• Title/Summary/Keyword: Track deformation

Search Result 137, Processing Time 0.024 seconds

Seismic train-bridge coupled system sensitivity analysis considering random aftershock intensity and residual track deformation

  • Jincheng Tan;Manman Chen;Xiang Liu;Han Zhao;Lizhong Jiang;Peidong Guo;Wangbao Zhou;Ping Xiang
    • Structural Engineering and Mechanics
    • /
    • v.91 no.1
    • /
    • pp.25-38
    • /
    • 2024
  • After the mainshock, whether the train can be allowed to pass the bridges plays an important role in ensuring the transport of supplies and rescue works for example, in the "12 May" earthquake in China, after evaluation, the bridge was still used for transportation in rescue at a very slow speed, engineers usually evaluate whether the train can pass the bridge safely based on the experience, lacks sufficient calculation basis and does not fully consider the risk caused by aftershocks. To address this issue, this paper comprehensively considers the randomness of track irregularity, the randomness of aftershock intensity and other multiple random sources in train-bridge interaction system (TBIS). The sensitivity of train to various random parameters after earthquake is analyzed from the perspective of probability, the most sensitive random variable in this paper is PGA of aftershocks, both for bridge and trailer car, With the increase of epicentral distance, the sensitivity of PGA will decrease, and correspondingly, for trailer car, the sensitivity of other random variables will increase, research in this paper provides a basis for the subsequent random analysis of post-earthquake driving safety.

Abdominal-Deformation Measurement for a Shape-Flexible Mannequin Using the 3D Digital Image Correlation

  • Liu, Huan;Hao, Kuangrong;Ding, Yongsheng
    • Journal of Computing Science and Engineering
    • /
    • v.11 no.3
    • /
    • pp.79-91
    • /
    • 2017
  • In this paper, the abdominal-deformation measurement scheme is conducted on a shape-flexible mannequin using the DIC technique in a stereo-vision system. Firstly, during the integer-pixel displacement search, a novel fractal dimension based on an adaptive-ellipse subset area is developed to track an integer pixel between the reference and deformed images. Secondly, at the subpixel registration, a new mutual-learning adaptive particle swarm optimization (MLADPSO) algorithm is employed to locate the subpixel precisely. Dynamic adjustments of the particle flight velocities that are according to the deformation extent of each interest point are utilized for enhancing the accuracy of the subpixel registration. A test is performed on the abdominal-deformation measurement of the shape-flexible mannequin. The experiment results indicate that under the guarantee of its measurement accuracy without the cause of any loss, the time-consumption of the proposed scheme is significantly more efficient than that of the conventional method, particularly in the case of a large number of interest points.

A Study on the D-InSAR Method for Micro-deformation Monitoring in Railway Facilities (철도시설물 미소변형 모니터링을 위한 D-InSAR 기법 연구)

  • Kim, Byung-Kyu;Lee, Changgil;Kim, Winter;Yoo, Mintaek;Lee, Ilhwa
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.11
    • /
    • pp.43-54
    • /
    • 2022
  • The settlement at the railroad foundation is often the leading cause of track irregularity and potential derailment. The control of such deformation is considered necessary in track maintenance practice. Nevertheless, the monitoring process performed by in situ surveying requires an excessive amount of manpower and cost. The InSAR, a remote sensing technique by RADAR satellite, is used to overcome such a burden. The PS-InSAR technique is preferred for a long-term precise monitoring method. However, this study aims to obtain relatively brief analysis results from only two satellite images using the D-InSAR technique, while a minimum of 25 images are required for PS-InSAR. This study verifies the precision of D-InSAR within a few millimeters by inspecting railroad facilities and land settlements in Korea Railroad Research Institute's test track with images from TerraSAR-X Satellite. Multiple corner reflectors were adopted and installed on an embankment and the building roof to raise the surface reflectivity. Those reflectors were slightly adjusted periodically to verify the detecting performance. The results revealed the optimum distance between corner reflectors. Further, the deformation of railway tracks, slopes, and concrete structures was analyzed successively. In conclusion, this study indicates that the D-InSAR technique effectively monitors the short-term deformation of a broad area such as railway structures.

