• 제목/요약/키워드: Time progress

Search Result 2,165, Processing Time 0.027 seconds

A Study on the Influence of Digital Space on 'Becoming' Real Space (디지털공간의 현실공간의 '생성(becoming)'에 미치는 영향에 관한 연구)

  • Yoon, Jae-Eun
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.5
    • /
    • pp.126-133
    • /
    • 2007
  • This study is intended to set the concept of becoming meaning of digital space through digital technology and to study the influence of digital space on becoming of real space through derived keyword. The results of this study are summarized as follows. First, the digital concept is created in the process that the virtual space is changed into the real space with a priority given to form, space and time. Digital expression concept and image concept the structural becoming, and idea concept and creative concept creates the time becoming. Second, the concept of digital becoming exposes a physical visibility through the digital's virtual image, and non-space spatiality through the space simulation. It also continuously reveals a consecutive time and non-consecutive time through a statable progress, incremental progress, and dynamic progress. Third, as the influence of digital on becoming of real space, the digital visibly not only expresses the new and difficult becoming problem through conceptual virtuality, but also can review the real space's space concept with virtuality in the digital non-area. Digital's durability expresses the new space's existence by physically combining with the existing space through the virtual form creation.

Economic Effect of Competition in the Korean IT Service Industry (정보통신서비스산업에서 경쟁도입의 경제적 효과 분석)

  • Cho Sang-Sup;Min Wan-Kee;Jang Song-Ja
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1157-1174
    • /
    • 2005
  • This paper aims at examining the disembodied technological progress in the Korean IT service industry, on the assumption that competition leads to the disembodied technological progress. Hobijn model (2000) which abstracts the disembodied technological progress from the total technological progress and Bai et al. Model (1998, 2003) which identifies time of the technological structural change are used for empirical study. The empirical analysis indicates the major structural change in the pattern of the disembodied technology progress occurred after 1995 in the Korean IT service industry. This means that policies for the introduction of competition system and the industry promotion around 1995 have a positive effect on the development of the Korean IT service industry.

  • PDF

Analysis of accidents due to Urban Ground Excavation (지반굴착공사로 인한 사고사례 분석)

  • Seong, Joo-Hyun;Yoon, Jong-Ku;Jung, Soo-Hyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1087-1094
    • /
    • 2010
  • With recent growth of population and industry, urban development grows into grand scheme of excavation and construction in urban area. As the development progress advanced, the developments get large and deepen. With a progress of technology development in geotechnical engineering in Korea, most our grand scheme of projects follows great progress. On the other hand, some excavation in construction site caused direct or indirect event that affects the adjacent or surrounding structures by excavation from time to time. This event usually happens around residential and commercial area where underground tunnel, subway station, commercial building, and high-rises excavation site is, could lead great damage on economy as well as personal injury or human casualties. In order to prevent this event, the study has to be done with analysis on various events of excavation and its cause. In this paper, the research has collected the various excavation events and their causes to analyze on each site and event to define emphasis on surrounding environment.

  • PDF

The Characteristics of Frequency Spectrum of the radiated Electromagnetic Waves with AC Discharge Progress in Air (대기중 교류 방전진전에 따른 방사전자파의 주파수 스펙트럼 특성)

  • 박광서;최병주;김기채;김이국;이광식
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.2
    • /
    • pp.81-87
    • /
    • 2003
  • This paper simulated discharge progress and partial discharge using needle-plan electrode system in air, in this time with discharge progress, studied the distribution of frequency spectrum of the radiated electromagnetic waves using biconical antenna and spectrum analyzer. From results of this study, a method was introduced for measurement and analyzation of the radiated electromagnetic waves in accordance with AC discharge progress in air, Besides, according to the consideration of the mutual relation between frequency spectrum of the radiated electromagnetic waves and discharge progress, it was confirmed that detecting partial discharge and estimating discharge progress were possible.

