• Title/Summary/Keyword: Test scheduling

Search Result 221, Processing Time 0.023 seconds

A Study of Resource Utilization Improvement on Cloud Testing Platform

  • Kuo, Jong-Yih;Lin, Hui-Chi;Liu, Chien-Hung
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.7
    • /
    • pp.2434-2454
    • /
    • 2021
  • This paper developed the software testing factory-cloud testing platform (STF-CTP) to address the software compatible issues in various smart devices. Software developers who only require uploading the application under test (AUT) and test script can test plenty of smart devices in STF-CTP. The challenge for the cloud test platform is how to optimize the resource and increase the performance in the limited resource. This paper proposed a new scheduling mechanism and a new process of the system operation which is based on the OpenStack platform. We decrease about 40% memory usage of OpenStack server, increase 3% to 10% Android device usage of STF-CTP, enhance about 80% test job throughput and reduces about 40% test job average waiting time.

Performance Evaluation of the Full-Scale Active Mass Dampers based on a Numerical Model and Test (실물크기 능동형 제어장치의 수치모델 및 실험에 기초한 성능 평가)

  • Jeon, Min-Jun;Lee, Sang-Hyun;Woo, Sung-Sik;Mun, Dae-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.6
    • /
    • pp.635-643
    • /
    • 2015
  • In this study, the experimental test results are given to confirm the control efficiency of the linear control algorithm used for designing the active mass dampers(AMD) which are supposed to be installed at Incheon international airport control tower. The comparison between the results from test and numerical analysis is conducted and it was observed that the AMD showed the control performance expected by the numerical model. The effects of the gain scheduling and constant-velocity signal added to the control signal calculated by the algorithm is identified through the observation that the AMD always show behavior within the given stroke limit without any loss of the desired control performance. The phase difference between the accelerations of the structure and the AMD were almost close to 90 degree, which implies that the AMD absorbed the structural energy effectively.

Experimental Test Results of Nine Scheduling Operational Modes of PV and Battery Hybrid System for the Development of Automatic Control Algorithm for Continual Operation without being shut-downed (태양광 배터리 Hybrid 전력공급시스템 9가지 운전 모드 시험결과 및 무고장 연속 운전을 위한 자동제어 알고리즘 개발)

  • Song, Taek Ho;Yang, Seung Kwon;Kim, Minjeong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.1
    • /
    • pp.25-32
    • /
    • 2019
  • K-BEMS System was introduced to reduce peak load and to save total energy of the 200 buildings that KEPCO headquarter and branch offices use. And K-BEMS system is composed of PV, battery, and hybrid PCS. KEPCO research institute has carried out this K-BEMS research project for 3 years since January 2016. In this paper, the results of the project are shown. 9 modes of test results of K-BEMS system and are operational problems were analyzed. And measures to cure the trouble are also suggested. Batteries are operated more than 20% of SOC, and less than 20% of SOC battery protection switches are automatically shutting down the system and the system no longer respond to EMS, ending the supply of PV, and so therefore to continue the PV power supply it was turn out to be necessary that the EMS should automatically change its policy to change PV only supply mode automatically when the Battery Switch automatically operated. To operate the system continuously and automatically, it is necessary to modify the minimum operational SOC value, and in addition to that the EMS computer must remember the last shut-down SOC and Voltage which interrupted the system and add some margin to reflect the measurement error in the system.

A New Method for the Test Scheduling in the Boundary Scan Environment (경계 주사 환경에서의 상호연결 테스트 방법론에 대한 연구)

  • Kim, Hyun-Jin;Shin, Jong-Chul;Kang, Sung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.11b
    • /
    • pp.669-671
    • /
    • 1998
  • Due to the serial nature of scan chains, the use of the boundary scan chain leads the high application costs. And with 3-state net, it is important to avoid enabling the two drivers in a net. In this paper, the new test method for 3-state nets in the multiple boundary scan chains is presented. This method configures the boundary scan cells as multiple scan chains and the test application time can be reduced. Also three efficient algorithms are proposed for testing the interconnects in a board without the collision of the test data in 3-state nets.

  • PDF

The Epidemiology of Delays in a Teaching Hospital (부적절 재원의 이유)

  • Kim, Yoon;Lee, Kun-Sei;Kim, Chang-Yup;Kim, Yong-Ik;Shin, Young-Soo;Lee, Sang-Il
    • Journal of Preventive Medicine and Public Health
    • /
    • v.26 no.4 s.44
    • /
    • pp.650-660
    • /
    • 1993
  • This study aims to describe the causes of medically unnecessary hospital stay at a teaching tertiary hospital, using modified version of Delay Tool in which the causes of delay are divided into slx major categories : delay related to test scheduling, test results, surgery, medical staff, patient/family, and administration. For the analysis of hospital stay, 6,479 inpatient-days were reviewed in two medical and four surgical departments for one month. Initially inappropriate hospital stays were identified using Appropriateness Evaluation Protocol (AEP), and causes of delay listed in Delay Tool were assigned to each of them. In both medical and surgical services, the most important cause of delay was related to medical staffs, ranging from 3.6% to 51.6% of total inpatient days. Next important category was delay related to test scheduling in medical services ($4.7{\sim}9.2%$), and delay related to surgery in surgical services ($7.3{\sim}15.0%$). Among subcategories of delay related to medical staffs, delay due to conservative care was the most important cause of inappropriate hospital stay ($2.9{\sim}6.4%$). Each clinical departments had different distribution among delay categories, which could not be fully justified by their clinical charateristics. The Delay Tool would be helpful in exploring factors related to the inefficient use of hospital beds. As a measurement tool of inappropriate hospital stay, however, the Delay Tool should be refined in the definitions of categories and its contents.

