• Title/Summary/Keyword: Train Operation Simulation

Search Result 194, Processing Time 0.024 seconds

A VR-Trainer for Forklift Operation Safety Skills

  • Ahn, Seungjun;Wyllie, Mitchell J.;Lee, Gun;Billinghurst, Mark
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.122-128
    • /
    • 2020
  • This research investigates how a Virtual Reality (VR)-based simulation could be used to train safe operation skills for forklift operators. Forklift operation is categorized as high-risk work by many occupational health and safety regulators and authorities due to high injury and fatality rates involved with forklifts. Therefore, many safety guidelines have been developed for forklift operators. Typically, forklift operation safety training is delivered based on instructional texts or videos, which have limitations in influencing people's safety behavior. Against this background, we propose a VR-based forklift simulator that can enable safe operation skills training through a feedback system. The training program consists of several modules to teach how to perform the basic tasks of forklift operation, such as driving, loading and unloading, following the safety guidelines. The system provides instantaneous instructions and feedback regarding safe operation. This training system is based on the model of "learning-by-doing". The user can repeat the training modules as many times as necessary before being able to perform the given task without violating any safety guidelines. The last training module tests the user's acquisition of all safety skills required. The user feedback from several demonstration sessions showed the potential usefulness of the proposed training system.

  • PDF

Nose Shape Optimization of the High-Speed Train for the Speed-up in Tunnel (터널 주행속도 향상을 위한 고속열차 전두부 형상 최적화)

  • Ku, Yo-Cheon;Yun, Su-Hwan;Rho, Joo-Hyun;Kim, Kyu-Hong;Lee, Dong-Ho;Kwon, Hyeok-Bin
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2207-2212
    • /
    • 2008
  • The next generation of Korean high-speed train under development will be designed for the maximum operating speed of 350km/h and maximum speed of 400km/h. This high-speed operation may cause the noise and vibration problems around tunnel exit due to the higher micro-pressure wave than present level. In this study, the nose shape optimization was conducted for the countermeasure against these problems. Axi-symmetric solver was used for numerical simulation, and response surface was used for efficiency of optimization process. Also the multi-step optimization was conducted to find out more accurate optimal shape. Through these analysis and optimization, it was found out that the optimal nose shapes for minimization of micro-pressure wave are definitely different along the nose length variation. And the mechanism of micro-pressure wave reduction was closely investigated by the analysis of generation process of compression wave in tunnel. The results are expected to be used as design guideline for performance improvement of the next generatin of Korean high-speed train.

  • PDF

Pantograph-catenary Dynamic Interaction for a Overhead Line Supported by Noise Barrier

  • Belloli, Marco;Collina, Andrea;Pizzigoni, Bruno
    • International Journal of Railway
    • /
    • v.5 no.2
    • /
    • pp.55-64
    • /
    • 2012
  • Subject of the paper is a particular configuration of overhead line, in which noise barrier structure is used as supports of the catenary instead of standard poles. This configuration is foreseen in case the noise barrier position is in conflict with the poles location. If the catenary is supported by the noise barrier, the motion that the latter undergo due to wave pressure associated to train transit is transmitted to the overhead line, so that potentially it influences the interaction between the catenary itself and the pantograph of the passing train. The paper focuses on the influence of such peculiar configuration on the quality of the current collection of high speed pantograph, for single and double current collection. The study has been carried out first with an experimental investigation on the pressure distribution on noise barrier, both in wind tunnel and with in-field tests. Subsequently a numerical analysis of the dynamics of the barrier subjected to the wave pressure due to train transit has been carried out, and the output of such analysis has been used as input data for the simulation of the pantograph-dynamic interaction at different speeds and with front or rear pantograph in operation. Consideration of structural modifications was then highlighted, in order to reduce the influence on the contact loss percentage.

Simulation study of a regenerative inverter for absorption of regenerative energy in a DC traction substation (도시철도직류변전소의 회생전력 흡수를 위한 회생인버터 시뮬레이션)

  • Bae C. H.;Han M. S.;Kim Y. G.;Kwon S. Y.;Park H. J.
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.705-711
    • /
    • 2005
  • In DC traction substation with 12-pulse diode rectifiers, the DC line voltage tends to rise above noload voltage because it can't absorb the regenerative power caused by electric brakes of train. To solve this problem, an IGBT regenerative inverter should be installed and recycles the surplus regenerative power by delivering it. to the supply grid. In this paper, the DC traction substation equipped with a IGBT regenerative inverter is studied using computer simulation. Matlab/simulink is used to simulate the operation of regenerative inverter which injects the regenerative power into the supply grid and stabilizes the DC line voltage. It is confirmed that the high quality regenerative power is delivered to the supply grid thorough computer simulation.

  • PDF

Simulation study of a grid-connected inverter for absorption of regenerative energy in a DC traction substation (도시철도 직류변전소의 회생전력흡수를 위한 계통연계형 인버터 시뮬레이션)

  • Bae, C.H.;Han, M.S.;Jung, H.S.;Kim, Y.K.;Park, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 2005.10c
    • /
    • pp.279-281
    • /
    • 2005
  • In DC traction substation with 12-pulse diode rectifiers, the DC line voltage tends to rise above noload voltage because it can't absorb the regenerative power caused by electric brakes of train. To solve this problem, an IGBT regenerative inverter should be installed and thus recycles the surplus regenerative power by delivering it to the supply grid. In this paper, the DC traction substation equipped with a IGBT regenerative inverter is studied using computer simulation. Matlab/simulink is used to simulate the operation of regenerative inverter which injects the regenerative power into the supply grid and stabilizes the DC line voltage. It is confirmed that the high quality regenerative power is delivered to the supply grid thorough computer simulation.

