• Title/Summary/Keyword: Test Cost

Search Result 3,991, Processing Time 0.039 seconds

A Decision Support System for the Selection of a Rapid Prototyping Process (쾌속조형공정 선정을 위한 지원 시스템)

  • 변홍석;이관행
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.5-8
    • /
    • 2003
  • This paper presents a methodology to be able to select an appropriate RP system that suits the end use of a part. Evaluation factors used in process selection include major attributes such as accuracy, roughness, strength, elongation, part cost and build time that greatly affect the performance of RP systems. Crisp values such as accuracy and surface roughness are obtained with a new test part developed. The test part is designed with conjoint analysis to reflect users' preference. The part cost and build time that have approximate ranges due to cost and many variable parameters are presented by linguistic values that can be described with triangular fuzzy numbers. Based on the evaluation values obtained, an appropriate RP process for a specific part application is selected by using the modified TOPSIS(Technique of Order Preference by Similarity to Ideal Solution) method. It uses crisp data as well as linguistic variables, and each weight on the alternatives is assigned by using pair-wise comparison matrix. The ranking order helps the decision making of the selection of RP systems.

  • PDF

Design Procedure for System in Package (SIP) Business

  • Kwon, Heung-Kyu
    • Proceedings of the International Microelectronics And Packaging Society Conference
    • /
    • 2003.09a
    • /
    • pp.109-119
    • /
    • 2003
  • o In order to start SIP Project .Marketing (& ASIC team) should present biz planning, schedule, device/SIP specs., in SIP TFT prior to request SIP development for package development project. .In order to prevent (PCB) revision, test, burn-in, & quality strategy should be fixed by SIP TFT (PE/Test, QA) prior to request for PKG development. .Target product price/cost, package/ test cost should be delivered and reviewed. o Minimum Information for PCB Design, Package Size, and Cost .(Required) package form factor: size, height, type (BGA, QFP), Pin count/pitch .(Estimated) each die size including scribe lane .(Estimated) pad inform. : count, pitch, configuration(in-line/staggered), (open) size .(Estimated) each device (I/O & Core) power (especially for DRAM embedded SIP) .SIP Block diagram, and net-list using excel sheet format o Why is the initial evaluation important\ulcorner .The higher logic power resulted in spec. over of DRAM Tjmax. This caused business drop longrightarrow Thermal simulation of some SIP product is essential in the beginning stage of SIP business planning (or design) stage. (i.e., DRAM embedded SIP) .When SIP is developed using discrete packages, the I/O driver Capa. of each device may be so high for SIP. Since I/O driver capa. was optimized to discrete package and set board environment, this resulted in severe noise problem in SIP. longrightarrow In this case, the electrical performance of product (including PKG) should have been considered (simulated) in the beginning stage of business planning (or design).

  • PDF

Initial Investment Cost Analysis of Facilities of B2S Track System (B2S궤도시스템의 초기 시설 투입비용 분석)

  • Kim, Hyo-San;Min, Jun-Ho;Ryu, Jae-Kwang;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

Analysis of Luminance Degradation characteristics of OLED using the Hotplate (핫플레이트를 이용한 OLED의 휘도열화특성 분석)

  • Kim, Yun-Cheol;Lee, Duek-Jung;Jang, Joong-Soon
    • Journal of Applied Reliability
    • /
    • v.16 no.4
    • /
    • pp.356-363
    • /
    • 2016
  • Purpose: The purpose of this study is to propose efficiency of equipment testing the luminance degradation of OLED. Methods: The degradation model of Exponential model and Stretched exponential model is analyzed by goodness of fit test using calculated R-square. The degradation model having the higher R-square is finally selected. Scale parameter and Shape parameter using the selected degradation model is estimated. The activation energy and current density n using peck model among the accelerated model is estimated. the estimated parameters are analyzed by t-test. Results: The results of t-test show that the estimated parameters on chamber and hotplate are equal statistically. we can know the similarity of the luminance degradation rate and degradation pattern on chamber and hotplate. Conclusion: The result of the degradation test on chamber and hotplate is similar. when the accelerated degradation test on the panel of the OLED TV is performed, hotplate is requiring less samples, time and cost than chamber. so the accelerated degradation test on the panel of the OLED TV using the hoplate is efficient of time and cost.

Optimal Maintenance Cycle for Aviation Oil Testing Equipment under the Consideration of Operational Environment (운용환경을 고려한 항공오일시험장비의 최적정비주기 설정)

  • Kim, In Seok;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.16 no.3
    • /
    • pp.224-230
    • /
    • 2016
  • Purpose: Military maintenance involves corrective and preventive actions carried out to keep a system in or restore it to a predetermined condition. This research develops an optimal maintenance cycle for aviation oil testing equipment with acceptable reliability level and minimum maintenance cost. Methods: The optimal maintenance policy in this research aims to satisfy the desired reliability level at the lowest cost. We assume that the failure process of equipment follows the power law non-homogeneous Poisson process model and the maintenance system is a minimal repair policy. Estimation and other statistical procedures (trend test and goodness of fit test) are given for this model. Results: With time varying failure rate, we developed reliability-based maintenance cost optimization model. This model will reduce the ownership cost through adopting a proactive reliability focused maintenance system. Conclusion: Based on the analysis, it is recommended to increase the current maintenance cycle by three times which is 0.5 year to 1.5 years. Because of the system's built-in self-checking features, it is not expected to have any problems of preventative maintenance cycle.

