• Title/Summary/Keyword: Total Nitrogen(T-N) Removal

Search Result 105, Processing Time 0.054 seconds

Removal of Organics and Nirtogen in Wastewater Using 2 Stage A/O(RBC) Process (RBC 반응조를 이용한 2단 A/O 공정에서 유기물질 및 질소제거)

  • 최명섭;손인식
    • Journal of Environmental Health Sciences
    • /
    • v.29 no.3
    • /
    • pp.59-64
    • /
    • 2003
  • This study was conducted to investigate anoxic-RBC-anoxic-RBC process and its application to remove biologically organics and nitrogen. BOD and total-nitrogen(T-N) removal efficiencies were decreased as volumetric loading rate increased. But, the removal efficiency changes of T-N were little, as compared to BOD. Increase of internal recycle rate had few affect of BOD and T-N removal rates. Also, influent allocation(to 2nd anoxic reactor) had few affect of BOD removal efficiency rate. However, when the influent allocation rate was 30%, T-N removal efficiency was increased to 84.1 %. BOD/N ratio applied to 2nd anoxic reactor was increased to range of 3.65-4.37 as influent allocation rate increased to range 20∼35%. But, it might also cause adverse effect such as decrease of denitrification rate in excessive influent allocation rate.

Nitrogen and Phosphorus Removal in Domestic Wastewater using SBR Process with Flow Changing Continuous Feed and Cyclic Draw (교대연속유입식 SBR 공정을 이용한 하수중의 질소 및 인 제거)

  • Seo, In-seok;Kim, Hong-suck;Kim, Youn-kwon;Kim, Ji-yeon
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.2
    • /
    • pp.203-208
    • /
    • 2006
  • A continuous feed and cyclic draw SBR process was developed to overcome flow rate fluctuation and to maximize organic matters utilization efficiency for nitrogen and phosphorus removal. The developed SBR process was operated with two parallel reactors. Influent was supplied to one reactor which was not obligately aerated. At the same time, the other reactor was just aerated without supplying influent. In addition this mode was changed periodically. Cycle time was 6hr and aeration time ratio($t_{aer}/t_{total}$) was 0.33, respectively. $COD_{cr}$ and SS removal efficiencies of 95% or higher were achieved. Nitrogen removal was so greatly influenced by influent $COD_{cr}/T-N$ ratio. At influent $COD_{cr}/T-N$ ratio of 5.7, removal efficiencies of ammonia-N, T-N and T-P were 96%, 78% and 55%, respectively. Influent $COD_{cr}/T-N$ of 4 or higher ratio was necessary to achieve 60% or higher nitrogen removal. Organic matters of influent was efficiently utilized in denitrification reaction and consumed COD has a good correlation with removed T-N(about 6.5 mgCOD/mgTN). Continuous feed and cyclic draw SBR process could be one of alternative processes for the removal of nutrients in rural area where $COD_{cr}/T-N$ ratio was low and fluctuation of flow rate was severe.

Simultaneous Removal of Organic and Nitrogen in the Treatment of Fish Processing Wastewater using Entrapped Mixed Microbial Cell (EMMC) Process (Entrapped Mixed Microbial Cell (EMMC) 공정을 이용한 수산물 가공 폐수처리에서 유기물 및 질소 동시제거)

  • Jeong, Byung Cheol;Park, Kwon Sam;Jeong, Byung Gon
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.3
    • /
    • pp.492-497
    • /
    • 2006
  • Feasibility of simultaneous removal of organic materials and nitrogen in the wastewater from fisheries processing plant was evaluated using entrapped mixed microbial cell (EMMC) process. The experiment was performed using activated sludge from municipal sewage treatment plant which was immobilized with gel matrix by cellulose triacetate. It was found the stable operation at the treatment system which is composed of anoxic and oxic tank, was possible when the organic and nitrogen loading rates were increased stepwise. The organic and nitrogen loading rates were conducted from 0.65 to $1.72kgCOD/m^3/d$ and from 0.119 to $0.317kg\;T-N/m^3/d$ with four steps, respectively. The maximum nitrogen loading rate which could satisfy the regulated effluent standard of nitrogen concentration, was $0.3kg\;T-N/m^3/d$. The removal efficiency of total nitrogen was decreased apparently as increasing nitrogen loading rates, whereas the removal efficiency of ammonium nitrogen was effective at the all tested nitrogen loading rates. Therefore, it was concluded that nitrification was efficient at the system. Nitrate was removed efficiently at the anoxic tank. whereas the nitrification efficiency at the oxic tank ranged 94.0% to 96.9% at the tested loading rates. The removal efficiencies of chemical oxygen demand (COD) and those of total nitrogen at the entire system ranged from 94.2% to 96.6% and 73.4% to 83.4%, respectively.

