• 제목/요약/키워드: Time Shortening

검색결과 664건 처리시간 0.026초

초고층 구조물에서 기둥축소에 대한 시공기간의 영향에 관한 연구 (A Study on the Effect of Construction Time in the Column Shortening in High-Rise Building)

  • 정은호;김희철
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1996년도 가을 학술발표회 논문집
    • /
    • pp.267-274
    • /
    • 1996
  • Differential shortening of vertical members in high-rise buildings affect other structural members that have to be considered such as horizontal members and exterior cladding. of many elements which affect the total amount of shortening, different loading history mainly comes from the different construction time. Shortening of 66 story concrete columns were investigated and compared according to the different construction time, little difference was found between the total shortening of interior and that of exterior column.

  • PDF

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • 토지주택연구
    • /
    • 제2권4호
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

결합재 및 혼화제를 사용한 조강 콘크리트의 거푸집 탈형 시기 분석 (Analysis on Stripping Time of Form of High-Early-Strength Concrete Incorporating Binder and Admixture)

  • 전명훈;방종대;이범식;박성식;박지영;조건희
    • 토지주택연구
    • /
    • 제4권2호
    • /
    • pp.193-200
    • /
    • 2013
  • 건설공사에서 공기는 매우 중요한 요소로 건설사업비에 미치는 영향이 크다. 선진국들은 공기단축을 통해 건설사업비를 줄이고 있다. 국내 건설업체들도 공기단축을 위해 많은 노력을 기울이고 있지만, 공기단축 방법을 체계적으로 제시하지 못하고 있다. 일반적으로 골조공사의 공기는 거푸집의 존치기간에 영향을 받기 때문에 공기단축을 위해서는 거푸집의 존치기간을 단축해야 한다. 본 연구에서는 거푸집의 존치기간을 단축하기 위해 다양한 조건들의 조강콘크리트를 만들어서 압축강도 실험을 실시하였다. 이를 통해 거푸집의 탈형 시기를 제안하였다. 연구결과에 의하면 골조공사에 조강콘크리트를 사용하면 거푸집의 존치기간을 상당히 단축할 수 있는 것으로 나타났다. 본 연구결과들은 골조공사의 공기단축을 도모할 때 유용하게 활용될 수 있을 것이다.

냉동탕수육의 튀김횟수에 따른 튀김유지와 산화안정성 (Effects of Reusing Times on the Oxidative Stability of Frying Fat for Frozen Battered Pork)

  • 이현규;이주영;송은승
    • 한국식품영양과학회지
    • /
    • 제29권2호
    • /
    • pp.231-234
    • /
    • 2000
  • 시판 탕수육을 대두유와 shortening으로 연속적으로 사용하여 튀긴 후 탕수육의 이화학적 및 관능적 변화와 튀김유의 이화학적 변화를 측정하여 이를 통한 한계 사용 횟수를 예측하고자 하였다. 튀김유의 TBA값은 대두유가 shortening보다 사용횟수에 따른 증가가 뚜렷하였으나, 탕수육의 경우에는 반대로 shortening을 사용한 탕수육이 대두유로 튀긴 탕수육보다 증가율이 높게 나타났다. 튀김횟수 증가에 따른 튀김유의 산가와 과산화물가는 증가하였으며 shortening에서 과산화물가의 변화가 크게 나타났다. 대두유로 튀긴 탕수육의 TBA값과 가장 상관 관계가 높은 풍미를 선정하여 한계사용횟수를 구한 결과 약 9회로 나타났고, shortening으로 튀긴 탕수육의 TEA 값과 가장 상관관계가 높은 인자인 조직감을 선정하여 한계 사용횟수를 측정한 결과 약8회로 나타났다. 대우유와 shortening의 한계사용횟수를 예측하기 위해 식품공전에 규정된 산가를 회귀방정식에 대입한 결과 두 기름 모두 약 8회로 나타나 위의 결과와 비슷한 한계사용횟수를 나타났다.

  • PDF

아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로- (Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor-)

  • 한충희;방종대
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.87-96
    • /
    • 2004
  • 건설공사에서 공기는 매우 중요한 요소로 건설사업비에 미치는 영향이 크다. 선진국들은 공기단축을 통한 건설사업비 절감을 위해 노력하고 있다. 국내에서도 공기단축의 필요성을 절감함으로써 공기단축을 위해 많은 노력을 기울여 왔지만, 그 효과는 아직 미미한 것으로 나타나고 있다. 향후 주 5일 근무제가 시행되고, 후분양제가 도입될 경우, 건설사업비 절감이나 리스크 관리측면에서 공기단축은 필수불가결한 요인이 될 것이다. 공기를 효과적으로 단축하기 위해서는 공기에 영향을 미치는 중요요인과 공정 메커니즘을 명확하게 분석해야 한다. 이러한 사항들이 규명될 때 효과적인 공기단축이 가능해져 건설사업비를 줄일 수 있게 될 것이다. 이에 본 연구에서는 아파트 건설공사에서 공기의 $40\sim50\%$를 차지하는 골조공사의 기준층에 대한 공정메커니즘을 분석하여 골조공사의 공기에 영향을 미치는 요인들을 규명하고자 한다. 또한, 도출된 요인들을 효과적으로 활용할 수 있는 방법들을 사례 분석함으로써 합리적인 공기단축방안을 제시하고자 한다.