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

기후요소를 활용한 철골공사기간 예측 시스템에 관한 연구 - 실시간 진도관리 시스템 적용을 중심으로 -

  • Park, Jung-Lo;Yoo, Seung Kyu;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.213-217
    • /
    • 2009
  • Weather factors affect cost increases and progress management under construction. Because progress schedule is delayed by weather factors, the construction costs are increased. It is an essential element to control the progress schedule applying weather factors to the progress management. This study applies monthly working-day percentages which is estimated by databases of past weather information to RTPM system. Through do progress management in construction projects exactly, will try to minimize risk of process control that do that is to weather factors. Also, will compare calamity in safety supervision side that do that is to weather factors beforehand. Based on the factors and the expected impact of factors together with the weather data during the last 50 years in Seoul region gathered from Korea. Through it, calculated number of month working day of RCA's structural steel work. Studied way that apply to RTPM system.

  • PDF

3D WALK-THROUGH ENVIRONMENTAL MODEL FOR VISUALIZATION OF INTERIOR CONSTRUCTION PROGRESS MONITORING

  • Seungjun Roh;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.920-927
    • /
    • 2009
  • Many schedule delays and cost overruns in interior construction are caused by a lack of understanding in detailed and complicated interior works. To minimize these potential impacts in interior construction, a systematic approach for project managers to detect discrepancies at early stages and take corrective action through use of visualized data is required. This systematic implementation is still challenging: monitoring is time-consuming due to the significant amount of as-built data that needs to be collected and evaluated; and current interior construction progress reports have visual limitations in providing spatial context and in representing the complexities of interior components. To overcome these issues, this research focuses on visualization and computer vision techniques representing interior construction progress with photographs. The as-planned 3D models and as-built photographs are visualized in a 3D walk-through model. Within such an environment, the as-built interior construction elements are detected through computer vision techniques to automatically extract the progress data linked with Building Information Modeling (BIM). This allows a comparison between the as-planned model and as-built elements to be used for the representation of interior construction progress by superimposing over a 3D environment. This paper presents the process of representing and detecting interior construction components and the results for an ongoing construction project. This paper discusses implementation and future potential enhancement of these techniques in construction.

  • PDF

A Study on the Histopathological Changes of Experimental Bite-marks with the Progress of Time (실험교흔조직의 수상 후 경과시간에 따른 병리조직학적 변화에 관한 연구)

  • 윤창륙;김종열
    • Journal of Oral Medicine and Pain
    • /
    • v.10 no.1
    • /
    • pp.41-52
    • /
    • 1985
  • In order to observe the histopathological changes with the progress of time after formation of bite-mark, experimental bite-marks were made in female rats and histopathological examinations were performed in the given sites immediately, 5 minutes, 10 minutes, 30 minutes, I hr., 4 hrs., 8 hrs., 12 hrs., 24 hrs., and 48 hrs, after injury. Results and Summary 1. Subcutaneous loose connective tissues and fatty layers were compressed immediately after formation of bite-marks, injured epithelia showed hydropic degeneration 5 minutes later. 2. Inflammatory cells emigrated into tissues with hemorrhages in the tissues after 10 minutes, and more increased centered around the blood vessels.- These distributed most densely in the tissues, after 12 hrs., thereafter, were decreased and distributed in various groups of crowdy appearances, after 48 hrs. 3. After 10 minutes, neutrophils emigrated into tissues and disappeared gradually with an appearance of monocytes. These disappeared completely, after 24 hrs. Lymphocytes and plasma cells were see n at 48 hrs. later. 4. Adherence of mast cells to injured sites occurred immediately, and which adhered to blood vessel walls of injured sites, after 10 minutes. 8 hrs. later, degranulation in emigrated inflammatory cells showed, and these degranulation disappeared gradually with a progress of time.

  • PDF

Development of Telepresence System for Schedule Management in Railway Construction Project (철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Park, Jin-Jung;Moon, Hyoun-Seok;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.23-30
    • /
    • 2010
  • In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner