• Title/Summary/Keyword: Total cost

Search Result 4,453, Processing Time 0.041 seconds

Risk-averse Inventory Model under Fluctuating Purchase Prices (구매가격 변동시 위험을 고려한 재고모형)

  • Yoo, Seuck-Cheun;Park, Chan-Kyoo;Jung, Uk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.35 no.4
    • /
    • pp.33-53
    • /
    • 2010
  • When purchase prices of a raw material fluctuate over time, the total purchasing cost is mainly affected by reordering time. Existing researches focus on deciding the right time when the demand for each period is replenished at the lowest cost. However, the decision is based on expected future prices which usually turn out to include some error. This discrepancy between expected prices and actual prices deteriorates the performance of inventory models dealing with fluctuating purchase prices. In this paper, we propose a new inventory model which incorporates not only cost but also risk into making up a replenishment schedule to meet each period's demand. For each replenishment schedule, the risk is defined to be the variance of its total cost. By introducing the risk into the objective function, the variability of the total cost can be mitigated, and eventually more stable replenishment schedule will be obtained. According to experimental results from crude oil inventory management, the proposed model showed better performance over other models in respect of variability and cost.

Economic Design of Tool Resetting Period in NC Machining (NC 선반가공에서 공구 조정주기의 경제적 설계)

  • 배문택;윤원영;목학수
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.6
    • /
    • pp.33-39
    • /
    • 1998
  • This paper is related to economic design of tool-resetting period in NC machining. In NC lathe machining, the mean and variance of components dimension fluctuate in slow time and we should reset tool program to compensate the variation from the fluctuation. In this paper. we propose the procedure determining the optimal resetting period based on the total expected operating cost which consists of resetting cost and the quality cost related to dimension variation. As a case study, using experimental data about dimension changes of a lathe machining, we obtain the regression equations of mean and variance of the dimension fluctuation, total expected operating cost, and optimal resetting period.

  • PDF

Nonlinear Tolerance Allocation for Assembly Components (조립품을 위한 비선형 공차할당)

  • Kim, Kwang-Soo;Choi, Hoo-Gon
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.39-44
    • /
    • 2003
  • As one of many design variables, the role of dimension tolerances is to restrict the amount of size variation in a manufactured feature while ensuring functionality. In this study, a nonlinear integer model has been modeled to allocate the optimal tolerance to each individual feature at a minimum manufacturing cost. While a normal distribution determines statistically worst tolerances with its symmetrical property in many previous tolerance allocation studies, a asymmetrical distribution is more realistic because its mean is not always coincident with a process center. A nonlinear integer model is modeled to allocate the optimal tolerance to a feature based on a beta distribution at a minimum total cost. The total cost as a function of tolerances is defined by machining cost and quality loss. After the convexity of manufacturing cost is checked by the Hessian matrix, the model is solved by the Complex Method. Finally, a numerical example is presented demonstrating successful model implementation for a nonlinear design case.

Optimum Safety Indices Based On Expected Total Cost Minimization (총기대비용 최소화원칙에 의한 최적신뢰성지수)

  • 이증빈;신형우;장석모
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1993.10a
    • /
    • pp.216-223
    • /
    • 1993
  • The safety factors of current standard code are considered to be not appropriate compared to design and construction practices, even this safety factors are not determined from probabilistic study but merely from experiences and practices. This study pripose the optimum safety indices based on expected total cost minimization using only three parameters, which are the level of the failure cost to the initial cost by improvement in safety, and the order of the initial cost function.

  • PDF

Optimal Burn-In under Warranty

  • Kim, Kuinam-J;Park, Chi-Yeon
    • Journal of the Korea Safety Management & Science
    • /
    • v.1 no.1
    • /
    • pp.135-143
    • /
    • 1999
  • This paper discusses an optimal burn-in procedure to minimize total costs based on the assumption that the failure rate pattern follows a bimodal mixed Weibull distribution. The procedure will consider warranty period as a factor of the total expected bum-in cost. A cost model is formulated to find the optimal burn-in time that minimizes the expected burn-in cost. Conditional reliability for warranty period will be discussed. An illustrative example is included to show how to use the cost model in practice.

  • PDF

소프트웨어 비용추정 모형에 관한 소고

  • Kim, In-Su;Lee, Dae-Gi
    • ETRI Journal
    • /
    • v.9 no.3
    • /
    • pp.139-156
    • /
    • 1987
  • The problems in software cost management are well known. Cost estimates are too low. Software development projects frequently have cost overruns, which are due to poor estimates. A fair amount of work have been done toward developing cost estimation models. These models vary in their outputs (e. g., total cost, manning schedule) and in the factors used to calculate their estimates. They also vary with regard to the type of formula, parameters, use of previous data, and staffing considerations. This paper will distinguish them by the type of formula they use to calculate total effort and staffing level, and will discuss enough models to demonstrate the characteristics of each model category.