A Comparison of Shortening and Shortening Speed in Sartorius, Gastrocnemius and Rectus Abdominis Muscles of Uromastix hardwickii

  • Fehmeena, S.;Azeem, M. Abdul
    • The Korean Journal of Physiology
    • /
    • 제28권1호
    • /
    • pp.61-70
    • /
    • 1994
  • A new method is used to record the actual shortening produced during the auxotonic activity of the sartorius (SAR), gastrocnemius (CAS) and rectus abdominis (RAB) muscles of a lizard Uromastix. The auxotonic twitch and tetanus records thus obtained were used for the first time to calculate the coefficient of linear shortening (COLS). This coefficient represent the relative Index between change in length $(\Delta\;L=L_0-L_1)$ and tension $({\Delta}P\;P_0-P_1)$ due to shortening at the steepest rising phase of the twitch and tetanus, recorded at resting length. In addition to this, maximum shortening $(S_{max})$ and auxotonic tensions were also determined at resting lengths of these muscles. The COLS was found to express the speed of shortening and auxotonic tensions are suggested to be of value to express the internal architecture of SAR, GAS & RAB muscles. The results are discussed in terms of contractile and elastic elements of the muscles alongwith the importance of shortening at resting lengths in skeletal muscles.

  • PDF

Effect of Outriggers on Differential Column Shortening in Tall Buildings

  • Kim, Han-Soo
    • 국제초고층학회논문집
    • /
    • 제6권1호
    • /
    • pp.91-99
    • /
    • 2017
  • Special consideration should be given to differential column shortening during the design and construction of a tall building to mitigate the adverse effects caused by such shortening. The effects of the outrigger - which is conventionally used to increase the lateral stiffness of a tall building - on the differential shortening are investigated in this study. Three analysis models, a constant-section, constant-stress, and general model, are prepared, and the differential shortenings of these models with and without the outrigger are compared. The effects of connection time, sectional area, and location of the outrigger on the differential shortening are studied. The sectional area of the outrigger shows a non-linear relation in reducing the maximum differential shortening. The optimum locations of the single and dual outriggers are investigated by an exhaustive search method, and it is confirmed that a global optimum location exists. This study shows that the outrigger can be utilized to reduce the differential shortening between the interior core wall and the perimeter columns as well as to reduce the lateral displacements due to wind or earthquake loads.

SDD 기반 OFDMA 시스템을 위한 간섭 완화 기법 (Mitigating Techniques for OFDMA System Based on SDD)

  • 박창환;고요한;김무철;박경원;전원기;백종호;이석필;조용수
    • 한국통신학회논문지
    • /
    • 제34권8C호
    • /
    • pp.742-749
    • /
    • 2009
  • 본 논문에서는 옥내환경의 무선전송을 위한 SDD(Synchronous Digital Duplexing)/OFDMA (Orthogonal Frequency Division Multiple Access) 시스템에서 AP(Access Point)와 SS(Subscriber Station)의 TDoA(Time Difference of Arrival)와 CFO(Carrier Frequency Offset)에 의해 발생하는 상 하향링크 OFDM 심볼의 IBI(Inter Block Interference)와 ICI(Inter Carrier Interference)의 영향을 극복하기 위한 TSF(Time-domain Shortening Filter)와 FSF(Frequency-domain Shortening Filter)를 제안한다. 제안된 TSF와 FSF는 상호 레인정 과정에서 획득한 AP와 각 SS 에 대한 채널응답 및 동기 정보를 이용하여, 시간영역과 주파수영역에서 SIRST(SIR for Shortening in Time)와 SINRSF(SINR for Shortening in Frequency)를 최대화한다. 제안된 TSF와 FSF는 SDD/OFDMA 시스템에서 TDoA에 따른 effective 채널응답과 CFO에 따른 ICI의 영향을 효과적으로 감쇄시키는 것을 모의실험을 통하여 확인한다.

37층 초고층주상복합건물 SRC기둥의 기둥축소량 현장계측 및 보정법 (Field Measurement and Compensation Method of Column Shortening for SRC Columns in 37-story Residential Building)

  • 송화철;도근영;조훈희
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.145-152
    • /
    • 2005
  • Long-term axial shortening of the vertical elements of tail buildings results in differential movements between two elements and may lead to the additional moments of connection beam and slab elements, and other secondary effects, such as cracks of partitions or curtain walls. Accurate prediction of time-dependent column shortening is essential for tall buildings from both strength and serviceability aspects. The compensation method is different from reinforced concrete and SRC(Steel Reinforced Concrete) members. The SRC columns are usually compensated according to total differential shortening between two vertical elements. In this study, column shortenings of 37-story W building under construction are predicted and compensated. The SRC column shortenings are compared with the actual column shortening by field measurement and the column shortenings are reanalysed and recompensated.

전이층을 가진 초고층건물의 기둥축소량 예측 및 현장계측 (Column Shortening prediction and Field measurement of Tall building with Transfer floor)

  • 송화철;조용수;정성진;윤광섭;이우호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2006년도 정기 학술대회 논문집
    • /
    • pp.175-181
    • /
    • 2006
  • The prediction of time-dependent column shortening is essential for tall buildings considering both strength and serviceability aspects. The Column shortening of tall buildings with transfer floor should be calculated considering the long-term deflection of transfer girder. In this study, both the column shortening and the deflection of transfer girder of 45-story tall concrete building are predicted. The column shortening considering deflection of transfer girder are compared with the actual column shortening by field measurement.

  • PDF