• Title/Summary/Keyword: Time measurement

Search Result 9,282, Processing Time 0.039 seconds

Automatic Measurement of Temperature in Real Time by Using an Internal and Data Processing System (인터넷을 이용한 원격 실시간 온도 계측 모니터 및 계측데이터 자동처리 시스템)

  • Kim, Hui-Sik;Kim, Yeong-Il;Seol, Dae-Yeon;Nam, Cheol;O, Heung-Il
    • Proceedings of the KIEE Conference
    • /
    • 2003.11b
    • /
    • pp.99-102
    • /
    • 2003
  • In this paper, we have developed a system for monitoring and processing the real time sensor data in remote site through Internet. For realizing this system, measurement equipment and protocol are used to transmit the measurement data to remote server and to process measurement data. In server part, the received data from remote site sensor is converted to text or graphic charts for user. The measurement device in sensor part receives the sensor data form sensor and store the received data to its internal memory for transmitting data to server part through Internet. Also the measurement device can receive data form server. The temperature sensor is corrected to the measurement device located in laboratory and the measurement device measures temperature of laboratory which can be confirmed by user through Internet. We have developed a server program working on the Linux to store measurement data from measurement device to server memory. The program is use for SNMP(Simple Network Management Protocol) to exchange data with measurement device. Also the program changes the measurement data into text and graphic charts for user display. The program is use apache PHP program for user display and inquiry. The real time temperature measurement system can be applly for many parts of industry and living.

  • PDF

Development of automatic measurement system for dynamic respose time of pneumatic solenoid valve (공압밸브의 동적응답 특성측정 자동화 시스템 개발)

  • 강보식;김형의
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1991.10a
    • /
    • pp.974-978
    • /
    • 1991
  • Electro-pneumatic valve is an electro-mechanical device which converts electric signal into pneumatic flow mu or pressure. A measurement of dynamic response time is very important to evaluate valve performance. Dynamic response time of electro-pneumatic valve has a variation accordance with valve types, operating way and test standard. In this study, automatic measurement system of dynamic response time is composed based on test condition of dynamic response time test standard(CETOP, JIS). Also, in this study test pressure variation characteristics accordance with variation of solenoid excitation power, and we developed dynamic response measurement system enable to compare of and analyze these two characteristics.

  • PDF

A Study on the Measurement Time-Delay Estimation of Tightly-Coupled GPS/INS system (강결합방식의 GPS/INS 시스템에 대한 측정치 시간지연 추정 연구)

  • Lee, Youn-Seon;Lee, Sang-Jeong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.4
    • /
    • pp.116-123
    • /
    • 2008
  • In this paper we study the performance of the measurement time-delay estimation of tightly-coupled GPS/INS(Global positioning system/Inertial Navigation system) system. Generally, the heading error estimation performance of loosely-coupled GPS/INS system using GPS's Navigation Solution is poor. In the case of tightly-coupled GPS/INS system using pseudo-range and pseudo-range rate, the heading error estimation performance is better. However, the time-delay error on the measurement(pseudo-range rate) make the heading error estimation performance degraded. So that, we propose the time-delay model on the measurement and compose the time-delay estimator. And we confirm that the heading error estimation performance in the case of measurement time-delay existence is similar with the case of no-delay by Monte-Carlo simulation.

A Study of Automatic Measurement using Bluetooth Modem for Railway structures (블루투스 통신모뎀을 이용한 철도구조물의 자동계측에 관한 연구)

  • Lee, Seong-Won;Lee, Keun-Ho;Chung, Jae-Min
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.316-321
    • /
    • 2006
  • The objective of this study is the developement of real time automatic datalogger using bluetooth modem for safety and maintence of civil construction sites. Automatic measurement system using general wireless modem is studied, and data communication method of between personal computer(or Server) and automatic measurement data is analyzed. Therefore data communication method and analyzing program of automatic measurement data is developed using real time automatic datalogger with bluetooth modem. The results of this study will be using real time automatic measurement of civil construction sites