Performance and Initial Cost Analysis on Various Type of Ground Heat Exchangers (지중 열교환기 종류에 따른 성능 및 시공비 분석)

  • Lee, Seung-Rae;Yoon, Seok;Cho, Nam-Hyun;Kim, Min-Jun;Go, Gyu-Hyun
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.10 no.1
    • /
    • pp.14-19
    • /
    • 2014
  • This paper presents a preliminary experimental and computational study on the evaluation of thermal performance and initial cost of U, W and coil type ground heat exchangers (GHEs). Heat exchange rate of the individual GHE was evaluated from the thermal resperformance test (TPT) results, and the construction cost was also calculated. For more information, GLD (ground loop design) simulations of various piping size are carried out. From simulation results, the optimized GHE was suggested based on the thermal performance and construction cost as well. Besides, the required borehole length of U and W type GHEs was calculated considering a real construction condition using GLD program.

A Study on the Transition to Parenthood Expectation on Reward/Cost and Martial Relation of First Pregnant Women (초임부의 부부관계와 부모기전이 보상/비용기대감에 관한 연구)

  • 김양희
    • Journal of Families and Better Life
    • /
    • v.17 no.3
    • /
    • pp.1-16
    • /
    • 1999
  • This study focuses on the beginning of transition to parenthood expectation and applies the exchange theory in order to examine reward and cost of transition to parenthood expectation and picks up the main cause effecting it. This study conducted structured questionnaires to total 330 first pregnant women and examined descriptive statistics and t-test F-test analysis by using collected data. And here are the result of research. First the transition to parenthood expectation expected rewards much more than costs and had much importance on individual aspects in parenthood. The more were they aged hardly educated and housewives the higher did they showed expectation of reward. The less did they have high education the more did they expect costs of the transition to parenthood expectation. Second to examined the reward/cost of transition to parenthood expectation according to martial satisfaction the more did they have martial satisfaction the more did they expectation of the rewa ds on transition to parenthood expectation. On the contrary the more did they respect from husbands the less did they cost of transition to parenthood expectation. This study would be helpful to lead family life having childbirth to the positive way be examining the process from childbirth plan to delivery. Also it will be applicable to seek for the methods to help would-be parents as basic data on material on education about transition to parenthood.

  • PDF

A novel approach for optimal DG allocation in distribution network for minimizing voltage sag

  • Hashemian, Pejman;Nematollahi, Amin Foroughi;Vahidi, Behrooz
    • Advances in Energy Research
    • /
    • v.6 no.1
    • /
    • pp.55-73
    • /
    • 2019
  • The cost incurred by voltage sag effect in power networks has always been of important concern for discussions. Due to the environmental constraints, fossil fuel shortage crisis and low efficiency of conventional power plants, decentralized generation and renewable based DG have become trends in recent decades; because DGs can reduce the voltage sag effect in distribution networks noticeably; therefore, optimum allocation of DGs in order to maximize their effectiveness is highly important in order to maximize their effectiveness. In this paper, a new method is proposed for calculating the cost incurred by voltage sag effect in power networks. Thus, a new objective function is provided that comprehends technical standards as minimization of the cost incurred by voltage sag effect, active power losses and economic criterion as the installation and maintenance costs of DGs. Considering operational constraints of the system, the optimum allocation of DGs is a constrained optimization problem in which Lightning Attachment procedure optimization (LAPO) is used to resolve it and is the optimum number, size and location of DGs are determined in IEEE 33 bus test system and IEEE 34 bus test system. The results show that optimum allocation of DGs not only reduces the cost incurred by voltage sag effect, but also improves the other characteristics of the system.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

Corporate Governance and Cost of Equity: Evidence from Tehran Stock Exchange

  • SALEHI, Mahdi;ARIANPOOR, Arash;DALWAI, Tamanna
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.7
    • /
    • pp.149-158
    • /
    • 2020
  • The purpose of this study was to investigate the impact of corporate governance index on the cost of equity in companies listed on the Tehran Stock Exchange. This study collects data from 975 observations during the period 2012 to 2018 to test the hypotheses using multiple linear regression model for the panel data. In this research, the independent variable of corporate governance index comprises of 27 specific corporate governance attributes. The results of hypothesis testing showed that corporate governance has a negative and significant effect on the rate of capital cost. In other words, the quality of corporate governance can lower the rate of capital cost. This result suggests that, by using a powerful corporate governance system and by declining the information asymmetry (increasing transparency) and agency conflict, we would be able to enhance the quality of financial reports. It would strengthen the capital market, attract financial suppliers and investors, and absorb the required financial resources of the firm by a lower rate. The findings of the study suggest that companies are able to reduce the cost of equity by establishing strong corporate governance. This conclusion suggests the importance and effectiveness of corporate governance in the cost of equity.