• Title/Summary/Keyword: Test Cost

Search Result 3,991, Processing Time 0.033 seconds

Vibration Durability Analysis for Components of Construction Equipment Industry (건설중장비 부품의 진동내구해석)

  • Kim, Sunghwan;Ham, Jeonghoon;Kang, Hyunseok
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2013.04a
    • /
    • pp.509-513
    • /
    • 2013
  • There are so many types of construction equipment. Excavator is one of typical construction equipment which is working under the tough and severe environments. It's important for engineers to design CE components by the vibration durability point of view. Traditionally, two typical vibration durability methods to verify the durability of components. The first is experimental method which is using the vibration durability test bench. But experimental approach on vibration durability is needed a lot of cost and time. The second is analytical method which is using the vibration durability analysis such as Dirlik, Stainberg, Lalanne and others methodologies. The one of main advantages on vibration durability analysis can reduce the cost and time. We present a vibration durability analysis process and methodology on the guardrail system in excavator.

  • PDF

The Study on the New Traditional Korean-style house condition & Improvement Direction for Jeonnam region Rural Houses -Focus of Yeongam-gun & Yeosu region- (전남지역 신축 농촌한옥 현황 및 개선방향에 관한 연구 -영암군 및 여수 지역을 중심으로-)

  • Jo, Yeon-Jun;Jo, Giran
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.4
    • /
    • pp.45-52
    • /
    • 2010
  • The study has effected checking the traditional Korean-style house condition in Farm village and the resident preference test in jeonnam area for examination propriety of development a traditional Korean-style house. Also, it was checked over the problem and improvement direction of new building the Korean style house. The resident wanted living in the traditional Korean-style house if it is compromised problem of living equipment and cost of building. First. Jeonnam area Korean style house must keep the 'ㅡ' type plan. Second, the plan must construct compact and effective plan with the main floored room as the center for prevention against an indiscreet plan space extend of outside. Third, it has must need suitable material and construction for applying traditional exterior with effect. Fourth, it has must need actualization plan for the cost of construction is 3,500,000/py for construction.

A Benchmark Study on the Stereo-lithography-type Rapid Prototyping Apparatus using Transparent Materials (투명 재료를 사용하는 광조형 방식 쾌속조형 장비의 성능 비교 시험)

  • Kim, Gi-Dae;Sung, Joo-Hyung
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.24 no.6
    • /
    • pp.138-145
    • /
    • 2007
  • Among various rapid prototyping processes, stereo-lithography process which can manufacture transparent prototype is known to be the greatest in the form & dimensional accuracy and surface roughness. In this paper, bench mark tests of 4 stereo-lithography-type rapid prototyping apparatus were carried out using transparent materials. The test includes measurement of mechanical properties, form accuracy, building speed and manufacturing cost. It was observed that ViperPRO of 3D systems is advantageous in the mechanical properties and building speed, RM600011 of CMET in sub-milli scale form accuracy and manufacturing cost, and relatively economical Eden500V of Objet is great in tensile strength at room temperature.

Application of Reliability Growth Management for Construction Equipment Development Process (건설장비 개발과정에서 신뢰성성장관리 적용방법에 대한 연구)

  • So, Young-Kug;Jeon, Young-Rok;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.13 no.3
    • /
    • pp.175-190
    • /
    • 2013
  • This study considers reliability growth management as the excellent method for construction equipment development with the effect on decreasing COPQ(Cost of Poor Quality Cost) of new products. MIL-HDBK-189A(1981) and RADC-TR-84-20(1984) standards provide a general concept of reliability growth management including to reliability growth test, models and FRACAS(Failure Reporting and Corrective Action System). There is no study how to apply reliability growth management to construction equipment(or machine) development. This paper propose the method to apply it to construction equipment development process from the reliability target setting for developing products to launching them at market. It is expecially showing how to set target reliability for new developing equipment and the development risk to reach the reliability target in detail.

The docking and searching approach to hit COX-2 inhibitors

  • Kim, Jong-Hoon;Park, Hyun-Jung;Noh, Ji-Young;Ryu, Hyung-Chul;Park, Sang-Wook;Ko, Dong-Hyun;Chae, Myeong-Yun;Cho, Il-Hwan
    • Proceedings of the PSK Conference
    • /
    • 2003.10b
    • /
    • pp.185.2-185.2
    • /
    • 2003
  • The typical approach of virtual screening is to prepare a 3D database and dock each member to the receptor, and carry out a post-analysis to make a final selection of compounds to be tested. The biological test of these compounds leads to 'hit'. The size of the 3D database is rate-determining factor because the docking process is still time-consuming method. The number of compounds for biological testing is cost-determining factor because the materials used in the test are cost-consuming. The use of the representative subsets derived from the entire database help reduce runtime of docking procedure. (omitted)

  • PDF

OPTIMAL DESIGN FOR CAPACITY EXPANSION OF EXISTING WATER SUPPLY SYSTEM

  • Ahn, Tae-Jin;Lyu, Heui-Jeong;Park, Jun-Eung;Yoon, Yong-Nam
    • Water Engineering Research
    • /
    • v.1 no.1
    • /
    • pp.63-74
    • /
    • 2000
  • This paper presents a two- phase search scheme for optimal pipe expansion of expansion of existing water distribution systems. In pipe network problems, link flows affect the total cost of the system because the link flows are not uniquely determined for various pipe diameters. The two-phase search scheme based on stochastic optimization scheme is suggested to determine the optimal link flows which make the optimal design of existing pipe network. A sample pipe network is employed to test the proposed method. Once the best tree network is obtained, the link flows are perturbed to find a near global optimum over the whole feasible region. It should be noted that in the perturbation stage the loop flows obtained form the sample existing network are employed as the initial loop flows of the proposed method. It has been also found that the relationship of cost-hydraulic gradient for pipe expansion of existing network affects the total cost of the sample network. The results show that the proposed method can yield a lower cost design than the conventional design method and that the proposed method can be efficiently used to design the pipe expansion of existing water distribution systems.