  • PDF

The measurement temperature and analysis used embedded system by internet explorer (인터넷 익스플로러를 통한 임베디드 시스템 기반의 온도 측정 및 분석)

  • 김희식;김영일;설대연;남철
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.1003-1006
    • /
    • 2004
  • In this paper have developed a system for monitoring and processing the real time sensor data in remote site through network. For realizing this system, measurement equipment and protocol are used to transmit the measurement data to remote server and to process measurement data. In server part, the received data from remote site sensor is converted to text or graphic charts for user. The measurement device in sensor part receives the sensor data form sensor and store the received data to its internal memory for transmitting data to server part through Internet. Also the measurement device can receive data form server. The temperature sensor is connected to the measurement device located in laboratory and the measurement device measures temperature of laboratory which can be confirmed by user through Internet. We have developed a server programworking on the Linux to store measurement data from measurement device to server memory. The program is use for SNMP(Simple Network Management Protocol) to exchange data with measurement device. Also the program changes the measurement data into text and graphic charts for user display. The program is use apache PHP program for user display and inquiry. The real time temperature measurement system can be apply for many parts of industry and living.

  • PDF

Compensation Technique of Measurement Time Delay in Transfer Alignment Using the Double Moving Window Buffer (이중 Moving Window 버퍼 기반 전달정렬 측정치 시간지연 보상기법)

  • Kim, Cheon-Joong;Lyou, Joon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.4
    • /
    • pp.684-693
    • /
    • 2011
  • Measurement time delay in the transfer alignment is very important. It has been well known that the time delay degrades the alignment performance and makes some navigation errors on the transfer alignment of slave INS(SINS). Therefore there are many schemes to eliminate that time delay but the compensation technique through the estimation by Kalman filter through modeling the time delay as a random constant is generally used. In the case of change over measurement time delay or the large measurement time delay, estimation performance in the existing compensation technique is degraded because model of time delay is not correct any more. In this paper, we propose the method to keep the time delay almost constant even though in the abnormal communication state and very small through feedback compensation using double buffer. Double buffer consists of two moving window to temporarily store measurements from master INS and slave INS in real time.

Work analysis of route survey work on forest-road (임도 노선측량 작업의 작업분석)

  • Kweon, Hyeong-Keon;Lee, Joon-Woo;Choi, Sung-Min;Yeom, In-Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.40 no.3
    • /
    • pp.209-214
    • /
    • 2013
  • This study examined the work time, work posture, and work intensity for the actual measurement step in forest road the design work that was being carried out. The measurement of the forest road was being carried by a team of three workers and a team of four workers. The examination of work time found that the measurement of 1km took about 8 hours for the four-worker team and 12 hours for the three-worker team. The examination of work intensity found that the energy metabolic rates of the three-worker team were lower than four-worker team. Because their energy consumption per minute decreased as their work time and rest time increased. Furthermore, when appropriate rest time was applied according to work time, the energy metabolic rate decreased and the work intensity became lower. The four-worker team was more advantageous from the time and cost aspects of the forest road measurement work. Furthermore, as the rest time was very low compared to the work time, more efficient forest road measurement work would be possible if the work intensity was lowered by considering the rest time when calculating the standard work time.

Electrical Life Time Constant Estimation of Ceramic Element for Sensor (센서용 세라믹 소체의 전기적 수명지수 산출)

  • Jeong, Joo-Young;Kang, Dong-Sik;Sun, Jong-Ho;Heo, Jong-Cheol;Choo, Young-Bae;Park, Chung-Hoo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.10
    • /
    • pp.1995-1999
    • /
    • 2009
  • A partial discharge(PD) measurement is a very effective method to assess the insulation condition of high-voltage machines. It is necessary that the life time of the on-line PD measurement sensor is assessed. Therefore, the electrical life time assessment method of ceramic element was reviewed in order to estimate the life time of the on-line PD measurement sensor. The samples were prepared according to the reviewed method and were tested at 8kV, 9kV and 10kV. Based on the obtained results, the life time constant is shown above 59. Also, it is assumed that the estimated life time constant can be used to anticipate the life time and to assess the conformity of the on-line PD measurement sensor.

