• Title/Summary/Keyword: Train Station

Search Result 379, Processing Time 0.033 seconds

The Effect of High-speed Railway Station Facilities and Train Related Services on Customer Satisfaction: Based on KTX User Experience (고속철도 역사시설 및 열차서비스 경험이 고객만족에 미치는 영향)

  • Lee, Kang-duck;Hwang, Eun-Ju;Yeom, Sun-Ho;Kim, Min-Ho;Jo, Hye-Jung
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.351-362
    • /
    • 2016
  • The purpose of this study is to investigate service factors and relationships affecting customer satisfaction by measuring indexes of the entire set of high-speed railway station facilities and train services. In this study, we collected data from 202 KTX passengers and analyzed the data using the structural equation model (SEM) method. Through exploratory factor analysis (EFA), we found five major service factors, including parking related service (PRS), station convenient facilities related service (SCS), ticketing services (TIS), service within the train (SWT), and inner environments (INE). As result of a hypothesis test, it was found that PRS does not influence SWT, whereas SCS and TIS positively affect train related service. Also, SWT and INE significantly affect the overall service satisfaction of customers. Thus, our findings provide that station facilities and train service experience are important factors that can enhance customer satisfaction.

A Study about coordinate schemes of radio and TRS(Trunked Radio System) in subway (지하철 무선통신설비와 주파수 공용 전화방식의 연계방안에 관한 연구)

  • Ea Yong;Kim Meung-Su;Lee Beung-Song
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.210-215
    • /
    • 2003
  • At present, communication network for subway is making use of the train radio system for main network and normally established a base station every three subway station. It is talk over the telephone between a locomotive and the traffic control for careful train service. Besides, mobile telephone equipment is using for service improve and convenience to passengers such as 011, 016, 017, 019 and what not. However, the train radio system has been occurring a various problems when a state of emergency because it is able to compose only one communication route each base station zone. We could have improving like this problems through induce the TRS(Trunked Radio System), though because have been able to compose multilateral communication route in case of linking with LCX(Leaked Coaxial) cable which is established. Therefore, we could be able to a fitting meet the emergency as train firing etc.. and efficient use of limited frequency resources.

  • PDF

Train Service Analysis of Intercity Rail Station (지역간 철도역의 열차운행체계 연구)

  • Lee, Jin-Seon;Kim, Gyeong-Tae;Park, Beom-Hwan
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.111-122
    • /
    • 2007
  • This paper investigates the rail service patterns by train class. The emphasis in intercity rail planning is to more efficiently use of existing station facilities. Rail transit operations are affected by the system layout and ridership patterns and by work rules. Operations are also influenced by past practices and the institutional setting. Main factors to decide train service patterns are the location, socioeconomic characteristics, land use and travel demand of the station. In this context, the travel demand of intercity rail station is of crucial significance. Tests on a KTX case shows that train service frequency can be efficiently decreased in weekday to transport the same passenger demand. The work has shown many subjects that need further research including various factors influencing on train frequency. This study serves the railroad authorities in planning and determining business strategy in the increasingly competitive environment of regional rail transport.

An Experimental Study on the Aerodynamic Effects Generated by a Train Passing near by Platform - Conventional Railway Station Field Test (철도차량의 승강장 통과 시 발생하는 공기역학적 영향에 대한 실험적 연구-기존철도역 현장시험)

  • Kim Dong-Hyeon;Kwon Hyeok-Bin;Song Moon-Shuk;Kim Do-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.889-896
    • /
    • 2004
  • A series of filed tests have been performed to investigate the aerodynamic effects on platform of the railway station during the passage of train that can be unpleasant and even dangerous to the pedestrians. To assess the aerodynamic effects on the platform, two aerodynamic properties has been measured; one is the wind gust induced by the train and the other is the pressure pulses generated when the nose and the tail of train passes. To measure these aerodynamic properties during the train passage, an array of hot-wire type anemometers and several sets of pressure transducers have been used, respectively. This paper deals with the filed test on conventional railway at about l00km/h operational speed, in which total 34 measurements has been made at the Bugok station in Seoul-Busan line for Saemaul and Mugungwha train. The results showed dramatic differences in the aerodynamic features between the two trains that are supposed to originate from the contrasting nose shapes of the trains.

  • PDF

Based on the Demand, A Scheduling Method for the Seoul-Busan High Speed Rail (수요기반의 경부고속철도 열차운행계획 수립기법에 관한 연구)

  • Park, Jin-Yong;Chang, Justin S.
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.380-388
    • /
    • 2010
  • This paper explored an effective scheduling method for the Seoul-Busan High Speed Rail. It is important to decide train frequency influencing on scheduling method. Main factors to decide train frequency are location of station, social economic index, land use of station area and travel demand. In this paper, we focused on travel demand which is critical factor to decide train frequency. And we studied on standardized scheduling method. Simulation method is used to analyze the performance of explored method.

