• 제목/요약/키워드: The building total floor area

검색결과 82건 처리시간 0.028초

정부공사 건설 사업관리 용역의 대가 산정에 관한 연구 (A study on the estimate of construction management cost for public construction project in the CM for fee contract)

  • 정재영;윤태권
    • 한국건축시공학회지
    • /
    • 제6권3호
    • /
    • pp.115-122
    • /
    • 2006
  • This study is aimed to get clear model for CM fee level in public construction project. For the practical use and main target, CM for fee contract only is assessed and analysed. Cost estimate by percentage of total contract sum and method based on the historical construction data have significant deficiency. An regression model and probabilistic model are suggested with 9 independent variables. In the case of limited work scope, an element based floor area model is suggested and concluded with fish-bone scheme.

대전 중앙데파트 발파해체 사례 (A Case Study of Blast Demolition at Chung-Ang Department Store in Daejeon City)

  • 민형동;박종호;송영석;박훈
    • 화약ㆍ발파
    • /
    • 제27권1호
    • /
    • pp.62-78
    • /
    • 2009
  • 최근 오래된 건축물의 재건축이나 도심재생, 자연 생태를 복원하기 위한 노력과 함께 빌딩 건축기술도 빠르게 발전하고 있어 노후화된 건축물에 대한 철거가 급증하고 있다. 건축물 철거공사 시에는 주변 환경에 피해를 주지 않고, 관련 법규를 준수하면서 수행되어야 하는데. 철거공법 중에는 여러 가지공법이 있으나 이중 발파해체 공법은 공사비용이나 안전 등을 고려할 때 가장 실용적인 철거공법이다. 본 논문은 대전천 생태 복원 사업 중의 일환으로 35년 전 대전천 상부에 복개 구조물로 건축된 중앙데파트를 철거하기 위해 발파해체 공법을 적용하여 철거를 수행한 사례이다. 본 구조물은 8층 건물로 높이는 지하층을 포함하여 총 41.6m이며, 건면적 $1,650m^2$, 연면적 $18,351m^2$ 이다. 주변에 상가 및 건물 등이 밀집한 대전시 중심에 위치하고 있으며, 주요시설물로는 대전 지하철(18m), 후면상가(20m), 지하상가(15m), 목척교와 은중교(0.25m) 및 광케이블(0.25m) 등이 있다. 본 porject는 복잡한 도심지인 점을 감안하여 발파해체 공법 중 내파공법으로 선정하였으며, 주요 시설물에 피해를 주지 않기 위하여 시뮬레이션 프로그램을 이용하여 사전에 구조물의 붕괴 거동을 검토한 후 시행되었다. 총 80kg의 폭약과 1,000발의 뇌관이 사용되었다. 본 프로젝트는 국내 도심지에서 내파공법을 적용하여 발파해체를 성공적으로 수행한 좋은 사례가 될 것이다.

아파트 밀집지역 급조폭발물 테러 발생 시 잠재피해인구 추정 (Estimation of Potential Population by IED(Improvised Explosive Device) in Intensive Apartment Area)

  • 이강산;최진무
    • 한국경제지리학회지
    • /
    • 제18권1호
    • /
    • pp.76-86
    • /
    • 2015
  • 본 연구는 서울시 노원구 지역을 대상으로 차량 급조폭발물(IED)을 이용한 테러 발생 시 잠재피해인구를 추정하는 방법을 제시하였다. 정사영상을 바탕으로 객체기반 건물추출법을 활용하여 아파트의 면적을 구하였고, 고도자료를 바탕으로 건물의 높이와 층수를 추정하였다. 연면적기반 건물인구 추정법을 이용하여 각 아파트에 대한 거주인구를 추정한 후, 시나리오 분석법을 통해 연구지역 내 인구밀집지역인 지하철역을 중심으로 테러 발생 시 잠재적 피해인구를 추정하였다. 차량 급조폭발물(IED)을 이용한 테러 피해는 적재 가능한 폭약 량에 큰 영향을 받는 바, 테러에 이용 될 수 있는 차량의 종류에 따라 테러 발생 시 잠재적인 피해인구를 산출하였다. 분석결과, 노원구 마들역 주변에서 테러발생 시 가장 큰 잠재피해인구가 발생할 것으로 추정되었다. 본 연구에서 사용한 방법은 차후 연구에서 대단위 지역의 인구분포 추정 및 재난 피해 분석에 활용할 수 있을 것으로 기대된다.

