• Title/Summary/Keyword: Train Operation Simulation

Search Result 194, Processing Time 0.026 seconds

A Study on TPS based on ATO for Driverless LRT (ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구)

  • Lee, Chang-Hyung;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1132-1137
    • /
    • 2008
  • Automatic Operation based on ATO (Automatic Train Operation) is necessary for driverless Light Rail Transit business. When this kind of driverless LRT operation plan is made, TPS (Train Performance Simulation) is traditionally simulated at all-out mode and coasting mode based on manual operation. Commercial schedule speed equals to all-out speed minus $9{\sim}15%$ make-up margin. Coasting mode TPS simulation is also run at commercial schedule speed to calculate run time and energy consumption. But TPS based on manual operation should make an improvement on accuracy in case of driverless LRT operation Plan. In this paper, new fast mode TPS simulation using ATO pattern is proposed and show near actual ATO result. The actual ATO pattern can be accurately simulated with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. Normal mode TPS simulation for commercial schedule speed can be designed to have fast mode trip time plus 3 seconds/km margin recommended by korean standard LRT specification.

  • PDF

Measurement System Establishment and Result Comparison for Verification of Train Performance Simulation (열차주행시뮬레이션 검증을 위한 계측시스템 구축과 결과 비교)

  • Lee, Tae-Hyung;Park, Choon-Soo;Mok, Jin-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2003.11b
    • /
    • pp.95-98
    • /
    • 2003
  • Computer aided simulation is becoming an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate rolling stock's performance such as distance, speed, power etc when train's running. This paper presents result of train performance simulation using the program that developed in advance for Korea high speed train. To verify result of simulation, we have developed measurement system and compared simulation result with experiment data.

  • PDF

The train automatic speed control using a fuzzy control (퍼지제어기법에 의한 자동운전 전동차속도제어)

  • Byun, Yeun-Sub;Kim, Yong-Kyu;Shin, Duc-Ko
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2164-2166
    • /
    • 2003
  • An automatic operation of train is executed by an automatic train operation(ATO) system. The main function of ATO system is to control train speed. So it makes the train stop at the programmed position accurately and improve riding comfort. In this paper, A fuzzy control is designed for speed control. The simulation is executed for verifying the speed control performance of the fuzzy system and comparing with that of the conventional PI.

  • PDF

A Study on Prediction of Suspension Time of Unmanned Light Rail according to Safety Personal Deployment (안전요원 배치 여부에 따른 무인운전 경전철의 운행중단 시간예측 연구)

  • Sang Log Kwak
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.1
    • /
    • pp.87-92
    • /
    • 2023
  • The number of unmanned light rail train operators is continuously increasing in Korea. In a failure event during an operation due to the nature of the unmanned operation, recovery is performed based on the remote control. However, if remote recovery is not feasible, safety personnel arrive at the train to resume the train operation. There are regulations on safety personnel and the suspension time of the train operation. However, there is currently no rule for safety personnel deployment. Currently, railway operating organizations operate in three scenarios: safety personnel on board trains, stationed at stations, and deployed at major stations. Four major factors influence the downtime for each emergency response scenario. However, these four influencing factors vary too much to predict results with simple calculations. In this study, four influencing factors were considered as random variables with high uncertainty. In addition, the Monte Carlo method was applied to each scenario for the safety personnel deployment to predict train service downtime. This study found a 17% difference in train service suspension by safety personnel deployment scenario. The results of this study can be used in setting service goals, such as standards for future safety personnel placement and frequency of service interruptions.

The Robust Speed Control on Automatic Train Operation Considering Unknown Running Resistance (열차자동운전에 있어서 미지의 주행저항을 고려한 강인한 속도제어)

  • Byun, Yeun-Sub;Wang, Jong-Bae;Park, Hyun-June
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.50 no.3
    • /
    • pp.114-119
    • /
    • 2001
  • An automatic train operation(ATO) system executes the operation of constant speed travelling and fixed point parking by using microprocessors instead of driver's manual operation. This paper describes the mathematical model for the train considering unknown disturbances which consist of start resistance, travelling resistance, slope resistance, curve resistance, and so on. The speed controller of ATO system is designed by considering the disturbances. The simulation is executed to verify the speed control and fixed point parking performance and to compare its performance with that of a PID-type ATO control system under disturbances. Simulation results show that the control performance of gain scheduled control scheme for ATO system is better than that of the conventional PID controller.

