• Title/Summary/Keyword: The maintenance and management of tunnel

Search Result 64, Processing Time 0.024 seconds

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

Development of Tunnel Management Database System for Korea National Railways (철도 터널 유지관리 데이타베이스 시스템 개발)

  • 황희수;홍선호;박지원;양재성
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.111-118
    • /
    • 1998
  • This paper describes the development of the database system for tunnel management of Korea National Railways. In order to make the system both target independent and accessible by KNR network or modem, authors developed the system as a web-based application using java language and IBM DB2 database. The system includes the searching, reporting, graphical representation and statistical functions for tunnel data, maintenance records and checking records. Later, the system will be extended to include the process for tunnel state rating and maintenace prioritiy decision-making.

  • PDF

Establishment of Maintenance and Monitoring Standards for Shield and TBM Tunnels (Shield 및 TBM 터널의 유지관리계측 관리기준 설정에 관한 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.1-12
    • /
    • 2024
  • Purpose: The objective of this study was to improve the tunnel maintenance and monitoring technology by establishing the maintenance, management, and monitoring standards for shield and TBM tunnels, which had been applied more in recent years. Method: This study comprehensively analyzed and compared the data and model simulations of Seoul Subway Lines 7 and 9 and Bundang Line, shield and TBM tunnels in South Korea, tunnels in France and Japan, and Channel Tunnel in the UK. Result: This study set maintenance and monitoring standards when there was no design estimate based on numerical analyses such as section design and section analysis regarding the maintenance and monitoring section of shield and TBM tunnels. Conclusion: It is necessary to determine safety by comprehensively considering not only each monitoring item but also the changing trend and correlation of all items and compensation of the tunnel.

A study on the maintenance methods of the multi-purpose double-deck tunnel (다목적 터널의 기능별 유지관리 방법에 대한 고찰)

  • Moon, Hoon-Ki;Song, In-Cheol;Kim, Jae-Won;Lee, Hye-Yoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.1
    • /
    • pp.83-93
    • /
    • 2017
  • Recently, the development of multi-purpose tunnel that has functions of roads and waterways has been attention for efficient utilization of underground space. However, there is no study on the multi-functional tunnels behavior for the convert of iterative function and change of water pressure. In this study, the vulnerable section was analyzed due to repeated functional change. A basic review was implemented for the operation of the multi-purpose double-deck tunnel. Also, the vulnerable section for convert of iterative function of multi-functional tunnel has been analyzed by simulation. Management of multi-functional tunnel should considered in various analyzed and some problems. The criteria for management of multi-functional tunnels is proposed.

Achievements and Tasks of the SMRT Tunnel Monitoring System(TMS) (서울도시철도공사 터널모니터링 시스템의 운영성과와 과제)

  • Park, Jong-Hun;Kim, Man-Hwa;Park, Ki-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.381-387
    • /
    • 2012
  • This paper is aimed to analyze the achievements of the Tunnel Monitoring System(TMS), implemented in Seoul subway L5~L8, and to find out improved methods. By introducing the TMS, it is possible to inspect tunnel facilities for 24 hours a day while trains are operated. The inspection capability could be expanded, the accuracy was improved, and the cycle was shortened. The efficiency of manpower was improved and the surplus manpower could be used for other tasks of facilities maintenance. As a result, by introduction of the TMS, the amount of tunnel maintenance was increased by 225% and the train service troubles caused by facility problems were decreased by 53%.

A Study on the Standardization of Operation System for Road Tunnels (터널운영시스템 표준화 연구)

  • Kim, Tae-Hyung;Kim, Jin;Keum, Jae-Sung;Tae, Jae-Ho;Kim, Sun-Hong;Hong, Dae-Hie
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.75-79
    • /
    • 2008
  • Since tunnel construction order was placed one by one, various sensors and actuators installed at the RTU and higher level system in each tunnel maintenance office had their own protocols depending on construction company. The TGMS testbed established on the extended region of Yong-dong Highway, for example, did not have consistent protocol between each automation levels and management levels without considering the functions and/or roles of each level. The management sever in each tunnel was simply networked to the TGMS server. Therefore, it is impossible to implement a new control algorithm as well as to integrate each other since each tunnel was constructed by different company. So, if the construction company is out of business, there is no way to maintain the corresponding tunnel effectively. In order to solve this problem, all the necessary standard protocols was established between automation level and management levels. These interface standards provide the clear classification between individual tunnel system and tunnel management system. So, even if construction company is different, its effect is minimized, so that it is expected to successfully establish PC based TGMS.

  • PDF

A Study on Characteristics of Maintenance and Standarization Plan Concerned with DB of Retainging Wall (옹벽 구조물의 표준 DB화 방안 및 유지관리 특성 연구)

  • Lee, Song;Shim, Min-Bo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.4
    • /
    • pp.129-140
    • /
    • 2000
  • Retaining wall is a constructed structure in order to construct road, rail, building for effective use and obtainments of the limited ground. Recently, many kinds of research have been actively developed for a standardization and information to the maintenance and management of bridge, tunnel, road. With the works of database construction of that, many kinds of data with respect to statistics is cumulated. Database work of retaining wall is wholly lacking and lagged behind in the works of database construction. This paper suggests classification system on inspection data. On the basis of that, code work with classification system was practised and DB program of inspection data of retaining wall was developed. And input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on retaining wall.

  • PDF

A Life Cycle Cost Comparison of Low-pressure Sodium Lamp and Fluorescent Lamp for Tunnel Lighting

  • Lee, Young-Q.
    • Industrial Engineering and Management Systems
    • /
    • v.3 no.1
    • /
    • pp.59-62
    • /
    • 2004
  • The number of tunnel has fast increased with the rapid expansion of highway network. Tunnel should be designed to provide for drivers both safety and pleasant driving conditions. In this perspective, the design for tunnel lightning is very important in order to provide its safety, pleasantness, and cost-efficiency of maintenance, all of which should be considered and analyzed for a better tunnel lighting. This paper attempts to compare the low-pressure sodium lamp, which have usually been used for tunnel lighting, with the fluorescent lamp, which we consider as an alternative for the former. In an effort to determine the number of lamps to meet the required illuminance in the tunnel, this research employs a simulation technique which would allow us to conjecture, with the aid of basic model, the life cycle cost for illumination per each tunnel. This analysis is expected to provide a basic method and related information for tunnel development and design.

A Study of Quality Improvement of the Exterior Inspection Using Tunnel Scanning System (터널스캐닝 시스템을 이용한 외관조사 품질개선에 관한 연구)

  • Jee Kee-Hwan;Chung Jae-Min;Hong Sa-Jang;Kim Su-Un
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.234-239
    • /
    • 2004
  • Recently, the tunnel structures are increasing. And the tunnels are to be large diameter tunnel and long. Therefore, inspection, repair, and maintenance of tunnels are an extremely important part of infrastructure management, with particular technical and safety considerations arising from the very nature of underground construction. To inspect surface state of tunnels, concrete structures, it must generally use method of conventional visual inspection, but this method is very not objective. To measure the width, length, position, direction of a crack, it is very difficult, when the tunnel is long span and high rise. Thus, to make up for this demerits, in this paper is proposed the Tunnel Scanning System that we can check conditions of the tunnel structures quickly, detect the detailed data objectively, count automatically the width of a crack by the original software and follow the trend of long tenn changes in the condition of a tunnel.

  • PDF