  • PDF

건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 - (Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration)

  • 심유경;정재욱;이재현;정재민
    • 한국건설관리학회논문집
    • /
    • 제21권6호
    • /
    • pp.66-74
    • /
    • 2020
  • 해체공사의 수요증가와 사고 위험성을 고려하여 정부는 20년 건축물관리법을 시행해 해체공사의 안전관리를 개선하고자 하였다. 그러나 건축물관리법 제 30조 건축물의 해체 허가에 따른 기준은 일률적이기 때문에 규모에 따른 허가대상 건축물의 구분은 불합리할 수 있다. 또한, 해체공사는 건축물의 구조 유형에 따라 공사 난이도 및 발생 재해의 형태가 달라질 수 있기 때문에 본 연구는 건축물관리법상 신고대상에 속하는 조적조 등의 소규모 건축물의 구조 유형을 고려한 해체공사 안전관리 개선 방안을 제시하고자 한다. 본 연구의 순서는 (I) 건축물관리법 기준; (II) 건축물의 구조 유형에 따른 해체공사 분석; (III) 해체공사 허가대상 세분화 순으로 진행되었다. 연구 결과 건축물관리법상 허가대상은 과거 해체공사 실적의 10% 정도, 조적조는 2.43%에 불과하였다. 허가대상 기준을 세분화한 결과 조적조의 경우 연면적 100㎡이하일 때 허가 및 신고대상의 수가 유사해짐을 확인하였다. 이를 통해 이해관계자는 1) 해외와 같이 규모에 관계없이 특수구조 건축물에 강화된 안전관리 기준을 적용하거나, 2) 건축물의 구조 유형에 따라 해체공사 허가 대상 기준을 세분화하는 방식 등을 활용한 해체공사 안전관리를 개선할 수 있다.

한방병원 약제부의 공간계획에 관한 연구 (A study on the space programming of pharmacy department in Korean Herb Medicine Hospital)

  • 한선미;이특구
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제7권2호
    • /
    • pp.15-26
    • /
    • 2001
  • The purpose of this study is to present elementary data for space programming of pharmacy department in Korean Herb Medicine Hospital. The space composition of pharmacy department have been changed according to pharmaceutical service. In conclusion, the necessary spaces consist of medicine window, dispensary, herb medicine storeroom and decoction room. The selectable spaces consist of laboratory, processing room, manufacturing room and amenities for employees. This study suggest 2 types of space composition model according to total floor area and building scope. The location and area of pharmacy department change by means of change and growth of Korean Herb Medicine Hospital.

  • PDF

생애주기를 고려한 오피스 건물의 리모델링과 그린리모델링의 경제성 평가 연구 : 서울시 강남업무지구의 임대오피스 사례 (An Economic Evaluation Study of Office Remodeling and Green-remodeling Projects : A Simulation Approach to a Rental Office in GBD, Seoul)

  • 이성호;이재수
    • 대한건축학회논문집:계획계
    • /
    • 제34권3호
    • /
    • pp.23-34
    • /
    • 2018
  • Due to a waste of energy in korea, about 525,000 which are 75 percent of total buildings are at least 15 years old buildings that need remodeling. There are two current remodeling systems. One is a remodeling system to reduce a waste of resources from the reconstruction. The other is a green-remodeling system aimed to energy savings and reducing environmental costs. This study is to analyze quantitatively these current systems with respect to the cost-benefit caused by the life cycle and suggests the political and institutional implications through the interpretation of the results. For a quantitative analysis, we analyzed reducing maintenance costs and rent benefits with simulation by using opportunity costs, construction costs, plan costs and supervision costs as expense variables and using the reduced floor area ratio, institutional incentives, energy, water resources and certified emission reduction(CER) as benefit variables. As a result of the empirical study, the green-modeling was more beneficial in the field of environment such as the energy savings, however, the final benefits of remodeling which has no green building certification costs but more floor area ratio incentives were more economical. The green-remodeling system focused on reducing environmental costs and energy savings needs a equatable institutional incentive system.

공공개발지구 내 주차장용지의 이용실태와 토지공급방법 개선방안 연구 (A Study on the Use of Parking Lots and Improvement Methods of Land Supply in Public Development Zones)

