• Title/Summary/Keyword: Traffic Demand

Search Result 873, Processing Time 0.024 seconds

Wireless Traffic Signal Light using Fuzzy Rules

  • Hong YouSik;Lu Wei-Ming;Yi JaeYoung;Yi CheonHee
    • Proceedings of the IEEK Conference
    • /
    • summer
    • /
    • pp.365-370
    • /
    • 2004
  • In this paper, we wish to construct a optimal traffic cycle using wire remote control. if police vehicle or ambulance suddenly enter the traffic intersection, it will increase the traffic accident. In this paper, wireless traffic light use the radio traffic control signal and research about the hardware manufacture to check special detectors on urgency vehicles may safety and rapidly enter traffic intersection. Also, this paper present a traffic signal control conditions that analyzes different traffic intersection flows in cases of saturated flows, where the real traffic volume demand is large and the capacity constraints of bottlenecks have significant effects on the flow patterns. Through computer simulation this wireless traffic light has been proven to be much more safety and efficient than fixed traffic signal light which does not considering emergency vehicles for safety escort.

  • PDF

Methods for a target-oriented travel demand management (목표지향 기종점 교통수요 관리모형연구)

  • Im, Yong-Taek
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.6
    • /
    • pp.167-176
    • /
    • 2009
  • Several travel demand management schemes have been used for controlling overloaded traffics on urban area. To maximize efficiency of the travel management, traffic manager has to set target level that we try to arrive in advance, and then to find optimal variable to attain this goal. In this regard, this paper presents two travel demand management models, expressed by mathematical program, and also presents their solution algorithms. The first is to find optimal travel demand for origin-destination (OD) pair, based on average travel time between the OD pair, and the second is based on the ratio of volume over capacity on congested area. An example is given to test the models.

Estimation Problem of Design Hour Factor (K) on Urban Expressways and its Improved Direction (도시부 고속도로 설계시간계수(K) 추정방법의 문제점 및 개선방향 제시)

  • Kim, Sang-Gu;Gang, Seon-Uk;Kim, Yeong-Chun;Go, Seung-Yeong
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.2
    • /
    • pp.111-121
    • /
    • 2010
  • DHV (Design-Hour Volume) for the estimation of number of lanes is determined by design-hour factor (K). The design-hour factor is defined as the proportion between the 30th highest hourly volume and AADT and determines the level of road planning. However, the K-factor estimated by an existing method has a problem because the hourly volumes on holiday and weekend appear in the relatively low rank in real world in spite of expected high volumes. To improve this problem, this study make use of the concept of traffic demand in estimating the design-hour factor. After the congested hourly volumes transfer to traffic hourly demand, the K-factors are estimated on urban expressways and are compared to the existing K-factors. It is perceived that the new K-factors have more realistic values due to utilizing the traffic demand. reflecting the congested flow.

A Study on the Traffic Flow Analysis Method by Image Processing (화상처리에 의한 교통류 해석방법에 관한 연구)

  • 이종달;이령욱
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.1
    • /
    • pp.97-116
    • /
    • 1994
  • Today advanced traffic management systems are required because of a high increase in traffic demand. Accordingly, the objective of this study is to take advantage of image processing systems and present image processing methods available for collection of the data on traffic characteristics, and then to investigate the possibility of traffic flow analysis by means of comparison and analysis of measured traffic flow. Data were collected at two places of Daegu city and Kyongbu expressway by using VTR. Rear view (down stream) and frontal view (up stream) methods were employed to compare and analyze traffic characteristics including traffic volume, speed, time-headway, time-occupancy, and vehicle-length, by analysis of measured traffic flow and image processing respectively. Judging from the results obtained by this study, image processing techniques are sufficient for the analysis of traffic volume, but a frame grabber equipped with high speed processor is necessary as well, with low level system judged to be sufficient for traffic volume analysis.

  • PDF

Traffic Analysis Model for Exit Ramp Congestion at Urban Freeway (고속도로 진출램프 대기행렬 발생 현상 분석모형 개발)

  • Jeon, Jae-Hyeon;Kim, Young-Chan
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.9 no.3
    • /
    • pp.30-40
    • /
    • 2010
  • The freeway congestion is largely generated by a mainline spillover of the exit ramp queue. So it is necessary to study for modeling of the phenomenon and applying the model. In this study, the authors evaluated applicability of the Supply-Demand model, which can express traffic flow for the freeway by applying flexibly supply and demand curves for capacity of the freeway. First the authors proposed methods processing input data required in the Supply-Demand model, such as sending & receiving functions and time-varying capacity constraints for the freeway mainline. After modeling the Supply-Demand application model, the authors applied the model to the site including congested Hongeun exit ramp in Seoul Ring-road, and improved the model by adjusting application techniques and calibrating parameters. The result of the analysis showed that the Supply-Demand model yielded a queuing pattern and queue location similar to them observed in the field data, and applicability of the Supply-Demand model was varified.