Nitrogen Removal Rate of Free-Water-Surface Treatment Wetland System Constructed on Floodplain During Its Initial Operating Stage (고수부지에 조성한 수질정화 자유수면습지의 초기운영단계 질소제거)

  • Yang, Hongmo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.6
    • /
    • pp.41-48
    • /
    • 2003
  • Nitrogen removal rate and emergent plant growth were investigated of a free-water-surface constructed treatment wetland system, whose dimensions were 31m in length and 12m in width. The system was constructed on floodplain in the Kwangju Stream from May to June 2001. Cattails(Typha angustifolia) were transplanted from natural wetlands and their stems were cut at about 40cm height from their bottom ends. Water of the Kwangju Stream were funneled into the system by gravity flow and its treated effluent was discharged back into the stream. The average height of the cattail stems was 45.2cm in July 2001 and 186cm in October 2001. The number of stems averaged 22 stems/$m^2$ in July 2001 and 52 stems/$m^2$ in September 2001. Volume and water quality of inflow and outflow were analyzed from July 2001 through December 2001. Inflow and outflow averaged 40.01 and 39.55 $m^3$/day, respectively. Hydraulic detention time was about 1.5 days. Average nitrogen uptake by cattails was 69.31 $N\;mg\;m^{-2}\;day^{-1}$. Removal rate of $NO_3-N$, $NH_3-N$ and T-N averaged 195.58, 53.65 and 628.44 $mg\;m^{-2}\;day^{-1}$, respectively. The average removal rate of T-N was about 39%.

Nitrogen and Phosphorus Removal Efficiency of Aluminum Usage in DEPHANOX Process (DEPHANOX 공정 내 알루미늄 첨가에 따른 질소 및 인 제거 효율 평가)

  • Lee, Beom;Park, Noh-Back;Tian, Dong-Jie;Heo, Tae-Young;Jun, Hang-Bae
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.34 no.5
    • /
    • pp.295-303
    • /
    • 2012
  • Removal of total nitrogen (T-N) and total phosphorus (T-P) was evaluated in a DEPHANOX process by adding Al(III) to the separator to maintain T-P in the final effluent below 0.2 mg/L. pH in each reactor was maintained 7~8 after addition of Al(III) to the levels of 5, 10, 15 mg/L. The removal efficiency of COD and T-N decreased at higher Al(III) dose, but T-P removal efficiency increased from 76.28 to 84.02, 94.66% at Al(III) dose of 5, 10, 15 mg/L, respectively. T-P in effluent showed 0.17 mg/L at Al(III) dose of 15 mg/L. Minimum 15 mg/L of Al(III) was required to maitain T-P below 0.2 mg/L in the final effluent.

GPS-X Based Modeling on the Process of Gang-byeon Sewage Treatment Plant and Design of Recycle Water Treatment Process (GPS-X 기반 모델링에 의한 강변사업소 처리효율 분석 및 반류수 처리 공정 설계)

  • Shin, Choon Hwan
    • Journal of Environmental Science International
    • /
    • v.25 no.11
    • /
    • pp.1493-1498
    • /
    • 2016
  • The efficiencies of Gang-Byeon sewage treatment facilities, which are based on GPS-X modelling, were analysed and used to design recycle water treatment processes. The effluent of an aeration tank contained total kjeldahl nitrogen (TKN) of 1.8 mg/L with both C-1 and C-2 conditions, confirming that most ammonia nitrogen ($NH_3{^+}-N$) was converted to nitrate nitrogen ($NO_3{^-}-N$). The concentrations of $NH_3{^+}-N$ and $NO_3{^-}-N$ were found to be 222.5 and 227.2 mg/L, respectively, with C-1 conditions and 212.2 and 80.4 mg/L with C-2 conditions. Although C-2 conditions with higher organic matter yielded a slightly higher nitrogen removal efficiency, sufficient denitrification was not observed to meet the discharge standards. For the total nitrogen (T-N) removal efficiency, the final effluent concentrations of T-N were 293.8 mg/L with biochemical oxygen demand (BOD) of 2,500 mg/L, being about 1.5 times lower than that (445.3 mg/L) with BOD of 2,000 mg/L. Therefore, an external carbon source to increase the C/N ratio was required to get sufficient denitrification. During the winter period with temperature less than $10^{\circ}C$, the denitrification efficiency was dropped rapidly even with a high TKN concentration (1,500 mg/L). This indicates that unit reactors (anoxic/aerobic tanks) for winter need to be installed to increase the hydraulic retention time. Thus, to enhance nitrification and denitrification efficiencies, flexible operations with seasons are recommended for nitrification/anoxic/denitrification tanks.