  • PDF

An Efficient Scheduling Method Taking into Account Resource Usage Patterns on Desktop Grids (데스크탑 그리드에서 자원 사용 경향성을 고려한 효율적인 스케줄링 기법)

  • Hyun Ju-Ho;Lee Sung-Gu;Kim Sang-Cheol;Lee Min-Gu
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.7
    • /
    • pp.429-439
    • /
    • 2006
  • A desktop grid, which is a computing grid composed of idle computing resources in a large network of desktop computers, is a promising platform for compute-intensive distributed computing applications. However, due to reliability and unpredictability of computing resources, effective scheduling of parallel computing applications on such a platform is a difficult problem. This paper proposes a new scheduling method aimed at reducing the total execution time of a parallel application on a desktop grid. The proposed method is based on utilizing the histories of execution behavior of individual computing nodes in the scheduling algorithm. In order to test out the feasibility of this idea, execution trace data were collected from a set of 40 desktop workstations over a period of seven weeks. Then, based on this data, the execution of several representative parallel applications were simulated using trace-driven simulation. The simulation results showed that the proposed method improves the execution time of the target applications significantly when compared to previous desktop grid scheduling methods. In addition, there were fewer instances of application suspension and failure.

A Study on Verification of PowerRail based on Voltage Drop under Extended Feeding Condition (연장급전 전압강하 계산을 위한 전기철도 급전 시뮬레이터의 검증에 관한 연구)

  • Kim, Joorak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.331-337
    • /
    • 2015
  • The power flow analysis of electrified railway is required complicated calculation, because of variable load. Train runs trough rail supplied by electric power therefore, the load value in electrified railway system fluctuates along time. The power flow algorithm in electrified railway system is different from general power system, and the power flow simulation is peformed by the particular simulation software. Powerail is simulation software for analysis of traction power supply system developed by KRRI, in 2008. This consists of load forecasting module, including TPS and time scheduling, and power flow module. This software was verified by measured current under normal feeding condition, however, has not been verified by voltage on the condition of extended feeding. This paper presents the verification of PowerRail based on voltage drop under extended feeding condition. This is performed by comparing simulation result with field test. Field test and simulation is done in commercial railway line.

Test Scheduling for Low Power BIST (저전력 BIST를 위한 테스트 스케줄링)

  • Bae, Jae-Sung;Son, Yoon-Sik;Chong, Jong-Wha
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2002.04a
    • /
    • pp.635-638
    • /
    • 2002
  • BIST(Built-In Self-Test)를 이용한 테스트 방식은 정상 동작 모드인 회로에 비해 테스트 모드에서 보다 많은 스위칭이 발생하고, 과도한 전력 소모에 의해 회로가 손상을 받을 수 있는 문제점을 갖고 있다. 본 논문은 test-per-clock BIST 구조에서 전력이 제한되어 있을 때 테스트 적용 시간과 총 에너지 소비를 최소화하기 위한 테스트 스케줄링 알고리즘을 제안한다. 제안된 방법은 테스트 세션을 구성함에 있어 각 세션에 포함되는 각 블록의 테스트 시작 시간을 동적으로 결정하여 기존의 알고리즘에 비하여 전력 소모와 전체 테스트 시간을 줄일 수 있다.

  • PDF

An Implementation and Performance Test of Automotive RTOS Based on OSEK/VDX (OSEK/VDX 기반 차량용 RTOS의 구현과 성능 테스트)

  • Cho, Sung-Rae;Kim, Byung-Joon;Jin, Sung-Ho;Lee, Jun-Ho
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.6 no.3
    • /
    • pp.139-148
    • /
    • 2011
  • As the architecture of automotive software is complicated and LOC of software increases, there is an increasing demand for standard operating system. OSEK/VDX defines an industry standard for automotive operating system and middleware. This paper introduces an implementation of RTOS(OSCAR-OSEK) based on OSEK/VDX standard. For better speed of scheduling, we suggest a new method for ready queue implementation considering the characteristic of automotive application software. Also we introduce a method for improving the portability of RTOS on various MCUs. And, we show OSCAR-OSEK implementation and performance test results.

Dieticians' Perception of Nutrient Preservation Management Practices during Meal Production by School Food Service in Daegu Area (학교급식 생산단계별 영양소 보존관리에 대한 영양사의 인식 - 대구지역을 중심으로)

  • Park, So-Young;Cha, Myeonghwa;Yang, Ji-Hye;Ryu, Kyung
    • Journal of the Korean Dietetic Association
    • /
    • v.18 no.2
    • /
    • pp.170-185
    • /
    • 2012
  • The purpose of this study was to explore nutrition teachers/dietitians' perception towards production management practices as well as the importance & performance of nutrient preservation during production by school foodservices. A total of 120 school nutrition teachers/dietitians in the Daegu area participated in this study. The data were analyzed by descriptive analysis, t-test, and ANOVA using SPSS/Windows (ver 17.0). A questionnaire consisted of three dimensions with 66 items concerning the general characteristics of schools and respondents, production management practices, and perceived importance and performance of nutrient preservation. Exactly 79.2% of dietitians responded that scheduling of production management is necessary, and 52.5% of respondents perceived that their knowledge for nutrient preservation is of normal/average level. Thirty-eight percent of respondents did not establish scheduling of production management; according to them, cooking stage has priority over other stages of nutrient preservation. Perceived importance score was higher than perceived performance score in all stages of production management. The difference between perceived importance and performance in the production scheduling stage was found to be statistically significant. The results indicate that nutrition control point should be established and managed to prevent nutrient loss in all production stages. Further, dietitians who do not take measures to reduce nutrient loss should be carefully educated on the importance of nutrient control and be motivated to follow guidelines on nutrient preservation.