A Strong LP Formulation for the Ring Loading Problem with Integer Demand Splitting

  • Lee, Kyung-Sik;Park, Sung-Soo
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.306-310
    • /
    • 2004
  • In this paper, we consider the Ring Loading Problem with integer demand splitting (RLP). The problem is given with a ring network, in which a required traffic requirement between each selected node pair must be routed on it. Each traffic requirement can be routed in both directions on the ring network while splitting each traffic requirement in two directions only by integer is allowed. The problem is to find an optimal routing of each traffic requirement which minimizes the capacity requirement. Here, the capacity requirement is defined as the maximum of traffic loads imposed on each link on the network. We formulate the problem as an integer program. By characterizing every extreme point solution to the LP relaxation of the formulation, we show that the optimal objective value of the LP relaxation is equal to p or p+0.5, where p is a nonnegative integer. We also show that the difference between the optimal objective value of RLP and that of the LP relaxation is at most 1. Therefore, we can verify that the optimal objective value of RLP is p+1 if that of the LP relaxation is p+0.5. On the other hand, we present a strengthened LP with size polynomially bounded by the input size, which provides enough information to determine if the optimal objective value of RLP is p or p+1.

  • PDF

Development of the Reliability Traffic Assignment Model based on the Travel Time Variation (통행시간변화를 고려하는 신뢰도통행배정모형 개발)

  • 문병섭;이승재;임강원
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.5
    • /
    • pp.69-78
    • /
    • 1999
  • This paper defines the reliable based route choice Principle and formulates the reliability based equilibrium traffic assignment using the Principle. The reliability is defined as the difference of travel demand and capacity using the interference theory of the system engineering. An efficient solution a1gorithm based on Frank-Wo1fe algolithm is Presented to calculate and compare the reliability based traffic assignment with conventional travel time based assignment using small and large scaled road networks. The results show that reliability based traffic assignment converges to equilibrium solution in a reasonable computing time. The equilibrium link flows between reliability and travel time based traffic assignment differ each other in the sense that reliability based assignment is assigned based on the maximum difference of travel demand and link capacity whilst travel time based is assigned on the shortest travel time.

  • PDF

Comparative Analysis of Forecasted and Measured Traffic Demand for Gyung-bu High Speed Railway (경부고속철도 수송수요의 예측치와 실측치의 비교분석)

  • Oh In-Tack
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.889-896
    • /
    • 2005
  • While a year and a half has been passed since the launch of KTX service, traffic volume of Gyung-bu High Speed Railway is still much lower than the forecasted value. This situation has been badly affecting not only Korail's financial status but also KRNA's general railway construction projects as general public responds negatively to such projects as New Ho-nam Line Construction. This paper outlines traffic volume forecasting methodologies applied to construction of Gyung-bu High Speed Railway, identifies major causes of forecasting deviations. and finally extracts problems through comparison between the forecasted results and actual traffic volume.

  • PDF

The method for VOD service traffic modeling (VOD(Video On Demand)서비스 Traffic 모델링 방안)

  • Chang, Won-Pil
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.109-112
    • /
    • 2005
  • In this thesis, we recommend the method for VOD service traffic modeling. By the analysis of service traffic, we verify that the process of VOD service is the POISSON process. So it is important to determine the probability of the user's existence in the system. But, because it is difficult to measure, we recommend proper using of arrival rate and service rate.

  • PDF

Development of A Estimation Method of Traffic Demand Between ICs and An Algorithm for Providing Traffic Information (고속도로 IC간 교통수요 추정과 이를 통한 교통정보 제공 알고리즘 개발)

  • Lee, Jun;Cho, Han-Seon;Kwon, Young-In
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.83-91
    • /
    • 2011
  • The objective of VMS(Variable Message Sign) is to provide the traffic information downstream to drivers upstream so that they can choose their routes or expect the travel time to arrive the destination. Because there is not enough time and space to show the message, VMS message should be selected carefully. However, the message of VMS has been simply selected among the pre-designed message sets based on the priority rule of events. If the traffic demand between origin and destination is identified along the freeway, message can be selected to provide the information of a route that more drivers will use. In this study, a time sliced OD(Origin/Destination) estimation method will be developed using the detector information of the on-ramp, exit ramp, and the main lanes. And the strategy of a priority rule of message was planned.