A Study on the Simultaneous Removal of Organics and Nutrients in Upflow Packed Bed Column Reactor (상향류식 충전탑형 반응기에 의한 유기물 및 영양염류 동시 제거에 관한 연구)

    • KSBB Journal
    • /
    • v.18 no.3
    • /
    • pp.234-238
    • /
    • 2003
  • Biofilm process is preferred to activated sludge process in small domestic wastewater treatment plant because of its simplicity in operation and maintenance. Column reactor filled with waste ceramics and with waste plastics was used to remove pollutants in restaurant wastewater. COD removal at 18 hours of hydraulic retention time (HRT) gave 93.7%, COD removal during the experimental period, where maximum COD removal was observed. Under same condition, average removal of total nitrogen and total phosphorus were 82.3% and 25.9%, respectively Organic and nitrogen were efficiently removed with the HRT of 18 hours or more.

The Nitrogen Removal of Municipal Wastewater with HRT using CNR Process (CNR공법의 체류시간에 따른 도시하수의 질소제거)

  • 김영규;양익배;김인배
    • Journal of Environmental Health Sciences
    • /
    • v.26 no.3
    • /
    • pp.98-102
    • /
    • 2000
  • The aim of this study was to evaluate on the removal effect of total nitrogen in municipal wastewater by decreasing hydraulic retention time(HRT) from 6 hour to 4 hour on CNR process. CNR-A(Cilia Nutrient Removal) is the process combining A2/O process with cilium media of H2L corporation. The removal efficiencies for T-N were 63.1% in A-1 reactor, and 73.5% in A-2 reactor and 77.0% in A-3 reactor. The specific nitrification(g-NH3-N/g-MLVSS.d) of Oxic in CNR-A process was 0.07-0.32. The specific denitrification in Anoxic and the specific nitrification inOxic was higher in HRT 4 hour because of optimum F/M ratio.

  • PDF

Effects of pH on the growth, total nitrogen, total phosphorus and organic compound removal in heterotrophic culture of Chlorella sorokiniana applied wastewater treatment (pH와 탄소원이 Chlorella sorokiniana의 heterotrophic 배양 및 하폐수고도처리능에 미치는 영향)

  • Park, Jeong-Eun;Cho, Yong-Beom;Zhang, Shan;Hwang, Sun-Jin
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.6
    • /
    • pp.703-709
    • /
    • 2013
  • Among many microalgae cultivation types, heterotrophic culture with low cost carbon sources and energy saving culture method is crucial. A result of estimating the effects of pH on wastewater treatment using heterotrophic growing microalgae Chlorella sorokiniana shows that there was no difference in microalgae growth amount and nitrogen, phosphorus removal rate by wide range of pH(5 ~ 9). From pH 5 to 9, total nitrogen, phosphorous and glucose removal rates were 10.5 mg-N/L/d, 2 mg-P/L/d, 800 ~ 1000 mg/L respectively. This study reveals that C. sorokiniana cannot metabolite glycerol heterotrophically, however, glucose and acetate were proper carbon sources for growth and T-N, T-P and TOC removal. This research highlights the potential of heterotrophic microalgal growth with wastewater treatment plant with wide range of pH and carbon sources.

A Study on Seasonal Nitrogen Treatment Characteristics according to Design of Constructed Wetland (인공습지의 형태에 따른 계절별 질소처리 특성 연구)

  • Son, Yeong-Kwon;Yoon, Chun-Gyeong;Kim, Jun-Sik;Kim, Hyung-Joong
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.1
    • /
    • pp.94-101
    • /
    • 2012
  • The performance data for eight years from a free-surface-flow constructed wetland system receiving agricultural tailwater were used to analyze denitrification rate and nitrogen treatment characteristics according to season and wetland design. Seasonal difference between growing season (March~November) and winter season (December~February) was shown in the concentration of all nitrogen species. Seasonal nitrogen treatment has similar trend with temperature and measured denitrification rate. The highest denitrification rate was measured in July, but treatment efficiency was most higher in May and June. Nitrogen absorption of vegetation could affect to these wetland performances, therefore dense population of wetland vegetation might be helpful. According to design of wetland, at least 25~50 m of wetland length was needed to decrease effluent T-N concentration to background concentration in growing season. In winter season, wetland needed much longer distance to reduce T-N concentration. Mass removal rate was continuously high through whole year because runoff coefficient was low in winter season. Applicability of constructed wetland was observed for the total maximum daily load that control T-N load.