  • 박창률;김시진
    • 토지주택연구
    • /
    • 제10권4호
    • /
    • pp.13-30
    • /
    • 2019
  • Parking lot within housing site contains public interest of relieving parking space shortage problem and subject to public restriction. If auctioned off at higher price by excessive competition in general competitive bid for land bidders, the development of parking lot will be made against its original purpose supply. The core issue is that a bid price is quite often to be blown out of proportion by 150%~ 250% due to extreme competition and, could face serious problem if a winning bidder runs sale business. If it is rental business, although about 30% of the total floor space of the whole building to be used as neighborhood facilities, too high winning bid price cause to lose transparency. In case of sale at aggregate buildings, most business operators would sell 30% of the neighborhood facilities, spare the parking lot and manages thereof separately. According to Aggregate Buildings Act, neighborhood facilities are allowed for individual registration and ownership of parking lot by business operator or designated person by business operator. In this case, the parking lot becomes 70% of the total floor space of the whole building and 70% of the land share which makes the mortgage very valuable and easier for business operator to get financial loan. There used to be many cases such as owners of neighborhood facilities (aggregate buildings partial owners) who run parking lot to repay their loan running parking lot to repay loan, but found that very tough and reached auction and relatively disadvantaged. For parking lot within housing site, it is recommend to exclude the public factors that land has and take into account of public restriction in area (housing site). Business opportunity for operators and protection of property rights for buyers in aggregate buildings, land supply method is recommended to replace from highest bid method into draw or private contract. In terms of price, supply at estimated price (construction price) and restriction on usage (Co-ownership of parking lot) proposals are submitted.

전기자동차 운행을 위한 태양광발전소 수요 예측 (Prediction of Demand for Photovoltaic Power Plants for Electric Vehicle Operation)

  • 최회균
    • 한국태양에너지학회 논문집
    • /
    • 제40권4호
    • /
    • pp.35-44
    • /
    • 2020
  • Currently, various policies regarding ecofriendly vehicles are being proposed to reduce carbon emissions. In this study, the required areas for charging electric vehicle (EV) batteries using electricity produced by photovoltaic (PV) power plants were estimated. First, approximately 2.4 million battery EVs, which represented 10% of the total number of vehicles, consume approximately 404 GWh. Second, the power required for charging batteries is approximately 0.3 GW, and the site area of the PV power plant is 4.62 ㎢, which accounts for 0.005% of the national territory. Third, from the available sites of buildings based on the region, Jeju alone consumes approximately 0.2%, while the rest of the region requires approximately 0.1%. Fourth, Seoul, which has the smallest available area of mountains and farmlands, utilizes 0.34% of the site for PV power plants, while the other parts of the region use less than 0.1%. The results of this study confirmed that the area of the PV power plant site for producing battery-charging power generated through the supply of EVs is very small. Therefore, it is desirable to analyze and implement more specific plans, such as efficient land use, forest damage minimization, and safe maintenance, to expand renewable energy, including PV power.

국내 건축물 지진피해 위험도의 지역단위 평가 (Regional Seismic Risk Assessment for Structural Damage to Buildings in Korea)

  • 안숙진;박지훈;김혜원
    • 한국지진공학회논문집
    • /
    • 제27권6호
    • /
    • pp.265-273
    • /
    • 2023
  • This study proposes a methodology for the regional seismic risk assessment of structural damage to buildings in Korea based on evaluating individual buildings, considering inconsistency between the administrative district border and grid lines to define seismic hazard. The accuracy of seismic hazards was enhanced by subdividing the current 2km-sized grids into ones with a smaller size. Considering the enhancement of the Korean seismic design code in 2005, existing seismic fragility functions for seismically designed buildings are revised by modifying the capacity spectrum according to the changes in seismic design load. A seismic risk index in building damage is defined using the total damaged floor area considering building size differences. The proposed seismic risk index was calculated for buildings in 29 administrative districts in 'A' city in Korea to validate the proposed assessment algorithm and risk index. In the validation procedure, sensitivity analysis was performed on the grid size, quantitative building damage measure, and seismic fragility function update.

사무소건물 조명기기와 열원기기의 고효율기기로의 교체에 관한 경제성 검토 (Feasibility Study on Retrofitting Lighting and Heat Source Equipments in Office Buildings)

  • 이철구;김종대;임태순
    • 한국지열·수열에너지학회논문집
    • /
    • 제12권2호
    • /
    • pp.13-18
    • /
    • 2016
  • Energy saving has been main concern, thus government supporting policies which are based on Fundamentals of Low-carbon Green Growth Act', 'Green Building Support Act, have been prepared in Korea. The objective of this study is to estimate energy conservation effectiveness and economic advantage assuming that lighting equipments and heat source equipments would be retrofitted. Office building, which has total floor area of $30,000m^2$, was a subject of this study. From the estimations, electric rate will be decreased by 62,886,000 won per year due to lighting equipments retrofit, and gas rate will be decreased 11,141,000 won or 17,332,000 won per year due to heat source equipments retrofit (in case of COP 1.2 or 1.5). Payback period of each case that are calculated by energy saving cost and retrofit cost are estimated 27.9 year, 38.6 year and 29.2 year, thus economic supporting policies is necessary for effective energy saving in buildings. Meanwhile payback period of heat source equipment for new building is estimated 6.1 year and 8.3 year.