Parametric Study on Steel composite Girder bridges for HONAM High-Speed Railway Considering Criteria Requirement of Dynamic Response (호남고속철도 동적 안정성 요구 조건을 고려한 강합성 거더교의 변수 연구)

  • Cho, Sun-Kyu;Jung, Han-Ouk;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1370-1378
    • /
    • 2007
  • High speed railway bridge is affected on safety of bridge by dynamic amplification effect, when dynamic response of bridge is equal to effect cycle load for rolling stock axle according to high speed operation train. And excessive deformation of structure has negative effect on operation safety of train and comfort of passenger due to fluctuation of wheel load by torsion of track etc. and decrease of contact force on vehicle wheel-rail. To ensure the safety of track and train operation safety, it is have to perform the study on resonance and deformation of structure. That criteria and requirement of railway bridge is limitation of vertical acceleration on deck for dynamic behavior of structure, contact of vehicle wheel and rail, limitation of face distortion and rotation angle of end deck, and limitation of vertical displacement by train. Unlike KYEONGBU High Speed Railway, New constructed HONAM High Speed Railway have to applied the new requirement for dynamic behavior safety according to change of condition which is type of ballast (slab ballast), interval of track, and actual rolling stock load. Therefore, in this paper, it was conformed the dynamic characteristic due to parameter, which related with above mentioned criteria, for steel composite bridges.

  • PDF

Evaluation of Deformation Characteristics for Bridge/Earthwork Transition Reinforcement Methods Considering Moving Load (이동하중을 고려한 교량/토공 접속부 보강방안별 변형특성 평가)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Kang, Tae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.3
    • /
    • pp.298-303
    • /
    • 2010
  • The transition zone of the railway is the section which roadbed stiffness is suddenly varied like as tunnel-earthwork, bridge-earthwork and concrete track-ballasted track. There are about 450 tunnel-bridge transition sections on Kyungbu high-speed railway line. It is very important to pay careful attention to construction of these transition zones, in order to secure the train running safety. So, we developed a finite element model of the moving wheel loading to simulate the behavior of bridge-earthwork transitions in this paper. The most distinctive characteristics of the model proposed is to simulate the real wheel behavior on rail. And the main analysis object is to evaluate and compare the deformation characteristics of the transition zone according to the reinforcement methods and length of transition zone which is adopted to high-speed railway. Based on the analysis results, we assessed the effect of the reinforcements on the transition zone of high-speed railway.

Prediction of vibration and noise from steel/composite bridges based on receptance and statistical energy analysis

  • Liu, Quanmin;Liu, Linya;Chen, Huapeng;Zhou, Yunlai;Lei, Xiaoyan
    • Steel and Composite Structures
    • /
    • v.37 no.3
    • /
    • pp.291-306
    • /
    • 2020
  • The noise from the elevated lines of rail transit has become a growing problem. This paper presents a new method for the rapid prediction of the structure-borne noise from steel or composite bridges, based on the receptance and Statistical Energy Analysis (SEA), which is essential to the study of the generation mechanism and the design of a low-noise bridge. First, the vertical track-bridge coupled vibration equations in the frequency domain are constructed by simplifying the rail and the bridge as an infinite Timoshenko beam and a finite Euler-Bernoulli beam respectively. Second, all wheel/rail forces acting upon the track are computed by taking a moving wheel-rail roughness spectrum as the excitation to the train-track-bridge system. The displacements of rail and bridge are obtained by substituting wheel/rail forces into the track-bridge coupled vibration equations, and all spring forces on the bridge are calculated by multiplying the stiffness by the deformation of each spring. Then, the input power to the bridge in the SEA model is derived from spring forces and the bridge receptance. The vibration response of the bridge is derived from the solution to the power balance equations of the bridge, and then the structure-borne noise from the bridge is obtained. Finally, a tri-span continuous steel-concrete composite bridge is taken as a numerical example, and the theoretical calculations in terms of the vibration and noise induced by a passing train agree well with the field measurements, verifying the method. The influence of various factors on wheel/rail and spring forces is investigated to simplify the train-track-bridge interaction calculation for predicting the vibration and noise from steel or composite bridges.

