변압기용 고효율 차음판의 진동 및 소음 비교 (Comparison of vibration and noise of higher utility factor Insulation Panel for Transformer)

  • 정재환;이정환;정한얼;임동수;김진;최병근
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 추계학술대회논문집
    • /
    • pp.112-116
    • /
    • 2007
  • Highly damped insulation panel for transformer construction is needed in residential area because the making noise from transformer substation in inner city is appeared a lost of problem by increasing to conserve living environment. Therefor in this paper, the vibration and noise characteristic effect of cork-type and sponge-type that is attached between insulation panel and enforce beam in transformer is analized using real size transformer experimentally.

  • PDF

직류 전철 계통의 정류기용 몰드변압기 안전성에 관한 연구 (The safety Properties of Rectifier Mold Transformer for DC Railway System)

  • 주현정;박현준;김경화
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.742-747
    • /
    • 2005
  • Electric railroad transformer of a supply of Operation power of DC electric cars is intense fluctuation of load and flows the only big short-circuit current as a accident of the power system. it is a peculiarity more severe than general power transformer. Consequently, researches the properties about the rectifier mold transformer of DC substation and applies with data of safety of the electric railroad transformer. This paper analyzed a failure mode, the accident occurrence scenario and the be latent dangerous unit against the rectifier mold transformer of DC railway system.

  • PDF

일체형 주상용 몰드변압기의 덕트에 따른 열해석 특성 연구 (The Thermal Analysis of Pole Mount Mold Transformer with One-body Molding by Duct Condition)

  • 조한구;이운용
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2003년도 하계학술대회 논문집 Vol.4 No.2
    • /
    • pp.1135-1138
    • /
    • 2003
  • The transformer is major equipment in power receiving and substation facilities. Necessary conditions required for the transformer are compactness, lightness, high reliability, economic advantages, and easy maintenance. The pole-mount transformer installed in distribution system is acting direct role in supply of electric power and it is electric power device should drive for long term. Most of modem transformer are oil-filled transformer and accident is happening considerable. The mold transformers have been widely used in underground substations in large building and have some advantages in comparison to oil-transformer, that is low fire risk, excellent environmental compatibility, compact size and high reliability. In addition, the application of mold transformer for outdoor is possible due to development of epoxy resin. The mold transformer generally has cooling duct between low voltage coil and high voltage coil. A mold transformer made by one body molding method has been developed for small size and low loss. One body molding transformer needs some cooling method because heat radiation between each winding is difficult. In this paper, The thermal analysis of pole mount mold transformer with one body molding by duct condition is investigated and the test result of temperature rise is compared with simulation data.

  • PDF

배전변전소에 대용량변압기로 교체 적용시 보호협조를 위한 초전도 전류제한기의 임피던스 분석 (Analysis on SFCL's Impedance for Protective Coordination in Large Transformer installed in Distribution Substation)

  • 김진석;김명후;류일경;문종필;임성훈;김재철;안재민
    • 전기학회논문지
    • /
    • 제58권8호
    • /
    • pp.1479-1484
    • /
    • 2009
  • The introduction of the large transformer due to the large power demand has increased the fault current in power distribution system. The increased fault current can exceed the cut-off ratings of the circuit breaker. As the methods to solve this problem, the superconducting fault current limiter(SFCL) has been notified. However, the limited fault current by SFCL affects the operational characteristics of the protective device such as overcurrent relay. Therefore, the selection of the proper impedance for the SFCL is required to keep overcurrent relay's protective coordination with the SFCL when a large transformer is introduced into the distribution system. In this paper, the SFCL's impedance for protective coordination was investigates in that a large transformer is introduced.

변압기 유중 가스 진단 오차 원인에 대한 연구 (A study on Cause of Errors of Dissolved Gases Analysis in Transformer)

  • 조성민;이양진;김용성;김재철;권동진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.141-143
    • /
    • 2006
  • Dissolved gas analysis (DGA) is widely used to detect incipient faults in oil-filled electrical equipment. KEPCO make a rule of DGA in 1985. They have been diagnosing power transformer using their DGA criteria. In this paper, we analysis the result of DGA data about transformer in the substation. We try to find out what is cause of an error in DGA diagnosis considering accuracy in extracting gases from mineral oil in transformer. The carbon-monoxide was primary reason of warning in DGA data. We specially consider that aging is a cause of generating of carbon-monoxide in power transformer.

