In this research, we were going to make the function which can forecast the operating cost of metropolitan railroad that is performing a role of assistant highway within the city. In order to do this, based on service records of subway line 1st to 8th in Seoul, we extracted 23 variables which can affect to the operating cost, and we selected the final variable for estimate the function of operating cost from correlation among variables and influence analysis. Then, we performed regression analysis by stages using final variable. 6 independent variables are chosen for presuming the operating cost, and we obtained the final 3 variables (quantity of holding motor cars, peak quantity of possessed motor cars, and quantity of stations) as a result of regression analysis. Through this research, function of operating cost of metropolitan railroad has better applicability than existing preliminary validity, and it is used by further preliminary validity investigation and master plan or validity investigation which is accompanied by operation designing, thus we expect that it could make a great contribution to the priority order of investment for metropolitan railroad or process of policy decision.
Journal of the Korea Academia-Industrial cooperation Society
/
v.10
no.12
/
pp.3594-3599
/
2009
The train control system used in Gyeongbu-line is classified in ATC, IXL and CTC. The ATC data related to speed and space control for trains are transmitted from wayside to onboard by way of UM71 AF track circuits and BSP Loop. The information transferred by track circuits is composed of operation data which directly influence to the train operation and the information transferred by BSP Loop is used in the section which requires the additional data transmission about the particular track-side environment such as tunnel, hot box detector or insulated section. In this paper, for the BA type turning unit of the UM71 AF track circuits which is mainly used in the linking section of existing and high-speed lines from the opening of the Gyeongbu line till the present, we not only analyze the characteristics of BA but also compare and analyze baseline values and the measured values. With this analysis, we will be able to propose how to solve the problems about operation and maintenance such as track circuit malfunctions of the relevant sections.
The escalating settlements observed in concrete slab tracks pose a significant challenge in Korea, raising concerns about their adverse impact on the safe operation of high-speed railways and the substantial costs involved in restoration. A primary contributor to these settlements is identified as the utilization of rock materials sourced from tunnel construction, incorporated into the lower subgrade without the requisite soil mixing to achieve an appropriate particle size distribution. This study employs numerical analysis to evaluate the efficacy of partial reinforcement in reducing settlements in rock-filled lower subgrades. Column-shaped reinforcement areas strategically positioned at regular intervals in the lower subgrade induce soil arching in the upper subgrade, leading to a concentration of soil loads on the reinforced areas and consequent settlement reduction. The analysis employs finite element methods to investigate the influence of the size, stiffness, and spacing of the reinforced areas on settlement reduction in the lower subgrade. The numerical results guide the formulation of an optimal design approach, proposing a method to determine the minimum spacing required for reinforcements to effectively limit settlements within acceptable bounds. This research contributes valuable insights into addressing the challenges associated with settlement in concrete slab tracks, offering a basis for informed decision-making in railway infrastructure management.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.5
/
pp.131-138
/
2018
In this study, we investigated the trend of technological development in major countries related to the propulsion equipment of railway vehicles. The propulsion system is the main equipment of electric vehicles. A lot of time and investment are required in order to ensure the development of technology. Therefore, developed countries have maximized their effort to develop technologies with safety, reliability, and convenience of maintenance. They have also done their utmost to prevent technology transfer to other countries after the development of new technologies. For example, Toshiba of Japan developed a new 3,300V/1,500 A class IGBT power device, but was reluctant to export it to foreign countries in order to protect this technology. In this study, we analyzed the patents applied for related to propulsion control systems and presented the direction of development during the technical development of these systems. The patent analysis of the core technologies was conducted using the Thomson Innovation DB. We examined the number of patents applied for by country, year and major applicant. As a result of the analysis, it was found that the proportion of patent applications per country was in the order of China, 48%, Europe 16.6%, and the United States 14.9%. The patent situation of the top 10 principal applicants revealed that (the top three were?) ABB 14%, GE 13%, and CRRC 12%. At the same time, we also conducted a qualitative analysis of the level of technical development by evaluating such factors as the influence index, quotation, market securing power and citation. Based on the result of the patent analysis, we presented the direction of technical development of the propulsion control equipment of railway vehicles. Based on the analysis results, it was found that domestic applicants considerably reduced their efforts to protect their patents from foreign companies. Nowadays, most of the electric motors used in Korea are induction motors. In advanced countries, permanent magnet electric motors are employed in new railway lines. Therefore, intensive investment is needed in new developments.
