• Title/Summary/Keyword: Train Control Monitoring System

Search Result 88, Processing Time 0.032 seconds

Reliability software design techniques of the Train Control and Monitoring System(TCMS) for the Standard type K-EMU (한국형 표준전동차 종합제어장치(TCMS)의 신뢰성 소프트웨어 개발 기술)

  • 한성호;안태기;이수길;이관섭;최규형
    • Journal of the Korean Society for Railway
    • /
    • v.3 no.3
    • /
    • pp.147-153
    • /
    • 2000
  • The train control and monitoring system (TCMS) is an on board computer system in railway vehicles performing the control, supervisory and diagnostic functions of the complete train system. This system replaces a lot of hard-wired relays and minimizes the necessary vehicle wiring thus increasing the reliability of the train. It is also one of more important equipment on vehicle to implement much higher safety and reliability train system. We studied a software design technique of TCMS using a CASE tool that is a kind of safety critical software engineering tool (SCADE). This tool has mainly four functions such as the graphical editor, the document maker, tile automatically code generator, and the test simulator. The several functions of TCMS are implemented in this software easily programmed using a functional block diagram and a graphic programming language. We applied to automatically generated TCMS modules on the SCADE each functional block for the Standard type EMU in Korea. We performed the combination test using TCMS simulator and the running test in Seoul subway 7 Line. We proved that this technique is more useful for the software design of TCMS in urban transit

  • PDF

A Study on Development and Application of the Remote Driverless Vehicle Monitoring System by using Radio Communication (무선통신을 이용한 무인차량 원격감시설비 개발 및 적용에 관한 연구)

  • Choi, Jae-Ho;Lee, Jong-Sung;Lim, Chang-Hee
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3073-3078
    • /
    • 2011
  • Driverless Train Control System has been recently introduced and commercialized in Korea. It is expected that the vehicle with driverless operation system will be used in new lines such as Sinbundang line soon. Therefore it is necessary to change the system operation and conception of the existing train operation system and the necessity of driverless vehicle monitoring system meeting a new paradigm is rising. In order to dispel concerning about safety issues caused by driverless train operation, the importance to establish vehicle error detection, useful fault diagnosis and rapid action plans is higher than ever. For this, efficient and higher level of vehicle supervision & control system should be essentially supported. In this study, remote driverless vehicle monitoring system using by radio communication is suggested to be used for monitoring and controlling important parts of the vehicle and diagnose and take quick actions when vehicles are in trouble at control tower at real time.

  • PDF

Development of High Reliability Monitoring and Control System for Platform Screen Door (승강장 스크린 도어(PSD)에 대한 고 신뢰성의 감시 및 제어 시스템 개발)

  • Kim, Jin-Sik;Shon, Jin-Geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.2
    • /
    • pp.158-162
    • /
    • 2010
  • PSD is automatically opened and closed when subway train arrive on the station. This system was designed to control electric automatic system. These doors will provide passenger safety, energy saving and a good environment in subway. The monitoring and control systems of PSD are configured so that they can be operated in automatic mode in connection with ATO through the composite control panel in the station control room. The objective of this paper is to obtain high reliability that is essential for monitoring and control systems of PSD. The power supply is based on protection circuit using DC power bridge from two UPS. Also, stable communication system consists of CAN communication line redundancy and RF cross protection algorithm. Monitoring state display results show the validity of the proposed high reliability monitoring and control systems of PSD.

A Simulation for the Train Automatic Operation Control System (전동차의 자동운전제어 시스템에 관한 시뮬레이션 기술)

  • 한성호;윤용기;안태기;김원경;조연옥
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.255-261
    • /
    • 1998
  • The train automatic operation control system is an on-board train control system that is widely adopted in modern rapid transit systems. The control system consists of TCMS(Train Control and Monitoring System), ATC(Automatic Train Control), ATO(Automatic Train Operation) and TWC(Train to wayside communication) in the train and wayside facilities. The functions of the system is to regulate train riding comfort, to service limited speed and smoothness during start, acceleration, constant speed travel, and fixed point parking under the corresponding commands. The paper describes the simulation model of the train automatic operation control of subway system, configuration of simulator hardware and software and operational algorithms.

