becomes classical economic dispatch problem involving the transmission losses, which are distributed to all generators. Once a feasible solution is obtained from the second stage, transmission capacity and other violations are checked and corrected locally and quickly at the third stage. The fourth stage fine tunes the solution of the third stage to reach a real minimum. The proposed approach speeds up the two stage optimization method to an average gain of 2.99 for IEEE 30, 57, and 118 bus systems and EPRI Scenario systems A through D testings.

  • PDF

A Fast Optimization Algorithm for Optimal Real Power Flow (고속의 유효전력 최적조류계산 알고리즘)

  • Song, Kyung-Bin;Kim, Hong-Rae
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.926-928
    • /
    • 1998
  • A fast optimization algorithm has been evolved from a simple two stage optimal power flow(OPF) algorithm for constrained power economic dispatch. In the proposed algorithm, we consider various constraints such as power balance, generation capacity, transmission line capacity, transmission losses, security equality, and security inequality constraints. The proposed algorithm consists of four stages. At the first stage, we solve the aggregated problem that is the crude classical economic dispatch problem without considering transmission losses. An initial solution is obtained by the aggregation concept in which the solution satisfies the power balance equations and generation capacity constraints. Then, after load flow analysis, the transmission losses of an initial generation setting are matched by the slack bus generator that produces power with the cheapest cost. At the second stage we consider transmission losses. Formulation of the second stage becomes classical economic dispatch problem involving the transmission losses, which are distributed to all generators. Once a feasible solution is obtained from the second stage, transmission capacity and other violations are checked and corrected locally and quickly at the third stage. The fourth stage fine tunes the solution of the third stage to reach a real minimum. The proposed approach speeds up the coupled LP based OPF method to an average gain of 53.13 for IEEE 30, 57, and 118 bus systems and EPRI Scenario systems A through D testings.

  • PDF

A Study on Transmission System Expansion Planning on the Side of Highest Satisfaction Level of Decision Maker

  • Tran TrungTinh;Kang Sung-Rok;Choi Jae-Seok;Billinton Roy;El-keib A. A.
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.1
    • /
    • pp.46-55
    • /
    • 2005
  • This paper proposes a new method for choice of the best transmission system expansion plan on the side of highest satisfaction level of decision maker using fuzzy integer programming. The proposed method considers the permissibility and ambiguity of the investment budget (economics) for constructing the new transmission lines and the delivery marginal rate (reliability criteria) of the system by modeling the transmission expansion problem as a fuzzy integer programming one. It solves the optimal strategy (reasonable as well as flexible) using a fuzzy set theory-based on branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Under no or only a very small database for the evaluation of reliability indices, the proposed technique provides the decision maker with a valuable and practical tool to solve the transmission expansion problem considering problem uncertainties. Test results on the 63-bus test system show that the proposed method is practical and efficiently applicable to transmission expansion planning.