• Title/Summary/Keyword: Track verification

Search Result 105, Processing Time 0.029 seconds

Requirements Validation Plan for korean Rubber-Tired AGT System (한국형 고무차륜 경량전철시스템에 대한 요구사항 검증계획)

  • Mok, Jae-Gyun;Lee, An-Ho;Han, Seok-Yun
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.27-31
    • /
    • 2003
  • This study is in a part of requirements validation plan for korean rubber-tired AGT system on test track. The AGT system is consisted subsystems as vehicle, signalling, communication, power distribution and infrastructure for rubber tire running on track. The subsystems will be installed and integrated on test track till next year for test and evaluation. This paper shows overview for test and evaluation in terms of system requirements and its validation classification, test track configuration, measuring system requirements and its configuration. The whole process of system integration and its validation will be controlled by means of KMS including documentation.

  • PDF

Characteristics of Track Behaviors according to Accelerated Tilting Train Speed (틸팅차량 증속에 따른 기존선 궤도의 거동 특성)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1653-1661
    • /
    • 2008
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the conventional line(ballast track), which is vulnerable to accelerated train speed. The evaluation of tilting train test running the part of Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the performance of each part of track components while tilting train and high speed train were running the existing line, wheel load, rail bending stress, vertical displacement of rail and sleeper were compared so as to evaluate the expected impact by tilting train for improving the train speed.

  • PDF

Modal Tests of Railway Bridges considering the Type of Track Structures (철도교량 동특성 분석을 위한 궤도형식별 모달 테스트)

  • Kim, Sung-Il;Yu, Jin-Young;Mun, Je-U;Hong, Seong-Mo;Kim, Jong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.101-108
    • /
    • 2008
  • The dynamic behavior of railway bridges originates from dynamic properties of various spans and structural types. As a result, the exact estimation of dynamic properties of the railway bridge can produce the exact estimations of dynamic performances of the railway bridge. The damping ratio affects the dynamic reponses of the railway bridge in the vicinity of the critical speed seriously. Eurocode, National Annex of each European country and Japan have their own specification for the damping ratio for the estimation of dynamic performance of railway bridges. In our case, the specification for Honam high speed railways follows the Eurocode. In the present study, for the verification and regulation of the damping ratio and investigation of various dynamic properties, modal tests of various structural types are performed. In addition, for the investigation of effects of track structures on the dynamic property of the bridge, ballast track and concrete track are installed and tested.

  • PDF

Prediction of The Rail way Track's Vibration Behavior and Corresponding Experimental Verification (철도궤도의 동적특성 예측 및 실험적 검증 연구)

  • Park, Hee-Jun;Kim, Kwan-Ju;Kim, Jea-Chul;Lee, Chan-Woo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.883-888
    • /
    • 2004
  • One of commercial rapid transits produces peculiar booming sound when passing through the slab-track tunnel. In order to analyze that tympanic membrane-pressing noise systematically, typical source-transfer path-response analysis was carried out. Considering the octave band of booming noise, work scope was confined to structure-borne noise analysis, especially the dynamic behaviour of railway tracks. Experimental modal analysis of railway tracks, composed of rail, rubber pad, sleeper, ballast, and ground were performed. The results shows that transversal bending modes of the rail are suspicious for the cause of the low band booming noise. Finite element analysis are made use of to match preceding experimental results, and plausible dynamic properties of track components are produced.

  • PDF

A Study on Real Time Catenary Impedance Estimation Technique using the Synchronized Measuring Data between Substation and Train (변전소와 차량간의 동기화를 통한 실시간 전차선로 임피던스 예측 기법 연구)

  • Jung, Hosung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.10
    • /
    • pp.1458-1464
    • /
    • 2013
  • This paper proposed a new real time catenary impedance estimation technique using synchronized power data from the measured data of operating vehicle and substation for catenary protective relay and fault locator setting. This paper presented estimation equation of catenary impedance using synchronized power data between substation and vehicle of AT feeding system for the performance verification of the proposed technique. Also AC feeding system is modeled through power analysis program and performance was verified through simulation according to various load changes. We verified that average 2.38%(distance equivalent 23.8 m) error appeared between the proposed estimation equation of catenary impedance and power analysis program simulation output in no connection double track system between up track and down track. Furthermore, We confirmed that estimation error is bigger depending on the increasing the distance from substation and vehicle impedance using only using vehicle current when calculating vehicle impedance in connection double track system between up track and down track. But, We confirmed that the proposed technique estimated accurately catenary impedance regardless of vehicle impedance and distance from substation.

