• 제목/요약/키워드: The cost of developing structure

검색결과 141건 처리시간 0.026초

병렬 하이브리드 전기자동차의 주요 구성시스템에 대한 상대적 가격 모델링 (Relative Cost Modeling for Main Component Systems fo Parallel Hybrid Electric Vehicle)

  • 김필수;김용
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제48권6호
    • /
    • pp.294-300
    • /
    • 1999
  • There is a growing interest in hybrid electric vehicles due to environmental concerns. Recent efforts are directed toward developing an improved main component systems for the hybrid electric vehicle applications. Soon after the introduction of electric starter for internal combustion engine early this century, despite being energy efficient and nonpolluting, electric vehicle lost the battle completly to internal combustion engine due to its limited range and inferior performance. Hybrid Electric vehicles offer the most promising solutions to reduce the emission of vehicles. This paper describes a method for cost reduction estimation of parallel hybrid electric vehicle. We used a cost reduction structure that consisted of five major subsystems (three-type and two-type motor) for parallel hybrid electric vehicle. Especially, we estimated the potential for cost reductions in parallel hybrid electric vehicle as a function of time using the learning curve. Also, we estimated the potentials of cost by depreciation.

  • PDF

DEVELOPING WEB-BASED 5D SYSTEM CONNECTING COST, SCHEDULE AND 3D MODEL

  • Hando Kim;Jaehong Kim;Junghoon Han;Yonghan Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.157-161
    • /
    • 2011
  • BIM having started from architecture is being used in civil structure, but there are very few examples despite its effectiveness. In this paper, based on BIM technology, it is presented the method and result of developing web-based 5D system connecting cost, schedule and 3D model from the cable-stayed bridge. Through the system, the user can understand easily schedule on specific time and during some period and extract cost directly. This system also can manage various data types such as drawings, 3D models, documents and photos, for enhanced communication between stakeholders.

  • PDF

개략견적 기법 개발을 위한 신한옥 특성 분석 (Characteristics of Modernized Hanok for development Estimate system.)

  • 김효선;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.124-125
    • /
    • 2013
  • The purpose of this research is to propose an approximate estimation system for Modernized Hanok. Mock-up (Jisinjae) site data has been collected and analysed to characterize the modernized Hanok and to examine the range of cost fluctuation rate with each work items. As a result, number of floor, area (㎥), shape, methods and materials were considered as key factors for price change on the total construction cost. Furthermore, wood structure (34%) and roof (17%) account for major cost percentage. The cost fluctuation rate of two factors were -3.3%~+5.6% (wood structure) and -4.1%~+4.2% (roof). For further research, existing method will be analysed in order to developing the Hanok estimation system. And the cost fluctuation rate of every work items will be continually evaluated.

  • PDF

정성변수를 고려한 공공아파트 기획단계 공사비 예측모델 (Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects)

  • 지성민;현창택;문현석
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.91-101
    • /
    • 2012
  • 공공아파트 프로젝트의 기획단계에서 수행되는 적정 공사비 예측은 기획부터 유지관리까지 전(全) 단계에 걸쳐서 영향을 미치게 되므로 명확한 예측기준 및 방법이 제시되어야 한다. 그러나 현재까지 다양한 다중회귀모델을 활용한 공사비 예측 방법이 개발되어 왔으나, 정성변수를 포함하여 공사비를 예측하는 방법에 대한 연구는 부족한 상황이다. 따라서 본 연구에서는 기획단계 활용을 위한 정성변수를 포함하는 공사비 예측모델을 개발하고자 하였다. 이를 위하여 공사비 영향요인을 분석 및 추출하고, 회귀분석을 위한 독립변수를 선정하였다. 그리고 정성변수를 포함하는 공사비 예측모델을 개발하며 사례적용을 통한 검증을 실시하였다. 개발된 공사비 예측모델과 "RESAMPLING 기법"을 사용하여 구조형식별 공사비 가산비율을 제시하였다. 본 연구에서 제시한 더미회귀모델과 가산비율을 활용하면, 일반적인 공사비 예측과 함께 동일한 평형, 세대수, 연면적에서 평면형식과 구조형식을 변경시켰을 때의 공사비 예측이 가능할 것으로 기대된다.

후진국의 해운산업 적성에 관한 연구 (Is Shipping a Poor Country's Business\ulcorner)

  • 민성규
    • 한국항해학회지
    • /
    • 제3권2호
    • /
    • pp.31-45
    • /
    • 1979
  • The writer has attempted in the present article first to investiqate whether shipping industry is poor countries' business more favourable to them, compared to wealthy nations in terms of comparative cost of operation and to analyse how can developing conntries afford to maintain a modern fleet; secondly to examine the economic aspect of the situation created by the UNCTAD V held in May this year, at which passed a resolution demanding "the right of all countries to an equitable participation in the carriage of cargoes generated by their own trade"; and thirdly to adduce conclusions. The article contains six chapters; chapter I is the introduction on the subject under examination; chapter II provides background information on the structure of the industry and of the operating cost of ship; chapter III addresses itself to the legal backgrounds of ensuring free transfer of resources among nations and free competition of shipping; chapter IV deals with the recent development of shipping nationalism of developing countries at the UNCTAD; chapter V discusses division of labour in shipping and in particular the survival mechanism of high-cost countries; and chapter Ⅵ sets forth conclusion.onclusion.

  • PDF

Automated Methodology for Linking BIM Objects with Cost and Schedule Information by utilizing Geometry Breakdown Structure (GBS)

  • Lee, Kwangjin;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.637-638
    • /
    • 2015
  • There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.

