• Title/Summary/Keyword: Train Performance

Search Result 1,488, Processing Time 0.026 seconds

Transmission loss of Honeycomb Composite Panel of the Tilting Train (틸팅 열차용 허니콤 복합판재의 투과손실)

  • Kim, Seock-Hyun;Lim, Bong-Gi;Kim, Jae-Chul;Jang, Yun-Tae
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1088-1091
    • /
    • 2009
  • In a tilting train, aluminium honeycomb composite panel is used for the high speed and light weight. Side wall of the tilting train includes the composite panel of carbon fiber, aluminium honeycomb and epoxy fiber as a main structure. In this study, we measure the transmission loss (TL) of the honeycomb composite panel and analyse the sound insulation performance by using the orthotropic plate model. We investigate experimentally how the air gap, plywood and glass wool improve the sound insulation performance of the composite panel. The purpose of the study is to provide practical information for the improvement of TL of the honeycomb composite panel used for the tilting train.

  • PDF

The Development on Train Detection System and Performance Testing on Automatic Changeover System in Neutral Section (절연구간 자동통과 열차검지시스템 개발 및 성능시험)

  • Han, M.S.;Chang, S.H.;Shin, M.C.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.3
    • /
    • pp.431-436
    • /
    • 2013
  • A neutral section is installed around feeding substation(SS) and sectioning post(SP) that M phase and T phase are isolated in AC feeding system. Electric Train under "Notch-OFF" is operated by inertia within the neutral section. It causes disturbing the operation of electric trains for speed drop and driver's mistakes. A automatic changeover system with thyristor recently have taken under development. In the paper, it is introduced the configuration of train detection system and performance testing on automatic changeover system..

Experimental Study of a Scramjet Engine Intake in a Storage Heater Type Hypersonic Wind Tunnel (축열식 가열기형 풍동을 이용한 스크램제트 엔진 흡입구 실험연구)

  • Kang, Sang-Hun;Lee, Yang-Ji;Yang, Soo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.463-466
    • /
    • 2010
  • A scramjet engine intake model was tested with a storage air heater type hypersonic wind tunnel. In test results, there is no large performance change with the variation of the sidewall configurations. In the isolator performance analysis, pressure distribution of oblique shock train and normal shock train was observed. Unstart limit of the model was also confirmed.

  • PDF

Driving Performance Experimental Analysis of Series Chopper Based EV Power Train

  • Kawamura, Atsuo;Guidi, Giuseppe;Watanabe, Yuki;Tsuruta, Yukinori;Motoi, Naoki;Kim, Tae-Woong
    • Journal of Power Electronics
    • /
    • v.12 no.6
    • /
    • pp.992-1002
    • /
    • 2012
  • In this paper, the series chopper based power train for electric vehicle is proposed for aiming the increase of one battery charge driving distance. Both the motor test bench based experiments and the chassis dynamo based experiments are tested and then analyzed for EV driving performance that the proposed power train with SAZZ chopper and Quasi-PAM control scheme is compared with or without the series chopper. It is confirmed through two kinds of experimental analyses that the series chopper power train for EV can be useful to extend the driving distance if the high efficiency and the low weight of chopper are satisfied.

Power System Simulation in Seoul matropolitain subway Line-6 system (서울 지하철 6호선에 대한 전력계통 시뮬레이션)

  • Lee, Tae-Shik;Moon, Young-Hyun;Sung, Soo-Young;Yoon, Kap-Koo
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.137-139
    • /
    • 1993
  • This paper details methods used to verify the adquacy of a dc traction power supply for design in Seoul matropolitain subway Line-6 system. Examples of the approach are given for a major subway presently under construction. The performance of trains operating at maximum system design capacity is modelled using a train simulation program. Using a dc network analyser program, the maximum train operating timetable, and a model of the ac and dc electrical suppy system, the electrical performance of the entire system can be modelled over a 24-hour period. The results of this analysis are used to determime: train voltage at a level sufficient to ensure train schedules: adequacy of traction transformers, rectifier, and switchgear ratings; sizes of the overhead contact systern conductors, and ac and de feeder cables: and power and energy demands at the utility company's supply points for inital and final timetable operations.