  • PDF

Cost Driver Analysis in General Hospitals Using Simultaneous Equation Model and Path Model (연립방정식모형과 경로모형을 이용한 종합병원의 원가동인 분석)

  • 양동현;이원식
    • Health Policy and Management
    • /
    • v.14 no.1
    • /
    • pp.89-120
    • /
    • 2004
  • The purpose of this empirical study is to test hypotheses in order to identify the cost drivers that drive indirect costs in general hospitals in Korea. In various cases' studies, it has been suggested that overhead costs are driven by volume and complexity variables, how they are structurally related and how the cost impacts of these variables can be A unique feature of the research is the treatment of complexity as an endogenous variable. It is hypothesized that level of hospital complexity in terms of the number of services provided(i.e., “breath" complexity) and the intensity of individual estimated in practice. overhead services(ie., “depth" complexity) are simultaneous determined with the level of costs needed to support the complexity. Data used in this study were obtained from the Database of Korean Health Industry Development Institute, Health Insurance Review Agency and analyzed using simultaneous equation model, path model. The results found those volume and complexity variables are all statistically signi-ficance drivers of general hospital overhead costs. This study has documented that the level of service complexity is a significant determinant of hospital overhead costs, caution should be exercised in interpreting this as supportive of the cost accounting procedures associated with ABC. with ABC.

Economic Analysis of Wastewater Reuse Systems for Agricultural Irrigation using a System Dynamics Approach (시스템 다이내믹스를 이용한 농업용수 재이용시스템 경제성 분석)

  • Jeong, Han Seok;Suh, Kyo;Jang, Tae Il;Seong, Choung Hyun;Kim, Hak Kwan;Park, Seung Woo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.2
    • /
    • pp.9-20
    • /
    • 2013
  • Many studies have reported additional treatment is needed to use wastewater for agricultural purpose. Economic considerations should be taken into account to establish infrastructure for agricultural reuse because of a large amount of water use in irrigation and relatively low water quality requirement. The objective of this study was to conduct economic analysis of wastewater reclamation and reuse systems for agriculture. A system dynamics approach considering complexity and dynamics in the wastewater reuse systems was used for the economic analysis, which are related with social, environmental, and economic problems. Sensitivity and benefit cost analysis for wastewater reuse systems was conducted through the established economic assessment model. The result of sensitivity analysis showed that water resources development and installation cost were the most sensitive for total benefits and costs, respectively. The scenario-based test of the organized economic assessment model shows marginal cost ranges and enables decision-makers to decide reasonable cost for the wastewater reuse systems for agriculture.

Economic Dispatch Algorithm as Combinatorial Optimization Problems (조합최적화문제로 접근한 경제급전 알고리즘 개발)

  • Min, Kyung-Il;Lee, Su-Won;Choi, In-Kyu;Moon, Young-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.8
    • /
    • pp.1485-1495
    • /
    • 2009
  • This paper presents a novel approach to economic dispatch (ED) with nonconvex fuel cost function as combinatorial optimization problems (COP) while most of the conventional researches have been developed as function optimization problems (FOP). One nonconvex fuel cost function can be divided into several convex fuel cost functions, and each convex function can be regarded as a generation type (G-type). In that case, ED with nonconvex fuel cost function can be considered as COP finding the best case among all feasible combinations of G-types. In this paper, a genetic algorithm is applied to solve the COP, and the ${\lambda}-P$ function method is used to calculate ED for the fitness function of GA. The ${\lambda}-P$ function method is reviewed briefly and the GA procedure for COP is explained in detail. This paper deals with two kinds of ED problems, namely ED with multiple fuel units (EDMF) and ED with prohibited operating zones (EDPOZ). The proposed method is tested for all the ED problems, and the test results show an improvement in solution cost compared to the results obtained from conventional algorithms.

Comparison of Asphalt Concrete Inlay and Overlay for Rehabilitation of Aged Cement Concrete Pavement through Accelerated Pavement Testing and Life-Cycle Cost Analysis (포장가속시험 및 경제성 분석을 통한 절삭 덧씌우기와 비절삭 덧씌우기의 비교)

  • Suh, Young Chan;Kwon, Hong Jun;Lee, Eung Jun
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.75-81
    • /
    • 2017
  • PURPOSES : So far, aged cement concrete pavement on express highways has been rehabilitated mainly with asphalt concrete inlay. However, potholes were the major problem, and they shortened the life of the inlay mainly owing to the poor drainage of water once it infiltrated the interface of the concrete and asphalt. The purpose of this study is to compare the performance and economic efficiency of asphalt overlay and inlay. METHODS : Overlay and inlay were compared through accelerated pavement testing, and a life-cycle cost analysis was conducted in this study using the CA4PRS program. RESULTS and CONCLUSIONS : It was found from accelerated pavement testing that the overlay exhibited reflective crack resistance that was more than twice as effective as that of inlay. The total cost (construction cost + user cost) within the analysis period (20 years) of the overlay was 37% lower than that of the inlay.