  • PDF

가스분석을 이용한 전력용 변압기 이상진단 연구 (A Study of the Preventive Diagnostic Algorithm of Gas Analysis in Oil for Power Transformer)

  • 최인혁;권동진;정길조;유연표;선종호;신명철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 C
    • /
    • pp.1676-1678
    • /
    • 2001
  • In general, power demand is on an increasing trend as industries have made rapid strides. Power transformer is the most important equipment in substation for this reason. Transformer trobles go with blackout, expensive repair costs and huge economic losses. Therefore it is important to find the quick detection of incipient fault for the least losses. There have been gas, partial discharge, temperature, OLTC, fan and pump diagnosis for preventive techniques by present. Specially gas analysis has been adapted for a long time and proved as confident method. In this paper, we analysed the fault causes of used power transformer. The insulation faults was occupied 40% of inquired 152 faults from 1991 to 2000. This study presents the developed algorithm and expert system for finding abnormal status within transformer. We used the Element Expert tool developed Neuron DATA Inc.

  • PDF

변압기 절연지 표면 금속 이물질 방전에 의한 극초단파 신호특성 (Characteristics of Ultra High Frequency Partial Discharge Signals from Metallic Particle Defected Oil-paper Insulation in Transformer)

  • 윤진열;주형준;구선근;박기준
    • 한국전기전자재료학회논문지
    • /
    • 제22권10호
    • /
    • pp.879-883
    • /
    • 2009
  • This paper was provided to help in detecting defects in power transformer. For this purpose, a partial discharge cell was designed and manufactured as a discharge source to simulate particle defected paper-oil insulation in power transformer. Experimental set-up for measuring PD signals was described. Magnitude of electromagnetic wave signals and corresponding amount of apparent discharge were measured simultaneously against phase of applied voltage to the discharge cell. Frequency range and pattern of PRPD(Phase Resolved Partial Discharge) of partial discharge signals were examined and analyzed. The results will be contributed to build the defect database of power transformer and to decrease the substation faults.

변전소와 수배전반에 적용 가능한 다기능 원격 관리시스템 개발 (Development of the Remote Management System for Substation and Distribution Substation)

  • 정성학;강학성;전감표;정도운
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국해양정보통신학회 2009년도 춘계학술대회
    • /
    • pp.759-762
    • /
    • 2009
  • 에너지 소비 증가와 환경문제의 이슈화로 전력 산업의 고도화 및 에너지 고효율화에 대한 관심이 집중되고 있다. 이러한 요구에 따라 지능형 전력시스템과 같은 전력 IT 산업이 새로운 신 성장 동력산업으로 주목받고 있으며, IT 기반의 선진화된 고효율 전력 산업이 저탄소 녹색 성장으로 대표되는 국가 경쟁력 강화의 핵심 요소로 자리 잡고 있다. 지능형 전력시스템은 발전에서부터 송전 및 변전, 그리고 배전/수용가 시스템에 이르기까지 전력의 생산에서부터 소비에 이르는 과정에 자동제어, 센서, 통신망 등의 정보기술을 적용하여 효율적 전력관리를 수행한다. 본 연구에서는 유인 또는 무인변전소의 수배전반에 적용할 수 있는 실시간 전력감시(전류,전압,전력,역률,주파수), 환경감시(배수장수위, 국부적 위험지역의 온도등), 상태감시(진공차단기, 기중차단기의 이상 상태, 배수장 모터 작동상태 등) 등 통합관리 기능을 갖는 다기능 원격 관리시스템을 구현하였으며, 구현된 시스템의 평가를 통해 실제 현장적용 가능성을 평가하였다.

  • PDF

변압기 부분방전과 노이즈에 의한 초음파 신호 분석 (Analysis of the Ultrasonic Signals by the Partial Discharge and Noises from the Transformer)

  • 권동진;정길조;진상범;곽희로
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제51권8호
    • /
    • pp.354-360
    • /
    • 2002
  • The partial discharge detecting method using the ultrasonic technique has been investigated to monitor the insulation ageing of a transformer. However, the result of the studies on the ultrasonic technique for detecting of partial discharge in the operating transformer is not enough yet to utilize. This paper presents the analysis of the ultrasonic signals due to the partial discharge in a model transformer and the corona in air at a shielded high voltage room. In addition, the ultrasonic signals due to the vibration from the core, operation of the cooling pump, the fan and the OLTC at the 345㎸ power transformer, were analyzed and corona noise from overhead transmission line in 345㎸ substation were measured to remove the electrical and mechanical noises from the transformer. Furthermore, ultrasonic signal due to the partial discharge in the 154㎸ power transformer with in $C_2$$H_2$ gas warning condition was measured. The inside of the transformer was examined with care. which confirms the existence of the partial discharge source.

안정적 전력공급을 위한 154kV 변전소 배전선로간 연계운영에 관한 연구 (A Study on Loop operation of 154kV Substation Distribution line for Stable power supply)

  • 김광호;손명권;정종찬
    • 산업기술연구
    • /
    • 제29권B호
    • /
    • pp.221-228
    • /
    • 2009
  • For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.