  • PDF

Characteristics of Braking Noise of KTX Train (KTX 열차 정차소음 특성 연구)

  • Lee C.W.;Kim J.C.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.85-86
    • /
    • 2006
  • It presented the approach method for the station braking noise present condition and a braking noise reduction plan escape of the KTX train. The research which it sees the technical ground it will be able to accomplish the station braking noise reduction of the KTX vehicle with base the questing matter where the escape one thing is big there is a possibility of doing.

  • PDF

Characteristics of Braking Noise of KTX High Speed Vehicle (KTX 열차 정차 제동 소음 특성)

  • Lee C.W.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.10a
    • /
    • pp.1-5
    • /
    • 2005
  • High-speed trains with maximum speed of 300km/h, named KTX, have started revenue services since April 2004. Is becoming big problem where currently the KTX train because excessive braking noise at a station platform. The KTX braking noise follows in operating mode of KTX train and important railroad station where the quality appears different, the quality against hereupon from the commerce vehicle from the research which it sees it executes and comparison to analyze.

  • PDF

A Study Concerning Analysis of Arousal State of locomotive Engineering During Operating Train (열차 운행 중인 기관사의 각성상태 분석에 관한 연구)

  • Yang, Heui-Kyung;Lee, Jeong-Whan;Lee, Young-Jae;Lee, Jae-Ho;Lim, Min-Gyu;Baek, Jong-Hyen;Song, Yong-Soo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.6
    • /
    • pp.891-898
    • /
    • 2012
  • The study for the passenger's comfortableness of vehicles and the arousal of car drivers has been done widely. On the other hand, there are few studies for the locomotive engineers. Human error means that the mistakes made by human, recently it receives attention in the field of safety engineering and human engineering. Comparing the operating condition of train with car, because of the simplification of the visual stimulus, the arousal level on the train goes down easily. The arousal level down makes judgement down, the accident risk from human error is getting bigger. In this study, we measured bio-signals(ECG, EDA, PPG, respiration and EEG) from 6 locomotive engineers to evaluate their arousal state while they operated the train. Also we recorded the 3 axes acceleration signal showing the vibration state of train. Also, the existence of tunnels were simultaneously measured. At the station section where the train speed goes down, the size of vector's sum decreases because of reduced vibration. Beta component in EEG tends to increase at the entering point of each station and tunnel. It is due to the arousal reaction and tension growth. The mean SCR(skin conductance response) was more increased in neutral section. As the button control movement (body movement) increases in the neutral section, it is appeared that SCR increase. RR interval tends to gradually increase during train operation for 1 hour 40 minutes. However, It tends to sharply decrease at the stop station because strong concentration needed to stop train on the exact point. The engineer's arousal reaction can be checked through analysing the bio-signal change during train operation. Therefore, if this analysing result is adopted to the sleepiness prevention caution system, it will be useful for the safety train operation.

Train Regulation by the Advanced Algorithm for Subway (개선된 알고리즘에 의한 지하철 운행간격 제어)

  • Park, Hong-Kyu;Shim, Won-Sup;Hong, Soon-Heum
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.330-333
    • /
    • 2002
  • Even if the train of subway starts in a certain interval from the origin according to the operation plan. as the number of passenger gets increased during operation. the boarding and getting-off time will increase, and the temporary breakdown happens to the system of train during operation, causing the delay from the operation plan. this leads to the vicious circle of train operation. making the interval of train operation irregular in downtown especially. To solve this problem, we propose the method of advanced algorithm by the actual data relating to the train operation including operation time required between stations, distance between stations. capability of train, and the dwelling time, location and distance between the preceding train and next one. The central train control system adjusts the dwelling time at each station in order to recover the delayed time, and increase the operation speed at the each station. As control algorithm is applied the dwelling time and to increase the speed, the train maintains certain interval after certain amount of time passes.

  • PDF

Experimental Investigation about Optimum Smoke Extraction System for Underground Station (축소 모형 실험을 통한 정거장내 적정 배연방식에 관한 연구)

  • Lee, Ho-Keun;Kim, Myoung-Woo;Lee, Phill-Young;Kim, Nam-Suk
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.4
    • /
    • pp.53-59
    • /
    • 2008
  • If fire is occurred in the subway, the train must be moved to the closest station and make passengers get off the train. As a matter of fact, the Fire of Dae-gu Subway was coped with this way. But, the fire smoke extraction system of real subway stations have not designed to deal with fire of trains yet. Therefore, we have to establish a plan of station railroad for preventing from unexpected damage when the fired train comes to the station. The purpose of this study is to establish the effective smoke extraction measure that is to prevent stations from damage by the scale-down experiment.