  • PDF

A Study on the Data-based WBS Model for Train Control System to Improve a Maintenance work (열차제어시스템 유지관리 업무 개선을 위한 데이터 기반 WBS 모델 연구)

  • Jeon, Jo Won;Kim, Young Min;Park, Bum
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.1
    • /
    • pp.99-104
    • /
    • 2022
  • In this paper, to increase the maintenance efficiency of the urban railway train control system and to build a standard data system, we collect as much as possible structured, unstructured, and semi-structured data, and collect data by sensing and monitoring the system status and system status and monitoring. pre-process function data(Identification, purification, integration, transformation) through effective data classification and maintenance activities business classification system was studied. The purpose of this is to define the data matrix model by considering the relationship with the data generated and managed in the O&M stage of the train control system operated by the urban railway together with the WBS model, and to reflect and utilize it in practice.

A Study on the Applying of Balancing Control and Safety Monitoring Technology of Cargo on the Freight Train (화물열차 적재화물의 균형제어 및 안전모니터링기술 적용 연구)

  • Han, Seong-Ho;Han, Young-Jae;Lee, Suk;Kim, Young-Hoon
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.66 no.4
    • /
    • pp.224-228
    • /
    • 2017
  • Recently, in order to improve the efficiency of freight transportation on existing lines, a new freight train model is needed to develop urgently. The weight balance of the cargo for the freight vehicle is very important for the stability of the running train and the safe transportation of the cargo. For achieving the cargo weight balance, we proposed a Cargo Balancing Control(CBC) system on the Freight vehicle equipped in between under frame of car body and bogie system. The Cargo Safety Monitoring(CSM) system was designed to supervise status of the Cargo on freight train. The monitoring system can display real time status data from sensors and various signals effectively. We suggested that this paper is a very useful approach for keeping the safety of running freight trains on existing lines.

A Study on New Train Control System of the SMRT(Seoul Metropolitan Rapid Transit Corporation) (서울도시철도 신 열차제어시스템에 대한 연구)

  • Yu, Guen-Gyu;Park, Jong-Hun;Ahn, Jin-Seong;Kim, Ki-Chun;Lee, Sang-Guen
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.895-903
    • /
    • 2011
  • The Seoul Metropolitan Rapid Transit Corporation(SMRT) is studying the New Train Control System based on Wireless Communication(CBTC System : Communication Based Train Control System) to overcome the limitations of the existing system and to deal with the switch to the new system. The SMRT's New Train Control System Based on three main elements(train position detecting, radio communication and train control) is being developed in 3 stages. Currently, the development of the train position detecting element with the RFID system and the train position detecting device and the radio communication element with RTIS and DSRC had been developed and equipped on 3 stations(Songpa~Garak Market~Munjeong, 7.3km) of Subway Line 8 in the pilot. Such a basic infrastructure of the SMRT's New Train Control System is having an efficiency test by using the real-time Train Monitoring System and Currently, the third element, the train control(ATP/ATO/ATS/Interlocking) for the study is in progress. Also, the developed system is expected to validate the performance and safety in the next three stage. This paper shows about major developments of the SMRT's New Train Control System and our future plans.

  • PDF

Development and Test of Automatic/Driverless Operation System for Standardized EMU (표준전동차 자동/무인운전장치 개발 및 주행시험)

  • 안태기;이수길;한성호;이관섭
    • Journal of the Korean Society for Railway
    • /
    • v.3 no.3
    • /
    • pp.154-160
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design and testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control and Monitoring System), ATO(Automatic Train Operation), ATC(Automatic Train Control), and TWC(Train to Wayside Communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

Development of a GVT (Gas Valve Train) Control System for LNG Fueled Vessels (LNG 추진 선박 엔진용 GVT 제어 시스템 개발)

  • Kang, Inpil;Kim, Kyu-Cheol
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.70-76
    • /
    • 2017
  • This paper presents the development of a Gas Valve Train (GVT) control system which is the core equipment of LNG fueled vessels. Due to the increasing worldwide demand for echo friendly green ship products, domestic companies urgently require to develop a core equipments for the LNG fueled vessels to secure worldwide markets in marine engineering. A LNG fueled engine generally equips the GVT, a fuel supply system that steadily supplies clean high-pressure LNG to the engine. The GVT requires a safety operational control system that can prevent any gas leakage accident, and a system that monitors operation status in real time. Therefore, we introduces a development for GVT control and monitoring system design and the design was systematically performed by means of functional analysis and differentiation of foreign advanced products.