  • PDF

Flight Simulation Training Device Operating Standards for MPL Training Programs in South Korea

  • Lee, Jang Ryong;Kwon, Moonjin;Kwon, Hanjoon
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.3
    • /
    • pp.117-121
    • /
    • 2021
  • The Multi-crew Pilot License (MPL) is a new pilot qualification introduced by ICAO to train co-pilots for transport aircraft based on efficient and stable competency to respond to changes in the operating environment and technology. ICAO and the European Union Aviation Safety Agency (EASA) require a minimum flight of 240 hours for MPL qualification training, and allow the use of flight simulation training devices (FSTDs) for most of the training, specifying the performance requirements for FSTDs. As South Korea is also preparing for the operation of the MPL training program, it is essential to establish the operating standards for FSTDs required for MPL training. This study aims to identify the international standards for FSTDs related to MPL training, and to compare them with the current operating standards for FSTDs in South Korea for presenting a standard (draft) that can be used when introducing domestic MPL training programs in the future.

Distributed UORA Scheme for Autonomous Train Communication in Congested Environment (자율주행 열차의 혼잡 상황 통신을 위한 분산형 UORA 기법)

  • Ahn, Woojin;Kim, Ronny Yongho
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.6
    • /
    • pp.542-547
    • /
    • 2019
  • Autonomous train is investigated to increase the capacity of railroad, and the reliability of wireless communication plays a critical role in terms of decreasing the inter-train distance. In this paper, we propose a transmission scheme for autonomous train communication in highly congested environment. The proposed scheme, namely distributed uplink orthogonal frequency division multiple access (OFDMA) random access (UORA), applies the triggered uplink access (TUA) and the UORA, introduced in the sixth generation WLAN standard, IEEE 802.11ax, for communication devices on vehicle and platform in a distributed manner. The simulation results show that the proposed scheme efficiently improves the packet transmission success rate in highly congested channel conditions compared to the conventional enhanced distributed channel access (EDCA) transmission scheme.

Dynamic Characteristics Analysis on the Synchronous Motor for Propulsion System of KTX High Speed Train (KTX 고속전철 추진제어시스템의 동기전동기 구동 동작특성 분석)

  • Yoon, Cha-Jung;Park, Sang-Woon;Lee, Eun-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3007-3018
    • /
    • 2011
  • This paper describes how to apply to commutate of thyristor efficiently. Thyristor is used for the high power system, as the research to secure domestic technology of the Current Source Inverter(CSI) for the synchronous motor operation which is used for the propulsion system of KTX. It has been composed to be available for the stable switching operation of the thyristor by supplementing problem of load commutation method, according to small Counter ElectricMotive Force(EMF) at low speed area of synchronous motor, via auxiliary commutation circuit using forced commutation method. We also have verified through the simulation using the Matlab.

  • PDF

A study on the fault diagnosis in the power system using Neural Network (신경회로망을 이용한 전력계통의 고장진단에 관한 연구)

  • Park, June-Ho;Choi, June-Hyug;Lee, K.J.
    • Proceedings of the KIEE Conference
    • /
    • 1991.11a
    • /
    • pp.43-46
    • /
    • 1991
  • When a fault is occurred in Power System, relay system detect overcurrent or voltage drop and trip the circuit breaker. Then, an operator in the control room diagnoses the fault and start the recovery of the system after analyzing the alarm information of relays or circuit breakers. The alarm informations have different patterns for each fault of the electric equipments on lines in power systems. In this paper, Back propagation algorithm is applied to train for many kinds of the fault in the power system. The simulation results show the possibility of the neural network application for the fault diagnosis in the case of errorous operation as well as normal operation of relays or circuit breakers.

  • PDF

A prediction of maximum operation speed for the catenary using tunnel bracket (터널 브래킷을 사용한 가선시스템의 최고속도 예측 및 검토)

  • ;;;M'hamed Matri
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.628-635
    • /
    • 2000
  • The catenary system supported by the tunnel bracket which has been used uniquely in KNR was selected as the catenary inside narrow existing tunnel in the electrification of Kyeung-Bu Line for operation of Korea High Speed Train(KTX). It was demanded to judge the maximal operable speed of KTX in this catenary system to implement the planning. To do this, the tunnel bracket was firstly tested to obtain the characteristic data. The stiffness of this bracket are computed depending on the location which catenary installed on. Moreover, the catenary using tunnel bracket is modelled numerically respecting the bracket stiffness. Based on these, the dynamics between this catenary and KTX pantograph are simulated with the program developed by ourselves independently. The simulation result are evaluated according to the generally acceptable criteria. Consequently, the maximal operable speed of KTX in the catenary using KNR(Korean National Railroad) tunnel bracket is predicted and some items which are needed to be kept in the processing of implementation are drawn.

  • PDF