  • PDF

Economic analysis of thorium extraction from monazite

  • Salehuddin, Ahmad Hayaton Jamely Mohd;Ismail, Aznan Fazli;Bahri, Che Nor Aniza Che Zainul;Aziman, Eli Syafiqah
    • Nuclear Engineering and Technology
    • /
    • v.51 no.2
    • /
    • pp.631-640
    • /
    • 2019
  • Thorium ($^{232}Th$) is four times more abundant than uranium in nature and has become a new important source of energy in the future. This is due to the ability of thorium to undergo the bombardment of neutron to produce uranium-233 ($^{233}U$). The aim of this study is to investigate the production cost of thorium oxide ($ThO_2$) resulted from the thorium extraction process. Four main parameters were studied which include raw material and chemical cost, total capital investment, direct cost and indirect cost. These parameters were justified to obtain the final production cost for the thorium extraction process. The result showed that the raw material costs were $63,126.00 - $104,120.77 (0.5 ton), $126,252.00 - $178,241.53 (1.0 ton), and $1,262,520.00 - $1,782,415.33 (10.0 tons). The total installed equipment and total cost investment were estimated to be approximately $11,542,984.10 and $13,274,431.715 respectively. Hence, the total costs for producing 1 kg $ThO_2$ were $6829.79 - $6911.78, $3540.95 - $3592.94, and $501.18 - $553.17 for 0.5, 1.0, and 10.0 tons respectively. The result concluded that with higher mass production, the cost of 1 kg $ThO_2$ would be reduced which in this scenario, the lowest production cost was $$501.18kg^{-1}$-$$553.17kg^{-1}$ for 10.0 tons of $ThO_2$ production.

A Evaluation System Integrating Cost-Cross Effects of Big Scale R&D Projects (R&D프로젝트군의 우선순위 결정을 위한 비용 - 상호효과 통합평가시스템)

  • Kwon, Cheol-Shin;Lee, Soon-Cheon;Park, Jooh-Ho
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.2
    • /
    • pp.163-175
    • /
    • 2007
  • [ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.

Development of the Model for Total Quality Management and Cost of Quality using Activity Based Costing in the Hospital (병원의 활동기준원가를 이용한 총체적 질관리 모형 및 질비용 산출 모형 개발)

  • 조우현;전기홍;이해종;박은철;김병조;김보경;이상규
    • Health Policy and Management
    • /
    • v.11 no.2
    • /
    • pp.141-168
    • /
    • 2001
  • Healthcare service organizations can apply the cost of quality(COQ) model as a method to evaluate a service quality improvement project such as Total Quality Management (TQM). COQ model has been used to quantify and evaluate the efficiency and effectiveness of TQM project through estimation between cost and benefit in intervention for a quality Improvement to provide satisfied services for a customer, and to identify a non value added process. For estimating cost of quality, We used activities and activity costs based on Activity Based Costing(ABC) system. These procedures let the researchers know whether the process is value-added by each activity, and identify a process to require improvement in TQM project. Through the series of procedures, health care organizations are service organizations can identify a problem in their quality improvement programs, solve the problem, and improve their quality of care for their costumers with optimized cost. The study subject was a quality improvement program of the department of radiology department in a hospital with n bed sizes in Metropolitan Statistical Area (MSA). The principal source of data for developing the COQ model was total cases of retaking shots for diagnoses during five months period from December of the 1998 to April of the 1999 in the department. First of the procedures, for estimating activity based cost of the department of diagnostic radiology, the researchers analyzed total department health insurance claims to identify activities and activity costs using one year period health insurance claims from September of the 1998 to August of the 1999. COQ model in this study applied Simpson & Multher's COQ(SM's COQ) model, and SM's COQ model divided cost of quality into failure cost with external and internal failure cost, and evaluation/prevention cost. The researchers identified contents for cost of quality, defined activities and activity costs for each content with the SM's COQ model, and finally made the formula for estimating activity costs relating to implementing service quality improvement program. The results from the formula for estimating cost of quality were following: 1. The reasons for retaking shots were largely classified into technique, appliances, patients, quality management, non-appliances, doctors, and unclassified. These classifications by reasons were allocated into each office doing re-taking shots. Therefore, total retaking shots categorized by reasons and offices, the researchers identified internal and external failure costs based on these categories. 2. The researchers have developed cost of quality (COQ) model, identified activities by content for cost of quality, assessed activity driving factors and activity contribution rate, and calculated total cost by each content for cost for quality, except for activity cost. 3. According to estimation of cost of quality for retaking shots in department of diagnostic radiology, the failure cost was ₩35,880, evaluation/preventive cost was ₩72,521, two times as much as failure cost. The proportion between internal failure cost and external failure cost in failure cost is similar. The study cannot identify trends on input cost and quality improving in cost of qualify over the time, because the study employs cross-sectional design. Even with this limitation, results of this study are much meaningful. This study shows possibility to evaluate value on the process of TQM subjects using activities and activity costs by ABC system, and this study can objectively evaluate quality improvement program through quantitative comparing input costs with marginal benefits in quality improvement.

  • PDF

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF