• 제목/요약/키워드: Test system design

검색결과 5,855건 처리시간 0.036초

A Study on Development of Interlocking Inspection System for Electronic Interlocking System (전자연동장치의 연동검사시스템 개발)

  • 박영수;이기서
    • Journal of the Korean Society for Railway
    • /
    • 제5권2호
    • /
    • pp.104-111
    • /
    • 2002
  • The purpose of interlocking system was to prevent the route for a train being set up and its protecting signal cleared if there was already another, conflicting route set up and the protecting signal for that route cleared. This paper proposed Interlocking Inspection System(IIS) consisting of interlocking simulator and field simulator to operate interlocking test of computer based Electronic Interlocking System(EIS) in this paper. Interlocking simulator consists of Design Edit System(DES), Logical Database Management Tool(LDMT) and real-time confirming system, field simulator is a equipment to simulate a control object of EIS and constitutes configuration operated in 19 inch standard rack. As a result of test to prove capacity of this IIS, the efficiency was shown as excellent. Therefore by using inspection system, we obtain every advantages. It has the functions for test data generation and automatic test execution based on personal computer. Time and cost for test work can be reduced more efficiently by using this developed inspection system

Research for Installation and Operation of High Temperature Superconducting Cable System (고온 초전도 케이블 시스템 설치 밀 운전을 위한 연구)

  • Choi, Hyung-Sik;Sohn, Song-Ho;Hwang, Si-Dole
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.653-657
    • /
    • 2005
  • The commercial contract was made firstly in the world for one set of high temperature superconducting(HTS) cable system between buyer, Korea Electric Power Research Institute and seller, Sumitomo Electric Industries, Ltd. in August 2004. After fabrication, test and examination, the HTS cable system will be installed at the KEPRI's test field in Gochang, Jeonbuk province from the time of July 2005. KEPRI is preparing measurement and test facilities for field test of the HTS cable system and carrying out researches into the design and construction of superconducting cable test building, evaluation of cooling performance, measurement of AC loss, analysis of the quench phenomena due to excess current and means of linking the HTS cable system to the existing electric power supplying system. The constitution of, the method to install and the plan of test operation of the HTS cable system will be presented in this paper.

  • PDF

The trial installation test of PSS to Power Plant using Real Time Digital Simulator (RTDS를 이용한 PSS 현장 설치 모의 시험)

  • Hur, Jin;Kim, Dong-Joon;Moon, Young-Hwan;Shin, Jeong-Hoon;Kim, Tae-Kyun
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.59-62
    • /
    • 2002
  • Before a developed digital Power System Stabilizer(PSS) is installed to real power system, an efficient trial test for installing PSS is needed. In this paper, the performance of developed digital PSS for a single hydro-turbine generator and infinite bus system has been investigated using Real Time Digital Simulator(RTDS) in order to install PSS to real power system practically. The test system was composed of RTDS, three phase voltage/current amplifier and the PSS and the test scheme provided a very efficient way to verify the design and control performance of a PSS to be applied to real power system. The trial installation test through AVR 3% step test and three fault analysis may be guaranteed to install PSS to real power system.

  • PDF

Development of the Keypad Test System using PIC Controller (PIC 컨트롤러를 이용한 KEYPAD 검사 시스템 개발)

  • 최광훈;권대규;전규철;이성철
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 한국정밀공학회 2002년도 추계학술대회 논문집
    • /
    • pp.459-462
    • /
    • 2002
  • This paper presents the development or a keypad test system for the improvement or the working environment and productivity improvement using the microprocessor PIC16F877 Chip. In order to detect the fault of keypad products, the design of hardware and software is performed in this system. All controls of the system is implemented by the 8 bit one chip micro-controller PIC. This keypad test system can also recognizes the work process, the work result and the fault position of the keypad which is made by the method of a flexible printed circuit (FPC) and construct the database about test results using personal computer. The experimental results show the effective performance of the keypad test system.

  • PDF

Monitoring System Design for the GPS/INS Integrated Navigation System (GPS/INS 통합 항법 시스템용 모니터링 시스템 설계)

  • 한상재;오상헌;황동환;이상정
    • Journal of Institute of Control, Robotics and Systems
    • /
    • 제9권3호
    • /
    • pp.242-250
    • /
    • 2003
  • We propose the monitoring system scheme for the CPS/INS integrated navigation system. The design requirements of the monitoring system are suggested and the software scheme based on GUI is proposed. The proposed monitoring system consists of an I/O interface part, a navigation data display part, and a post-processing part. The I/O interface part is responsible for data communication between the monitoring system and a navigation computer unit. The navigation data display part provides various display methods to show the navigation data to user in real-time. The post-processing part collects the navigation data to analyze the performance of navigation system. The proposed monitoring system software was developed using the Visual C++ programming language and a van test was carried out to demonstrate the real-time operation of the monitoring system. The test result shows that the proposed monitoring system can be effectively applied to the CPS/INS integrated navigation system.