  • PDF

Test and Evaluation of the Pantograph for Korean High Speed Train (한국형 고속전철 집전장치의 성능 계측 및 평가)

  • 서승일;박춘수;조용현;최강윤;목진용
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.2
    • /
    • pp.94-99
    • /
    • 2003
  • The pantograph for Korean High Speed Train was developed by home-grown technology. In this study, test and evaluation of the current collection performance of the pantograph is conducted. For this purpose, a measuring system is developed and installed on the prototype high speed train. Measurement is conducted while the train runs on the test track. The measuring system is composed of video monitoring system and telemetry & data processing system. It monitors the hazard behavior of the pantograph and measures acceleration and vertical force of the pan head. By applying the measuring system, accurate evaluation of the performance of the pantograph and safety assessment of the interface system of pantograph and catenary is facilitated.

Development of Performance Estimate and Verification Process for Next Generation High-speed Prototype Train (차세대고속열차 차량시스 성능예측 및 성능검증 체계 개발)

  • Kim, Sang-Soo;Lee, Tae-Hyung;Choi, Sung-Hoon;Park, Choon-Soo;Han, In-Soo;Mok, Jin-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.555-560
    • /
    • 2008
  • Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And HSR-350x was developed and succeeded in testing of running over 350km/h. The new high-speed train development project, HEMU-400x project, has started since last year. To develop the train system, it is important how we progress the configuration of the system, design, manufacturing and test verification. The authors devised the performance estimate and verification process of the HEMU-400x and the project is performed following the developed processes.

  • PDF

Characteristics of Curved Track Behaviors according to Traveling Tilting Train (틸팅차량 주행에 따른 기존선 곡선 궤도의 거동 특성)

  • Park, Yong-Gul;Choi, Jung-Youl;Sung, Deok-Yong;Chun, Dae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.692-700
    • /
    • 2007
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the curve section, which is vulnerable to accelerated train speed. The analysis of tilting train test running the part of Chungbuk line and Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the movement behavior of each part of track while tilting train, high speed train and traditional train (Mugunghwa and freight train) were running the existing line, wheel load, lateral wheel load, rail bending stress, vertical and lateral displacement of rail and vertical displacement of sleeper were compared and analyzed so as to evaluate the expected impact by tilting train for improving the train speed.

Preprocessing-based speed profile calculation algorithm for radio-based train control (무선통신기반 열차간격제어를 위한 전처리 기반 속도프로파일 계산 알고리즘)

  • Oh, Sehchan;Kim, Kyunghee;Kim, Minsoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6274-6281
    • /
    • 2015
  • Radio-based train control system has driving headway shortening effect by real-time train interval control using two-way radio communication between onboard and wayside systems, and reduces facility investment because it does not require any track-circuit. Automatic train protection(ATP), the most significant part of the radio-based train control system, makes sure a safe distance between preceding and following trains, based on real-time train location tracing. In this paper, we propose the overall ATP train interval control algorithm to control the safe interval between trains, and preprocessing-based speed profile calculation algorithm to improve the processing speed of the ATP. The proposed speed profile calculation algorithm calculates the permanent speed limit for track and train in advance and uses as the most restrictive speed profile. If the temporary speed limit is generated for a particular track section, it reflects the temporary speed limit to pre-calculated speed profile and improves calculation performance by updating the speed profile for the corresponding track section. To evaluate the performance of the proposed speed profile calculation algorithm, we analyze the proposed algorithm with O-notation and we can find that it is possible to improve the time complexity than the existing one. To verify the proposed ATP train interval control algorithm, we build the train interval control simulator. The experimental results show the safe train interval control is carried out in a variety of operating conditions.

Development of Metro Train ATO Simulator by improving Train Model Fidelity (모델 충실도 향상을 통한 도시철도 열차자동운전제어 시뮬레이터 개발)

  • Kim, Jungtai
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.363-372
    • /
    • 2018
  • Simulator is used to verifying the function and performance of train control system before verifying with actual train. In this case, it is important that the simulation result should be coincide with the result with actual train. In this paper, the process of the development of automatic train operation (ATO) is described. ATO is in charge of automatic train control such as speed regulation and precision stop control. Identical interfaces from the ATO to the actual train was made in the simulator. Therefore ATO communicates to the simulator in the same way to the actual train. Futhermore, the train dynamic properties was measured by experiments and these were applied to the train model. Hence the response of the train in the simulator to the acceleration command is similar to that of the actual train. The simulation result of precision stop control is compared with the result in the actual train test to show the fidelity of the train model derived in the study and the superiority of this simulator.