There is a growing interest in hybrid electric vehicles due to environmental concerns. Recent efforts are directed toward developing an improved main component systems for the hybrid electric vehicle applications. Soon after the introduction of electric starter for internal combustion engine early this century, despite being energy efficient and nonpolluting, electric vehicle lost the battle completly to internal combustion engine due to its limited range and inferior performance. Hybrid Electric vehicles offer the most promising solutions to reduce the emission of vehicles. This paper describes a method for cost reduction estimation of parallel hybrid electric vehicle. We used a cost reduction structure that consisted of five major subsystems (three-type and two-type motor) for parallel hybrid electric vehicle. Especially, we estimated the potential for cost reductions in parallel hybrid electric vehicle as a function of time using the learning curve. Also, we estimated the potentials of cost by depreciation.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.157-161
/
2011
BIM having started from architecture is being used in civil structure, but there are very few examples despite its effectiveness. In this paper, based on BIM technology, it is presented the method and result of developing web-based 5D system connecting cost, schedule and 3D model from the cable-stayed bridge. Through the system, the user can understand easily schedule on specific time and during some period and extract cost directly. This system also can manage various data types such as drawings, 3D models, documents and photos, for enhanced communication between stakeholders.
The purpose of this research is to propose an approximate estimation system for Modernized Hanok. Mock-up (Jisinjae) site data has been collected and analysed to characterize the modernized Hanok and to examine the range of cost fluctuation rate with each work items. As a result, number of floor, area (㎥), shape, methods and materials were considered as key factors for price change on the total construction cost. Furthermore, wood structure (34%) and roof (17%) account for major cost percentage. The cost fluctuation rate of two factors were -3.3%~+5.6% (wood structure) and -4.1%~+4.2% (roof). For further research, existing method will be analysed in order to developing the Hanok estimation system. And the cost fluctuation rate of every work items will be continually evaluated.
공공아파트 프로젝트의 기획단계에서 수행되는 적정 공사비 예측은 기획부터 유지관리까지 전(全) 단계에 걸쳐서 영향을 미치게 되므로 명확한 예측기준 및 방법이 제시되어야 한다. 그러나 현재까지 다양한 다중회귀모델을 활용한 공사비 예측 방법이 개발되어 왔으나, 정성변수를 포함하여 공사비를 예측하는 방법에 대한 연구는 부족한 상황이다. 따라서 본 연구에서는 기획단계 활용을 위한 정성변수를 포함하는 공사비 예측모델을 개발하고자 하였다. 이를 위하여 공사비 영향요인을 분석 및 추출하고, 회귀분석을 위한 독립변수를 선정하였다. 그리고 정성변수를 포함하는 공사비 예측모델을 개발하며 사례적용을 통한 검증을 실시하였다. 개발된 공사비 예측모델과 "RESAMPLING 기법"을 사용하여 구조형식별 공사비 가산비율을 제시하였다. 본 연구에서 제시한 더미회귀모델과 가산비율을 활용하면, 일반적인 공사비 예측과 함께 동일한 평형, 세대수, 연면적에서 평면형식과 구조형식을 변경시켰을 때의 공사비 예측이 가능할 것으로 기대된다.
The writer has attempted in the present article first to investiqate whether shipping industry is poor countries' business more favourable to them, compared to wealthy nations in terms of comparative cost of operation and to analyse how can developing conntries afford to maintain a modern fleet; secondly to examine the economic aspect of the situation created by the UNCTAD V held in May this year, at which passed a resolution demanding "the right of all countries to an equitable participation in the carriage of cargoes generated by their own trade"; and thirdly to adduce conclusions. The article contains six chapters; chapter I is the introduction on the subject under examination; chapter II provides background information on the structure of the industry and of the operating cost of ship; chapter III addresses itself to the legal backgrounds of ensuring free transfer of resources among nations and free competition of shipping; chapter IV deals with the recent development of shipping nationalism of developing countries at the UNCTAD; chapter V discusses division of labour in shipping and in particular the survival mechanism of high-cost countries; and chapter Ⅵ sets forth conclusion.onclusion.
The 6th International Conference on Construction Engineering and Project Management
/
pp.637-638
/
2015
There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.
