• Title/Summary/Keyword: Timing phase

Search Result 372, Processing Time 0.021 seconds

Optimal Switching Position of Two-Phase Brushless DC Motor with the Consideration of Vibration (진동을 고려한 2상 BLDC 모터의 최적 스위칭 위치)

  • 정중기;최연선
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11a
    • /
    • pp.465-470
    • /
    • 2001
  • Two-phase BLDC(brushless DC) motor has larger torque ripple than three-phase BLDC motor because of its unique skeleton-type structure. An electronic switching mechanism to change the current-direction of the BLDC motor can be a source of vibration as well as unbalanced rotor weight. A proper switching timing which makes less vibrations was considered by changing the position of sensing element around the center of rotation. Also, the current of the motor was measured for the calculation of the motor efficiency. From the vibration test results and with the consideration of the motor efficiency, an optimal switching position of the Hall sensor was found.

  • PDF

Implementation of Phase Shift Full-Bridge PWM Converter Using DSP (DSP를 이용한 위상 천이 풀-브릿지 컨버터의 디지털 제어기 구현)

  • Lim Soo-Hyun;Lim Jeong-Gyu;Chung Se-Kyo;Lee Hyun-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2006.06a
    • /
    • pp.137-139
    • /
    • 2006
  • This paper present an implementation of digital control system for a phase-shift full-bridge converter using a digital signal processor. The digital control of phase-shift full-bridge converter provides many advantageous of easily generating various phase-shift timing and implementing a complex voltage and current control algorithm. The digital controller is implemented using the DSP TMS320F2812 and the converter and controller operation is proved through the experimental results.

  • PDF

Fundamental Study on Liquid Phase LPG Injection System for Heavy-Duty Engine (I) (대형엔진용 액상분사식 LPG 연료공급 방식에 대한 기초연구 (1))

  • 김창업;오승묵;강건용
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.9 no.4
    • /
    • pp.85-91
    • /
    • 2001
  • LPG has been well known as a clean alternative fuel for vehicles. As a fundamental study on liquid phase LPG injection (hereafter LPLI) system application to heavy-duty engine, engine output and combustion performance were investigated with various operating conditions using a single cylinder engine equipped with the LPLI system. Experimental results revealed that no problems were occurred in application of the LPG fuel to heavy-duty engine, and that volumetric efficiency and engine output, by 10% approximately, were increased with the LPLI system. It was resulted from the decrease of the intake manifold temperature through liquid phase LPG fuel injection. These results provided an advantage in the decrease of the exhaust gas temperature, in the control of knocking phenomena, spark timing and compression ratio. The LPLI engine could normally operated under $\lambda$=1.5 or EGR 30% condition. The optimized swirl ratio for the heavy duty LPG engine was found around R_s$ = 2.0.

  • PDF

A Study on the Fuel Behaivor with Cavity Diameter in a Gasoline Direct Injection Engine (직분식 가솔린 엔진에서 피스톤 캐비티 반경에 따른 연료 거동 분석)

  • Kim, Tae-An;Kang, Jeong-Jung;Kim, Duck-Jool
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.472-477
    • /
    • 2003
  • This study was performed to investigate the behavior of vapor phase of fuel mixtures with different piston cavity diameters in a optically accessible engine. The images of vapor phases were measured in the motoring engine using exciplex fluorescence method. The conventional engine was modified as GDI engine with swirl flow. Fuel was injected into atmospheric nitrogen to prevent quenching phenomenon by oxygen. Injection pressure is 5.1MPa. Two dimensional spray fluorescence image of vapor phases was acquired to analyze spray behavior and fuel distribution inside of cylinder. Three injection timings were set at BTDC $180^{\circ}$, $60^{\circ}$and $60^{\circ}$. With a fuel injection timing of BTDC $60^{\circ}$, fuel-rich mixture was concentrated in near the cavity center. With a fuel injection timing of BTDC $60^{\circ}$, fuel-rich mixture level in the center region was highest in the S-type during the late compression stroke. With a fuel injection timing of BTDC $180^{\circ}$, fuel was not affected in a piston cavity and generally distributed as homogeneous mixture.

  • PDF

Low-complexity implementation of OFDMA timing delay detector with multiple receive antennas for broadband wireless access (광대역 무선 액세스를 위한 다중 수신안테나를 갖는 OFDMA 시스템의 낮은 복잡도의 타이밍 딜레이 추정기 구현)

  • Won, Hui-Chul
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.12 no.3
    • /
    • pp.19-30
    • /
    • 2007
  • In this paper, we propose low-complexity implementation of orthogonal frequency division multiple access (OFDMA) timing delay detector with multiple receive antennas for broadband wireless access (BWA). First, in order to reduce the computational complexity, the detection structure which rotates the phase of the received ranging symbols is introduced. Second, we propose the detection structure with the N-point/M-interval fast Fourier transform structure and a frequency-domain average-power estimator for complexity reduction without sacrificing the system performance. Finally, simulation results for the proposed structures and complexity comparison of the existing structure with the proposed detectors are presented.