  • PDF

가격탄력성과 생산비용에 기초한 대량 마케팅과 표적시장 마케팅의 비교 분석 (Comparative Analyses of Mass Marketing and Target Marketing Based on Price Elasticity and Production Cost)

  • 원지성
    • 유통과학연구
    • /
    • 제11권4호
    • /
    • pp.61-72
    • /
    • 2013
  • Purpose - It is widely accepted that the process of developing marketing strategy is composed of three steps: market segmentation, target market selection and positioning. However, mass marketing strategy based on cost reduction through economies of scale and standardized products, can be also an effective strategic option. Many marketing scholars including Theodore Levitt emphasize the importance of applying the mass production concept to various industries including service industries. Especially, in times of economic downturn, the capability of providing consumers with low-priced, value products can be an important source of competitive advantage, as well as the ability of providing high-priced premium products. Marketers should decide whether they will implement mass marketing strategy or target marketing strategy. The present study theoretically shows that firms should understand the target customers' price elasticity as well as the firm's cost structure in order to make such a strategic decision. Research design, data, and methodology - Instead of implementing an empirical study, this study provides a theoretical(mathematical) investigation on the effect of consumers' price elasticity on a firm's optimal price level, profit, sales volume, revenue, and cost. The results are mostly deduced from derivative calculations and several graphs are utilized to represent the results on the relationships between the variables under study. Results - The analytical results suggest that it is more profitable for a firm to adopt the segment/target marketing strategy (more specifically the differentiation strategy) when the degree of consumers' heterogeneity is high and the proportion of the fixed cost in the total cost is low. On the other hand, if the degree of consumers' heterogeneity is low and the fixed cost is high, it is better to adopt the mass marketing strategy or the cost leadership strategy. The strategy of concentrating on a single target market will be effective when consumers' needs are highly heterogeneous but the fixed cost is high. Any of the three types of generic strategies proposed my Porter(1980, 1985) can be applied when both the consumers' heterogeneity and the fixed cost are low. This study also proposes the contribution-margin-based method for developing the optimal pricing strategy. Conclusions - One of the primary roles of marketers is to find a proper compromise between the two conflicting goals of maximizing customer satisfaction and minimizing cost. In order to do so, he or she should understand the characteristics of the target customers as well as the cost structure of the firm. In addition to the theoretical analyses, this study discusses several business cases and explains how superior companies find the optimal compromise position between these two goals and dominate the market. One of the radical changes recently taking place in business arena is the reduction of production and distribution costs of both physical goods and information due to the advancement and the wide diffusion of information technology. The cost reduction combined with lowered priced elasticity incurred by customized products and services, will enable many firms to adopt the mass customization strategy.

  • PDF

A Suggestion of Contingency Guidelines According to ISDC Based on Overseas Contingency Data

  • Minhee Kim;Chang-Lak Kim;Sanghwa Shin
    • 방사성폐기물학회지
    • /
    • 제20권4호
    • /
    • pp.541-550
    • /
    • 2022
  • When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.

원가투입구조의 직접 조사에 의한 국내 건설공사비지수 개발을 위한 기초연구 - 도로시설물 중심으로 - (A Basic Study for Developing the Construction Cost Index by Directly Surveying the Cost Input Structure in Korea - Focused on Highway Construction Projects -)

  • 김우영;이준성;이영환;이복남;김윤주
    • 한국건설관리학회논문집
    • /
    • 제7권2호
    • /
    • pp.53-61
    • /
    • 2006
  • 한국의 건설공사비지수는 대한건설협회(이하 건협)가 1994년 이후 발표를 중단한 이후, 2004년 2월부터 정부에서 실적공사비제도와 관련하여 새롭게 공사비지수를 발표하기 시작하였다. 이 공사비지수는 한국은행(이하 한은)의 산업연관표, 생산자물가지수와 건협의 공사부문 시중노임 등 검증된 데이터를 활용하여 개발된 것이다. 기존의 통계자료만을 활용하는 것을 전제로 하였을 경우에는 이와 같은 방법이 유효할 수 있으나, 건설산업의 공사비 특성을 반영하기에는 일정한 한계가 있다. 본 논문에서는 이러한 한계를 극복하기 위하여 공사종류별로 노무비와 자재비의 투입구조를 직접적으로 조사하여, 해당 항목들의 원가변동치를 적용함으로써 건설공사비지수를 산출하는 방법을 도입하고자한다. 본 논문의 범위는 기존통계를 이용한 건설공사비지수의 문제점을 밝히고, 이를 대체할 수 있는 현실적인 대안으로서 직접조사에 의한 공사비지수 개발방법론의 타당성을 확인하는 것으로 한정한다.

연기옵션을 고려한 옵션가치의 일반적 기회비용 모델 (The Multi-Period Opportunity Cost Model to Evaluate an Option Value based on a Deferral Option)

  • 김규태
    • 산업공학
    • /
    • 제18권2호
    • /
    • pp.184-192
    • /
    • 2005
  • In recent research there has been intense interest in understanding how real option valuation (ROV) approaches might usefully complement conventional discounted cash flow (DCF) techniques. However, investment decision makers in a real world have been worried about adopting the ROV approaches mainly because of difficulty in technically understanding the theory of the ROV approaches as indicated by many researchers. With this difficulty in mind, we propose the opportunity cost model as another discrete-time model to value a deferral option. The main advantage of observing a real options value in terms of the opportunity cost concept is to provide a technique for practitioners to estimate a wide range of real options values without sticking to a financial option modelling. The fundamental ground for developing the opportunity cost model proposed in this paper lies in the work of dissecting the structure of the real options value into three categories: capital gain, expected opportunity loss, and expected opportunity gain. At the end of the paper, we will present a short illustrative example to demonstrate the applicability of the model.