Test Methodology for Multiple Clocks Single Capture Scan Design based on JTAG IEEE1149.1 Standard (IEEE 1149.1 표준에 근거한 다중 클럭을 이용한 단일 캡쳐 스캔 설계에 적용되는 경계 주사 테스트 기법에 관한 연구)

  • Kim, In-Soo;Min, Hyoung-Bok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • 제56권5호
    • /
    • pp.980-986
    • /
    • 2007
  • Boundary scan test structure(JTAG IEEE 1149.1 standard) that supports an internal scan chain is generally being used to test CUT(circuit under test). Since the internal scan chain can only have a single scan-in port and a single scan-out port; however, existing boundary test methods can not be used when multiple scan chains are present in CUT. Those chains must be stitched to form a single scan chain as shown in this paper. We propose an efficient boundary scan test structure that adds a circuit called Clock Group Register(CGR) for multiple clocks testing within the design of multiple scan chains. The proposed CGR has the function of grouping clocks. By adding CGR to a previously existing boundary scan design, the design is modified. This revised scan design overcomes the limitation of supporting a single scan-in port and out port, and it bolsters multiple scan-in ports and out ports. Through our experiments, the effectiveness of CGR is proved. With this, it is possible to test more complicated designs that have high density with a little effort. Furthermore, it will also benefit in designing those complicated circuits.

Large-scale pilot test study on bearing capacity of sea-crossing bridge main pier pile foundations

  • Zhang, Xuefeng;Li, Qingning;Ma, Ye;Zhang, Xiaojiang;Yang, Shizhao
    • Geomechanics and Engineering
    • /
    • 제7권2호
    • /
    • pp.201-212
    • /
    • 2014
  • Due to the sea-crossing bridge span is generally large and main pier pile foundations are located in deep water and carry large vertical load, sea-crossing bridge main pier pile foundations bearing mechanism and load deformation characteristics are still vague. Authors studied the vertical bearing properties of sea-crossing bridge main pier pile foundations through pilot load tests. Large tonnage load test of Qingdao Bay Bridge main pier pile program is designed by using per-stressed technique to optimize the design of anchor pile reaction beam system. Test results show that the design is feasible and effective. This method can directly test bearing capacity of main pier pile foundations, and analysis bearing behaviors from test results of sensors which embedded in the pile. Through test study the vertical bearing properties of main pier pile foundation and compared with the generally short pile, author summarized the main pier pile foundations vertical bearing capacity and the main problem of design and construction which need to pay attention, and provide a reliable basis and experience for sea-crossing bridge main pier pile foundations design and construction.

Preliminary design of lunar lander propulsion system and ground test model (달착륙선 추진시스템 기본 설계 및 지상 모델 설계)

  • Kim, Su-Kyum;Yu, Myoung-Jong
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 한국추진공학회 2010년도 제35회 추계학술대회논문집
    • /
    • pp.581-584
    • /
    • 2010
  • Korea Aerospace Research Institute (KARI) started preliminary research about the propulsion system for lunar orbiter and moon lander this year in order to prepare korean moon exploration plan of 2020s. The final goal of this study is to develop a prototype propulsion system for lunar exploration and to perform ground landing test using this propulsion system. In this year, preliminary design of propulsion system and 200N class monopropellant thruster have been conducted. In this paper, the trade-off study result and the design concept of the propulsion system for Korean moon exploration will be introduced and preliminary design of propulsion system will be presented.

  • PDF

Configuration and Design of the Large Multi-Electromagnetic Shaking System (대형 멀티 전자기 가진 시스템의 구성 및 설계)

  • 우성현;김홍배;문상무;김영기;임종민
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 한국소음진동공학회 2004년도 춘계학술대회논문집
    • /
    • pp.618-622
    • /
    • 2004
  • The vibration test system of SITC(Satellite Integration and Test Center) at KARI(Korea Aerospace Research Institute) has been used successfully for the environmental tests of a majority of korean space programs, such as KOMPSAT, Koreasat KITSAT, STSAT and KSR program since 1996. To meet the recent needs of large size test facility available for the vibrational tests of the huge launch vehicles and tole-communication satellites which will be developed in the near future, KARI undertook to construct the large size multi-electromagnetic shaking system with 3 $\times$ 3m head expander system. The new system will consist of three electromagnetic shakers which has 160 kN thrust force individually, and be able te sustain up to 8 tons test load and 300 kNm overturing moment. And to avoid the tremendous cost and effort to furnish the seismic block with large size and weight, it will adopt a Lin-E-Air type configuration with which the seismic block is less severe than a Solid-Truninon type. In addition, to fulfill the strong requirement of high overturning moment the additional guidance system including a central bearing system on a central support and several pad bearings around the head expander body is now considered. This paper describes the configuration and the design parameters of the multi-shaking system which is under development by KARI's engineers.

  • PDF

A Study on the Design of an Efficient Audit Model in the Area of Information System Testing Activities

  • Kim, Hee Wan;Jung, Yong Gyu
    • International Journal of Advanced Culture Technology
    • /
    • 제9권1호
    • /
    • pp.210-217
    • /
    • 2021
  • In the case of an agile-based project, it was inadequate to perform a comprehensive inspection and evaluation on the establishment and operation of an information system by performing audit only with the audit and inspection elements provided by the existing information system audit and inspection system. In particular, in the case of the test activity area, it was necessary to improve the test activity audit check items to comprehensively check the agile-based development process by applying the existing audit system. To this end, a test activity improvement check model of the agile methodology audit model was presented by applying the repetition concept, a characteristic of the agile methodology. In order to empirically verify the model of this study, a survey was conducted for auditors and designers/developers who have experience in performing agile-based projects and auditing information systems. As a result of the questionnaire on the integrated test and system test in the test stage, more than 70% of the respondents were found to be suitable. More than 80% of the respondents judged that it was appropriate as a result of the questionnaire on "improvement and regression test progress according to integrated test and system test results" and "integrated test and functional actions of components and subsystems".