The railroad roadbed plays an important role in distributing and transferring the train loading to subgrade, preventing subgrade from bearing softened by providing appropriate stiffness for subgrade, and eventually supporting the track structures. Presently, the reinforced roadbed was widely constructed in high speed line and is proceeding a research about economical thickness and methodologies for the design of reinforced roadbed. Field test section is located at Kongbu line which is from Suwon to Pungtack. In this study, field test were measured a track irregularity with several types of reinforced roadbed materials by using Track Master. The field testing were conducted between March, 2006 and March, 2007.
The railroad roadbed plays an important role in distributing and transferring the train loading to subgrade, preventing subgrade from bearing softened by providing appropriate stiffness for subgrade, and eventually supporting the track structures. Presently, the reinforced roadbed was widely constructed in high speed line and is proceeding a research about economical thickness and methodologies for the design of reinforced roadbed. Field test section is located at Kyungbu line which is from Suwon to Cheonan In this study, field test were measured a track irregularity with several types of reinforced roadbed materials by using Track Master. The field testing were conducted between March, 2006 and April, 2008.
Lee Il-Wha;Hwang Seon-Keun;Lee Su-Hyung;Choi Chan-Young
Proceedings of the KSR Conference
/
2005.11a
/
pp.443-447
/
2005
When the high-speed train running on the track, there is a speed band which track distortion is unusually increased according to the condition of track and roadbed. This speed is called critical velocity and physical parameter value increased greatly. These phenomenon happened as high-speed train were developed, studied regularly through TGV 100 running test in France. As research result until now, the main reason is soft roadbed's capacity. Wave propagation and track support capacity is varied by the site characteristics. This paper achieved theoretical examination about resonance band(speed and frequency) that occurred in roadbed on the base rock in point of geotechnical engineering. The examination of resonance divides with ground response analysis, critical band analysis by the shear wave velocity of roadbed, train critical speed through the ground stratum.
An active application of concrete track is being expected for the future constructions of Korea railroad. For the successful construction and design in embankment section, the roadbed behavior should be reasonably estimated using the proper analysis method. In this research, behaviors of reinforced roadbed constructed with the determined stiffness and thickness at embankment section were estimated through various design parameters and numerical analysis. A three dimensional finite element method was employed to determine the proper reinforced roadbed thickness at embankment section. The displacement and vertical stress caused by train loading were estimated and compared with the field test results. The bearing characteristics of concrete track roadbed were presented. Moreover, the method to determine thickness of reinforced roadbed was proposed.
When the high-speed train running on the track, there is a speed limit which track distortion is unusually increased according to condition of track and roadbed. This speed limit is called critical velocity, and physical parameter value increased very greatly. These phenomenon happened as high-speed train were developed, studied regularly through TGV 100 running test in France. As research result until now, the main reason is soft roadbed's capacity. Wave propagation and track support capacity is varied by the site characteristics. This paper achieved theoretical examination about resonance band(speed and frequency) that occurred in roadbed on the base rock in point of geotechnical engineering. The examination of resonance divides with ground response analysis, critical band analysis by the shear wave velocity of roadbed, train critical speed through the ground stratum.
Lee Jin-Wook;Choi Chan-Yong;Lee Sung-Hyok;Lee Cnang-Youl
Proceedings of the KSR Conference
/
2004.10a
/
pp.1058-1064
/
2004
As one of reinforcing methods for soft roadbed, the problems that mud-pumping and settlement occurred by soft roadbed, were investigated, evaluated and analyzed through installing relatively economical and efficient geosynthetics on the selected track-bed for testing. Mock-heang to Dong-ryang on the filed resting sections in the Chung-buk lines were selected as investigating the state of track and prepared field after selecting three of 1,700 spots which often make mud-pumping and requiting maintenance for that. Long curved line radiuses(R) of Mock-heang to Dong-ryang are 500m that were installed with 4 types of geosynthetics layers and one ballast layer. Installed testing cross-section is 200m totally with 40 m between places. Strength or prepared roadbed was measured to investigate the state of roadbed and track with constructing(installing) field testing sections and physical properties of roadbed soils were evaluated and analyzed. Also, mud-pumping, settlement of elastic or plastic sleeper, failure or track, wheel-loads, transverse and earth pressures were measured after installing field testing sections.
Proceedings of the Korean Geotechical Society Conference
/
2000.03b
/
pp.215-222
/
2000
The reinforced roadbed should have the ability to spread out the load intensity lower than the bearing capacity of the subgrade of track structure as well as to prevent the softening of roadbed by providing appropriate stiffness in the roadbed, thus fully supports the track structures. Full scale reinforced roadbeds with several different types of monotoring sensors was also constructed to evaluate the performance of each reinforced roadbed through the continuous monitoring while the train operation. In this study, Field tests such as PLT, SASW were also carried out at each reinforced roadbed. The results of the field and lab tests, installation and calibration of sensors, as well as construction condition of the reinforced roadbed are presented.
Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.1546-1553
/
2005
In this study, geotextiles was applied on the selected track-bed, which is relatively economical and efficient way to prevent the problem of mud-pumping and settlement. Field testing sections from Mock-haeng to Dong-ryang in the Chung-buk lines in Korea were selected to investigate the state of track and roadbed. And three places were chosen among 1,700 spots where mud-pumping was frequently occurred and maintenance required. At the curved section with radius of 500m between Mock-haeng and Dong-ryang, we divided this testing site into 5 section and 4 different types of geotextile were installed and left the last section with no reinforcement. Total length of the test site was 200m and individual length of each site was 40 m. In order to understand the state and the strength of prepared roadbed, stiffness and physical properties of the roadbed soil were evaluated and analyzed. Also, after the installation, mud-pumping, settlement of elastic or plastic sleeper, failure of track, wheel-loads, lateral force and earth pressures were investigated.
The purpose of a railway track is to provide a smooth surface for safe and economical train transportation. The performance of the track results from a complex interaction of the track and subgrade components in response to train loading and environmental actions. In the past, the role of subgrade as the track foundation were not recognized adequately. There are insufficient information and inadequate methods for subgrade design, assessment and improvement. This situation has survived for a long time largely because a subgrade defect can often be adjusted by adding more ballast under the ties or applying more frequent track maintenance. Therefore, the application of reinforced roadbed technology will be expected to increase in the future. The reinforced roadbed thickness is set depending on subgrade reaction modulus($K_{30}$) in the condition of upper subgrade through PBT in both conventional railroad and KTX railroads. As train velocity (V), train passing tonnage (N), and train axial load (P) are not considered in design, the roadbed thickness could be overestimated (or underestimated). Therefore, in this study has proposed a determination method of reinforced roadbed thickness using design chart made by resilience modulus and properties of earthwork materials.
Proceedings of the Korean Geotechical Society Conference
/
2006.03a
/
pp.1320-1325
/
2006
When the train running on the high-speed track, there is a speed band which track distortion is unusually increased according to the condition of track and roadbed. This speed is called critical velocity and physical parameter values are increased greatly. These phenomenon happened as high-speed train were developed, studied regularly through TGV 100 running test in France. As research result until now, the main reason is soft roadbed's bearing capacity. Wave propagation and track support capacity is varied by the ground characteristics. This paper achieved theoretical examination about resonance band(speed and frequency) that occurred in roadbed on the base rock in point of geotechnical engineering. The examination of resonance divides with ground response analysis, critical band analysis by the shear wave velocity of roadbed and train critical speed through the ground stratum.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.