Performance Evaluation of Swing-Nose Crossing on Slab Track (콘크리트궤도용 고속분기기 성능평가)

  • Kim, Si-Chul;Kim, Man-Cheol;Hwang, Kwang-Ha;Bae, Sang-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.282-291
    • /
    • 2010
  • In line with current speed-up of railroad, a slab track has been increasingly adopted in a bid to secure the safety of track structure as well as to reduce the maintenance cost, and furthermore, the need for commercialization of domestically-developed swing-nose crossing turnout on slab track has been on the rise. For commercialization of swing-nose crossing turnout on slab which was developed in Korea, a technical and systematic performance evaluation system, considering local environment, shall be established and then the performance evaluation shall be accordingly implemented. This paper was intended to summarize the performance evaluation system, referring to the data available at home and abroad and the results of performance evaluation for domestically-developed swing-nose crossing turnout on slab track carried out to date based on that system. A performance evaluation system comprises the technical requirement appropriateness evaluation(component performance evaluation and design verification), laboratory test and on-site test. For domestically-developed swing-nose crossing turnout on slab track, appropriateness evaluation and laboratory test have been completed and the on-site test of those installed on the 2nd phase of Kyung-Bu HSR is underway now.

  • PDF

The review and application of UIC 518 standard regarding railway vehicle dynamic performances (철도차량 동적 주행성능 시험 및 인증관련 국제규격 (UIC 518) 고찰 및 적용)

  • Lee Kang-Wun;Park Kil-Bae;Yang Hee-Joo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.125-130
    • /
    • 2005
  • The railway shall be verified with the view point of dynamic performances before delivering to the Customer and the verification procedure shall be followed the Customer's demands or relevant international standard, UIC 518 (Testing and approval of railway vehicles from the point of view of their dynamic behavior-Safety-Track fatigue-Ride quality). In this paper, verification procedures in UIC 518 and the test results for domestic project are summarized.

  • PDF

A study on torque measuring technique for track drive unit of earthmoving equipment with very large capacity (대형 건설장비용 주행유닛의 토크 측정기술에 관한 연구)

  • Lee, Yong-Bum;Han, Seung-Ho
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.8 no.4
    • /
    • pp.97-103
    • /
    • 2009
  • Since a demand for an extensive range of earthmoving equipment like a hydraulic excavator with a capacity of 85tons has been asked in construction fields, a performance of its track drive unit has to be verified experimentally. Among the verification of the performances, a torque measurement is at issue, in which a torque meter is utilized widely. However, the very large scaled torque meter is necessary when a discharged torque from the track drive unit is increased significantly. In addition, the price for experimental set-up of a torque meter is too high due to its limitation of the geometry such as long length, and a break down in operation occurs frequently. In this study, to measure a high torque up to 200,000Nm, a new technique was proposed as an alternative of conventional measurement by using a torque meter. The new technique enables to measure the high torque stably in a compact space via a torque arm and two load cells. The experimental results showed a propriety of the proposed torque measuring technique for a track drive unit with very large capacity.

  • PDF

Analysis of DGPS Approach and Landing Accuracy using Air Base Precision Approach Radar (비행기지 PAR을 이용한 DGPS 공항 접근 및 착륙 정확도 분석)

  • Koo, Jung;Pyo, Sang-Ho;Kang, Kyeong-Sung;Kim, Ki-Hyung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.5
    • /
    • pp.788-797
    • /
    • 2011
  • This paper analyzes the accuracy on the approach and landing of aircraft to an airport through comparison with airbase Precision Approach Radar and aircraft track data of DGPS equipped in aircraft. The proposed analysis result could be a basis for verifying the possibility that DGPS can be utilized in Airbase precision approach and landing. Position identification capability of widely used commercial DGPS is fairly accurate on latitude and longitude, while there is a slight error for being used in an airbase accurate approach and landing of Category I precision when it comes to altitude. Thus, we tested accuracy by analyzing actual flight track data of high performance aircraft to verify the accuracy of the airbase approach and landing using DGPS. Through the research, we developed instrumentation to compare PAR track data with DGPS track data, which can be used in reducing the number of PAR verification Flight utilizing it as a system measuring PAR accuracy at PAR installation phase.

A Study on the Rail Pone of Transition Curve Track to Speed Up of Tilting train (틸팅차량 완화곡선 증속 주행시 궤도작용력 검토)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.529-538
    • /
    • 2009
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured wheel load data in transition curve track, and then evaluated probability the range of wheel load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of wheel load by occured a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation (${\Delta}8{\sim}13kN$). Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation (${\Delta}25{\sim}28kN$) by changed of cant.

  • PDF