Development of Prefabricated Slab Panel for Asphalt Concrete Track (아스팔트 콘크리트 궤도용 사전제작형 슬래브 패널 개발)

  • Baek, In-Hyuk;Lee, Seong-Hyeok;Shin, Eung-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.75-82
    • /
    • 2019
  • Slab panels are very important to develop asphalt concrete (AC) track for minimizing the roadbed stress due to the train load and reducing the plastic deformation of infrared-sensitive AC. In this study, the slab panel for AC track was developed through the shape design and the indoor performance test and its structural integrity has been investigated through the finite element analysis under the flexural tensile stress and the design moment according to various static load combination by KRL-2012 standard train load model and KR-C code. In order to verify the suitability of the slab panel for AC track, static bending strength test and dynamic bending strength test were performed according to EN 13230-2. Results show that the slab panel for AC track satisfies all the performance standards required by European standards such as crack loads and crack extension.

Evaluation of Applicability of Apparent Track Stiffness Measured by Light-Weight Deflectometer as a Ballasted Track Condition Index (소형동평판재하시험기로 측정한 궤도 겉보기 강성의 자갈궤도 상태평가 지표로서의 적용성 고찰)

  • Choi, Yeong-Tae;Hwang, Sung Ho;Jang, Seung Yup;Park, Bongsik;Shim, Gwang Seop
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.2
    • /
    • pp.37-44
    • /
    • 2018
  • Ballasted track has been widely used due to its flexibility. However, the plastic deformation of ballasted track causes the evolution of track geometrical errors, and hence it requires continuous maintenance; increase in number of trains, weight, and speed expedites maintenance frequency and cost as well. Ballast stiffness is well-known as an indicator of design and maintenance. In this regard, this paper aims to suggest the method to measure ballast track stiffness using light-weight deflectometer (LWD) and thus verify its applicability as a maintenance measure. Preliminary field tests determined simple field testing protocol to measure track stiffness. The apparent ballast stiffness by LWD shows good corelation with TQI (Track Quality Index) and maintenance length. That is, as average of apparent stiffness increase, TQI and tamping length decrease exponentially. Therefore, apparent stiffness can be used as an index for ballast condition assessment.

Analysis on Deformation Behavior of High Strength Steel using the Finite Element Method in Conjunction with Constitutive Model Considering Elongation at Yield Point (항복점연신이 고려된 유한요소 해석을 통한 고강도강의 변형 거동 연구)

  • Yoon, Seung Chae;Moon, Man Been;Kim, Hyoung Seop
    • Korean Journal of Metals and Materials
    • /
    • v.48 no.7
    • /
    • pp.598-604
    • /
    • 2010
  • Tensile tests are widely used for evaluating mechanical properties of materials including flow curves as well as Young's modulus, yield strength, tensile strength, and yield point elongation. This research aims at analyzing the plastic flow behavior of high strength steels for automotive bodies using the finite element method in conjunction with the viscoplastic model considering the yield point elongation phenomenon. The plastic flow behavior of the high strength steel was successfully predicted, by considering an operating deformation mechanism, in terms of normalization dislocation density, and strain hardening and accumulative damage of high strength steel using the modified constitutive model. In addition, the finite element method is employed to track the properties of the high strength steel pertaining to the deformation histories in a skin pass mill process.

Optimal Section of Ballasted Asphalt Track Considering Design Lifetime and Economic Feasibility (설계수명 및 경제성을 고려한 유도상 아스팔트 궤도의 최적 단면 산정)

  • Lee, Seonghyeok;Lee, Jinwook;Lee, Hyunmin
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.241-251
    • /
    • 2015
  • Compared with ballasted track (BT), ballasted asphalt track (BAT) has been increasingly adopted in many countries due to its more greatly reduced reinforced roadbed thickness and smaller cumulative plastic deformation, and its advantages in terms of maintenance. In this respect, the authors' previous research includes analysis of BAT sections that show performance similar to that of BT sections of the present specifications; reliability verification of the analysis results through real-sized static and dynamic train-load tests were performed. Based on previous research, this paper estimates the track lifetime using the strain of the lower roadbed according to reinforced roadbed thickness; using probabilistic LCC analysis, this paper presents a BAT section that satisfies the design lifetime and that has performance similar to or higher than that of BT.