  • PDF

Communication Consecutive Test of Train Oriented Control System for Wayside Equipment Control (선로변 시설물 차상제어를 위한 차상중심 열차제어시스템의 통신 연속성 시험)

  • Baek, Jong-Hyen
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.5
    • /
    • pp.703-712
    • /
    • 2014
  • To improve the efficiency and safety of railway systems, the train control system has been considerably evolved from the ground-equipment-based control system (e.g. track circuit, interlocking system, etc.) into the on-board-equipment-based control system. In addition, this train control system enables the rolling stock to intelligently control the trackside facilities by introducing the information and communication technologies (ICT). Accordingly, since the ICT-based train control system makes the railway system be simplified (i.e. the heavy ground-equipment can be removed), the efficient and cost-effective railway system can be realized. In this paper, we perform the feasibility test of the ICT-based train control system via a simulation. To this end, we have developed the prototypes of the on-board controller and wayside object control units which control the point and crossing gate and performed the integrated operation simulation in a testbed. In this paper, before the field test of the on-board-controller-based train control system, we perform the Consecutive operation test for prototypes of the on-board controller, wayside object control units and local control computer.

Simulation Analysis of the Train Overhaul Maintenance Capacity for Rolling Stock Depot (열차 차량기지의 중정비 검수 용량 시뮬레이션 분석)

  • Jeon, Byoung-Hack;Lee, Won-Young;Jang, Seong-Young;Yoo, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1481-1498
    • /
    • 2007
  • As railroad industry face the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high speed long distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for detailed operations of the sample maintenance center are developed. In this study, standard maintenance procedures, layout, equipments and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. Three simulation analysis using the developed simulation model are done. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Lastly, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared.

  • PDF

A study on the speed control method of automatic operation train (자동운전 전동차의 속도제어기법에 관한 연구)

  • Byun, Yeun-Sub;Jang, Dong-Uk;Kim, Gil-Dong;Han, Young-Jae;Lee, Jae-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.372-374
    • /
    • 2001
  • An automatic operation of train is executed by an automatic train operation(ATO) system. The main function of ATO system is to control train speed as well as train brake system. So that train can stop at its programed position on platform and run with passenger comfort. In this paper, the gain scheduled control is designed for speed control considering the disturbances. The simulation is executed to verify the speed control performance and to compare its performance with the conventional PI and general Fuzzy control.

  • PDF

Calculation and application of the location-based speed profile of ATO considering the speed limitation and the jerk limitation (가속도한계 및 저크한계를 고려한 열차자동운전장치의 위치기반 속도프로파일의 계산 및 적용)

  • Yoon, Young-Hwan;Um, Jung-Kyou;Han, Jae-Mun;Cho, Yong-Gee
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1685-1690
    • /
    • 2010
  • This paper describes the calculation and application of the speed profile for the train speed control when the train is operated by ATO(Automatic Train Operation). We propose a speed profile calculation method considering the speed limitation and the jerk limitation, in order to maintain the quality of the train automatic operation. In previous works, ATO calculates a desired speed profile along the time, and controls the train to follow the profile. In this case, it may be hard to follow the restrictive speed along the location or to stop the train with a low location error, because of the difference between the desired location at each time and the real location of the train due to the control error. In the proposed method in this paper, we calculate a desired speed profile along the time considering the speed and jerk limitation first, and derive a speed profile along the location using it. If the restrictive speed profile is changed or the train speed strayed from the speed profile, ATO system calculates new speed profile and applies it immediately. Because ATO system controls the train speed based on the train location, the accuracy of the train location control can be improved. A simulation system for the test of the automatic train operation using this method is designed.

  • PDF

A Study on TPS based on ATO for Driverless LRT (ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구)

  • Lee, Chang Hyung;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.609-615
    • /
    • 2012
  • TPS (Train Performance Simulation) based on ATO (Automatic Train Operation) is required for driverless LRT (Light Rail Transit) operation plan instead of typical TPS based on driver operation. In this paper, new TPS model using ATO pattern is proposed and compared with the automatic train operation result in a test line of Seoul Metro Line 6 and in a whole line of Busan-Gimhae LRT. The actual ATO pattern can be very accurately simulated by new TPS model with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. The commercial scheduled time for driverless automatic train operation can be proposed to have "Fast" mode TPS trip time plus 3 seconds/km margin recommended by Korean standard LRT specification in this paper.