  • PDF

Effective timing synchronization methods for femtocell (펨토 기지국의 효과적인 타이밍 동기방안)

  • Shin, Jun-Hyo;Kim, Jung-Hun;Jeong, Seok-Jong
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.237-241
    • /
    • 2008
  • Femtocells are cellular access points that connect to a mobile operator's network using residential DSL or cable broadband connections. They have been developed to work with a range of different cellular standards including CDMA, GSM and UMTS. Like legacy base station, the frequency accuracy and phase alignment is necessary for ensuring the quality of service (QoS) for applications such as voice, real-time video, wireless hand-off, and data over a converged access medium at the femtocell. But, the GPS has some problem to be used at the femtocell, because it is difficult to set-up, depends on the satellite condition, and very expensive. So, some techniques are discussed to alternate with the legacy GPS system. NTP, PTP, Synchronous Ethernet use the ethernet to synchronize distributed clocks in packet networks. AGPS support reliable position information than the legacy GPS in poor signal conditions. But, These method also have some problems. So, hybrid timing method like A-GPS+PTP and TV+GPS was developed to make up the weak point of GPS. This paper introduces the each method and compare each other and y propose much better solution for timing synchronization at the Femtocell

  • PDF

Survey of Signal Design for Global Navigation Satellite Systems (GNSS 신호 설계 동향조사)

  • Jong Hyun Jeon;Jeonghang Lee;Jeongwan Kang;Sunwoo Kim;Jung-Min Joo
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.13 no.1
    • /
    • pp.1-13
    • /
    • 2024
  • In this paper, we investigate the signal design of six (USA, EU, Russia, China, Japan, and India) countries for Global Navigation Satellite Systems (GNSS). Recently, a navigation satellite system that is capable of high-precision and reliable Positioning, Navigation, Timing (PNT) services has been developed. Prior to system design, a survey of the signal design for other GNSS systems should precede to ensure compatibility and interoperability with other GNSS. The signal design includes carrier frequency, Pseudorandom Noise (PRN) code, modulation, navigation service, etc. Specifically, GNSS is allocated L1, L2, and L5 bands, with recent additions of the L6 and S bands. GNSS uses PRN code (such as Gold, Weil, etc) to distinguish satellites that transmit signals simultaneously on the same frequency band. For modulation, both Binary Phase Shift Keying (BPSK) and Binary Offset Carrier (BOC) have been widely used to avoid collision in the frequency spectrum, and alternating BOCs are adopted to distinguish pilot and data components. Through the survey of other GNSS' signal designs, we provide insights for guiding the design of new satellite navigation systems.

Measurement of Reference Phase Offset for the Loran-C Transmitting Signal of Pohang (포항 로란-C 송신 신호의 기준위상 오프셋 측정)

  • Lee, Chang-Bok;Won, Sung-Ho;Lee, Jong-Koo;Kim, Young-Jae;Lee, Sang-Jeong;Yang, Sung-Hoon
    • Journal of Navigation and Port Research
    • /
    • v.36 no.6
    • /
    • pp.475-480
    • /
    • 2012
  • In order to establish eLoran (enhanced Long Range Navigation) system, it needs the advancement of receiver, transmitter, data channel addition for Loran information, differential Loran sites for compensating Loran-c signal and ASFs (Additional Secondary Factors) database, etc. In addition, the precise synchronization of transmitting station to the UTC (Coordinated Universal Time) is essential if Loran delivers the high absolute accuracy of navigation demanded for maritime harbor entrance. For better timing synchronization to the UTC among transmitting stations, it is necessary to measure and monitor the transmission delay of the station, and the correction information of the transmitting station should be provided to the user's receivers. In this paper we presented the measurement method of absolute delay of Pohang Loran transmitting station and developed a time delay measurement system and a phase monitoring system for Loran station. We achieved -2.23 us as a result of the absolute phase delay of Pohang station and the drift of Loran pulse of the station was measured about 0.3 us for a month period. Therefore it is necessary to measure the delay offset of transmitting station and to compensate the drift of the Loran signal for the high accuracy application of PNT (Positioning, Navigation and Timing).

Preliminary Design of GBAS Onboard Test Equipment

  • Jeong, Myeong-Sook;Ko, Wan-Jin;Bae, Joong Won;Jun, Hyang Sig
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.2 no.1
    • /
    • pp.41-48
    • /
    • 2013
  • When the ground subsystem of Ground Based Augmentation System(GBAS) is installed at the airport, the functions and performance of subsystem should be evaluated through ground and flight testing at the pre-commissioning phase. In the case of GBAS flight testing, it can be conducted by the existing flight check aircraft, but the GBAS ground testing requires the development of specially customized equipment to perform the ground testing. Therefore, this paper describes the preliminary design of GBAS onboard test equipment which can be independently used for the GBAS ground testing and flight testing on a car and an aircraft.

Holistic Scheduling Analysis of a CAN based Body Network System (CAN을 이용한 차체 네트웍 시스템에 대한 Holistic 스케줄링 해석)

  • 신민석;이우택;선우명호
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.10 no.5
    • /
    • pp.114-120
    • /
    • 2002
  • In a distributed real-time control system, it is essential to confirm the timing behavior of all tasks because these tasks of each real-time controller have to finish their processes within the specified time intervals called a deadline. In order to satisfy this objective, the timing analysis of a distributed real-time system such as shcedulability test must be performed during the system design phase. In this study, a simple application of CAN fur a vehicle body network system is formulated to apply to a holistic scheduling analysis, and the worst-case execution time (WCET) and the worst-case end-to-end response time (WCRT) are evaluated in the point of holistic system view.