Standard Measurement Procedure for Soil Radon Exhalation Rate and Its Uncertainty

  • Seo, Jihye;Nirwono, Muttaqin Margo;Park, Seong Jin;Lee, Sang Hoon
    • Journal of Radiation Protection and Research
    • /
    • v.43 no.1
    • /
    • pp.29-38
    • /
    • 2018
  • Background: Radon contributing about 42% of annual average dose, mainly comes from soil. In this paper, standard measurement procedures for soil radon exhalation rate are suggested and their measurement uncertainties are analyzed. Materials and Methods: We used accumulation method for estimating surface exhalation rate. The closed-loop measurement system was made up with a RAD7 detector and a surface chamber. Radon activity concentrations in the system were observed as a function of time, with data collection of 5 and 15-minute and the measurement time of 4 hours. Linear and exponential fittings were used to obtain radon exhalation rates from observed data. Standard deviations of measurement uncertainties for two approaches were estimated using usual propagation rules. Results and Discussion: The exhalation rates (E) from linear approach, with 30 minutes measurement time were $44.8-48.6mBq{\cdot}m^{-2} {\cdot}s^{-1}$ or $2.14-2.32atom{\cdot}cm^{-2}{\cdot}s^{-1}$ with relative measurement uncertainty of about 10%. The contributions of fitting parameter A, volume (V) and surface (S) to the estimated measurement uncertainty of E were 59.8%, 30.1% and 10.1%, in average respectively. In exponential fitting, at 3-hour measurement we had E ranged of $51.6-69.2mBq{\cdot}m^{-2} {\cdot}s^{-1}$ or $2.46-3.30atom{\cdot}cm^{-2}{\cdot}s^{-1}$ with about 15% relative uncertainty. Fitting with 4-hour measurement resulted E about $51.3-68.2mBq{\cdot}m^{-2} {\cdot}s^{-1}$ or $2.45-3.25atom{\cdot}cm^{-2}{\cdot}s^{-1}$ with 10% relative uncertainty. The uncertainty contributions in exponential approach were 75.1%, 13.4%, 8.7%, and 2.9% for total decay constant k, fitting parameter B, V, and S, respectively. Conclusion: In obtaining exhalation rates, the linear approach is easy to apply, but by saturation feature of radon concentrations, the slope tends to decrease away from the expected slope for extended measurement time. For linear approach, measurement time of 1-hour or less was suggested. For exponential approach, the obtained exhalation rates showed similar values for any measurement time, but measurement time of 3-hour or more was suggested for about 10% relative uncertainty.

TCE Exposure Assessment of Cleaning Workers (세척공정의 트리클로로에틸렌 TWA 및 STEL 평가 사례)

  • Hyun Soo Kim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.1
    • /
    • pp.3-5
    • /
    • 2023
  • Objective: This study introduces exposure concentrations of time-weighted average standard (TWA) evaluation and short-time exposure standard (STEL) evaluation for trichloroethylene in the cleaning process. Methods: Trichloroethylene measurement was conducted according to the KOSHA Guide (A-24-2019) method. It was carried out twice. Results: As a result of the first measurement, TWA concentration exceeded 4 times the exposure standard and STEL concentration exceeded 16 times, but the inaccuracy and breakthrough of the collection time could not be considered, so the second measurement was conducted. The second measurement result was lower than the first measurement result, but exceeded the exposure standards (TWA, STEL). Conclusions: We were able to confirm that the exposure level of workers in the cleaning process using trichloroethylene exceeded the exposure standard. And it is also considered necessary to grasp the approximate concentration using a detector tube in the preliminary survey.