Purpose - It is widely accepted that the process of developing marketing strategy is composed of three steps: market segmentation, target market selection and positioning. However, mass marketing strategy based on cost reduction through economies of scale and standardized products, can be also an effective strategic option. Many marketing scholars including Theodore Levitt emphasize the importance of applying the mass production concept to various industries including service industries. Especially, in times of economic downturn, the capability of providing consumers with low-priced, value products can be an important source of competitive advantage, as well as the ability of providing high-priced premium products. Marketers should decide whether they will implement mass marketing strategy or target marketing strategy. The present study theoretically shows that firms should understand the target customers' price elasticity as well as the firm's cost structure in order to make such a strategic decision. Research design, data, and methodology - Instead of implementing an empirical study, this study provides a theoretical(mathematical) investigation on the effect of consumers' price elasticity on a firm's optimal price level, profit, sales volume, revenue, and cost. The results are mostly deduced from derivative calculations and several graphs are utilized to represent the results on the relationships between the variables under study. Results - The analytical results suggest that it is more profitable for a firm to adopt the segment/target marketing strategy (more specifically the differentiation strategy) when the degree of consumers' heterogeneity is high and the proportion of the fixed cost in the total cost is low. On the other hand, if the degree of consumers' heterogeneity is low and the fixed cost is high, it is better to adopt the mass marketing strategy or the cost leadership strategy. The strategy of concentrating on a single target market will be effective when consumers' needs are highly heterogeneous but the fixed cost is high. Any of the three types of generic strategies proposed my Porter(1980, 1985) can be applied when both the consumers' heterogeneity and the fixed cost are low. This study also proposes the contribution-margin-based method for developing the optimal pricing strategy. Conclusions - One of the primary roles of marketers is to find a proper compromise between the two conflicting goals of maximizing customer satisfaction and minimizing cost. In order to do so, he or she should understand the characteristics of the target customers as well as the cost structure of the firm. In addition to the theoretical analyses, this study discusses several business cases and explains how superior companies find the optimal compromise position between these two goals and dominate the market. One of the radical changes recently taking place in business arena is the reduction of production and distribution costs of both physical goods and information due to the advancement and the wide diffusion of information technology. The cost reduction combined with lowered priced elasticity incurred by customized products and services, will enable many firms to adopt the mass customization strategy.
When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.
한국의 건설공사비지수는 대한건설협회(이하 건협)가 1994년 이후 발표를 중단한 이후, 2004년 2월부터 정부에서 실적공사비제도와 관련하여 새롭게 공사비지수를 발표하기 시작하였다. 이 공사비지수는 한국은행(이하 한은)의 산업연관표, 생산자물가지수와 건협의 공사부문 시중노임 등 검증된 데이터를 활용하여 개발된 것이다. 기존의 통계자료만을 활용하는 것을 전제로 하였을 경우에는 이와 같은 방법이 유효할 수 있으나, 건설산업의 공사비 특성을 반영하기에는 일정한 한계가 있다. 본 논문에서는 이러한 한계를 극복하기 위하여 공사종류별로 노무비와 자재비의 투입구조를 직접적으로 조사하여, 해당 항목들의 원가변동치를 적용함으로써 건설공사비지수를 산출하는 방법을 도입하고자한다. 본 논문의 범위는 기존통계를 이용한 건설공사비지수의 문제점을 밝히고, 이를 대체할 수 있는 현실적인 대안으로서 직접조사에 의한 공사비지수 개발방법론의 타당성을 확인하는 것으로 한정한다.
In recent research there has been intense interest in understanding how real option valuation (ROV) approaches might usefully complement conventional discounted cash flow (DCF) techniques. However, investment decision makers in a real world have been worried about adopting the ROV approaches mainly because of difficulty in technically understanding the theory of the ROV approaches as indicated by many researchers. With this difficulty in mind, we propose the opportunity cost model as another discrete-time model to value a deferral option. The main advantage of observing a real options value in terms of the opportunity cost concept is to provide a technique for practitioners to estimate a wide range of real options values without sticking to a financial option modelling. The fundamental ground for developing the opportunity cost model proposed in this paper lies in the work of dissecting the structure of the real options value into three categories: capital gain, expected opportunity loss, and expected opportunity gain. At the end of the paper, we will present a short illustrative example to demonstrate the applicability of the model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.