Kim, Hyunwoong;Moon, Daeseop;Moon, Jungwook;Kim, Mirye;Lee, Jinsun
Journal of the Korean Society for Railway
/
v.17
no.1
/
pp.79-85
/
2014
This paper presents an evaluation method that considers the weights of many characteristics of a public transportation system; this method facilitates the selection of suitable advanced transit system in a transportation investment plan. The method sets up twelve evaluation items separated by the following influence factors: users, community, government and operators. It then evaluates the advanced transportation system by analyzing the weights. For an empirical analysis, the urban advanced transportation systems for the main transit of small and medium sized cities were evaluated using the AHP method. The result revealed that the weight order is safety, rapidity and punctuality, convenience, and regional activation, and the priority order is steel wheel-type AGT, LIM, and rubber wheel-type AGT.
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.1
/
pp.411-417
/
2013
The moment responses of electric pole foundations for a railroad were investigated using real-scale load tests. Large overturning moments were applied to two square rigid piles with a 1.1 m width and a 2.2 m embedded depth. Two different installation methods-with and without a form-were applied to evaluate the influence of the form work on the moment capacities of the foundations. The reduction of ground strength caused by the excavation without a form is more pronounce than the decrease of frictional strength due to the smooth concrete surface with a form. From the test results, it is found that the current design method which applies a proportional coefficient to consider the effect of a form work is not appropriate. When the normal and frictional stressed is considered separately, the effect of a form work can be estimated reasonably by reducing the friction angle between soil and foundation by 20%.
The moment responses of electric pole foundations for a railway were investigated using real-scale load tests. Large overturning moments were applied to two circular rigid piles with a 0.75 m diameter and a 2.5 m embedded depth; the circular rigid piles were installed in an actual railway embankment fill. Two different loading directions-toward the fill slope and toward the track -were applied to evaluate the influence of the fill slope on the moment capacities of the foundations. It was found that the failure of the foundations that were constructed according to Korean railway practices exhibited a sudden overturning pattern without any significant pre-failure displacement. The moment capacity toward the fill slope was less than the moment capacity toward the track by 30%. From the test results, the geometry factor (K), which accounted for the reduction of the moment capacity, due to the fill slope, was 0.7. Moment capacities determined from the load tests were compared with those predicted from three existing design methods, and their applicability was discussed.
Kim, Yong-Won;Eom, Beom-Gyu;Kang, Bu-Byoung;Lee, Hi-Sung
Transactions of the Korean Society of Mechanical Engineers A
/
v.35
no.8
/
pp.941-949
/
2011
When a railway vehicle passes through curves & transitions, the running speed must be improved by setting limits on the maximum running speed in each section of the conventional line(Dongdaegoo-Namsunghyun) considering derailment safety. Our goal is to improve the maximum running speed of railway vehicle that passes through curves & transitions where there is a high risk of derailment. We examined the influence on the derailment safety when the railway vehicle passes through curves of actual track conditions (Dongdaegoo-Namsunghyun up and down lines). We performed the derailment safety analysis by increasing the running speed on curve radius by 5%.20% compared to existing speed under actual track conditions.
Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.145-152
/
2005
Landslides triggered by rainfall produces severe effects on the serviceability and stability of railway operation. Since small amount of soil mass slipped on the rail can cause derailment which will cause severe danger on the human and trains, slope stability problem is one of the major concerns on the operation of railway. In this study we investigate the some of characteristics of rainfall driven landslide near railroad. A total of 23 sites were visited. From the results four types of landslides based upon the morphology of the slipped slope triggered by rainfall were classified. From the analysis dimensions of slopes (height, length and slope) do not show particular correlation with the types of landslides. In addition, morphological and geological features of slope influence on the occurrence of different types of landslides.
Journal of the Korean Society for Precision Engineering
/
v.28
no.5
/
pp.572-577
/
2011
Curve squealing of inter-city railway vehicle is a noise with high acoustic pressure and rather narrow frequency spectra. This noise turns out to be very annoying for the people living in the neighborhood of locations and the passenger in railway vehicle where this phenomenon occurs. Squealing is caused by a self-exited stick-slip oscillation in the wheel-rail contact. Curve squeal noise of railway vehicles that passed by a factor of the speed limit, so to overcome in order to improve running performance is one of the largest technology. In the present paper, characteristic of squeal noise behavior at the Hanvit-200 tilting train test-site. Curve squealing of railway wheels/rail contact occurs in R400~ R800 curves with a frequency range of about 4~11 kHz. If the curve is less than the radius of wheel frail contact due to |left-right| noise level difference (dBA) shows a significant effect of squeal noise were more likely.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.