• Title/Summary/Keyword: Test Cost

Search Result 3,991, Processing Time 0.032 seconds

Calculation of Breakeven Point for LNG-Heavy Oil Transfer of D Thermal Power Plant Considering $CO_2$ Emission Cost ($CO_2$ 배출비용을 감안한 D 발전소의 LNG-중유 연료교제 손익분기점 계산)

  • Jeong, Yeong-Ho;Lee, Sang-Joong;Lee, Gene-Kyu;Yang, Seong-Deog
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.65-67
    • /
    • 2008
  • Kyoto Protocol against global warming came into effect in Feb 2005. This paper presents a calculation $CO_2$ emission of D power plant for combusting LNG and heavy oil using the a, b, c coefficients obtained by the performance test. The authors also calculate the breakeven point of the fuel transfer from LNG to Oil considering recent $CO_2$ emission cost.

  • PDF

Optimal Software Release Using Time and Cost Benefits via Fuzzy Multi-Criteria and Fault Tolerance

  • Srivastava, Praveen Ranjan
    • Journal of Information Processing Systems
    • /
    • v.8 no.1
    • /
    • pp.21-54
    • /
    • 2012
  • As we know every software development process is pretty large and consists of different modules. This raises the idea of prioritizing different software modules so that important modules can be tested by preference. In the software testing process, it is not possible to test each and every module regressively, which is due to time and cost constraints. To deal with these constraints, this paper proposes an approach that is based on the fuzzy multi-criteria approach for prioritizing several software modules and calculates optimal time and cost for software testing by using fuzzy logic and the fault tolerance approach.

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

Optimal Software Release Policies under Increasing Error Correction Cost (증가(増加)하는 오류수정비용하(誤謬修正費用下)에서의 최적(最適) 소프트웨어 방출정책(放出政策))

  • Bae, Do-Seon;Yun, Won-Yeong;Lee, Yeong-Bong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.15 no.1
    • /
    • pp.51-63
    • /
    • 1989
  • This paper considers software release problems based on Goel-Okumoto and S-shaped reliability growth models. Test of the software system is terminated after a preassigned time T, and it is released to the operational phase. It is assumed that correction cost of an error is increasing with test or operation time. Optimum software release time is obtained using total expected cost on the software life time as a criterion for optimization. In addition, optimal software release policies under the constraint of a software reliability requirement are discussed.

  • PDF

An Efficient Design Strategy of Core Test Wrapper For SOC Testing (SOC 테스트를 위한 효율적인 코어 테스트 Wrapper 설계 기법)

  • Kim, Moon-Joon;Chang, Hoon
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.31 no.3_4
    • /
    • pp.160-169
    • /
    • 2004
  • With an emergence of SOC from developed IC technology, the VLSI design has required the core re-use technique and modular test development. To minimize the cost of testing SOC, an efficient method is required to optimize the test time and area overhead in conjunction for the core test wrapper, which is one of the important elements for SOC test architecture. In this paper, we propose an efficient design strategy of core test wrapper to achieve the minimum cost for SOC testing. The proposed strategy adopted advantages of traditional methods and more developed to be successfully used in practice.

Cost Behavior of Private University Hospital in Korea (사립대학병원의 원가행태)

  • Choi, Hwang-Gyu;Hwang, In-Kyoung
    • Korea Journal of Hospital Management
    • /
    • v.11 no.3
    • /
    • pp.73-93
    • /
    • 2006
  • This study aims at providing necessary informations for management decision-making to the hospital manager, such as ratios of fixed and variable cost to total operating expense, and variable cost ratio to operating revenues, and determinant factors affecting cost behavior. A study model and related hypotheses were established, data were collected from 41 private university hospitals for the 6years from 1998 to 2003, and regression analyses were performed to test the hypotheses. The results of the analyses and conclusions are as follows; First, labor cost and administration cost within the same number of beds have not only fixed quality of the cost, but variable quality of that. Also, the ratio of the variable costs to operating revenue of the metropolitan was estimated 76.9% and that of other area hospitals was 80.1%. Second, the major factors affecting the increase rate of the operating expense were the increase rates of the number of inpatients, the number of employee, and the number of hospital operating bed. This result implies that maintaining a optimal hospital bed size and efficient operation of the beds are important strategic factors of hospital management.

  • PDF

A Study on Developing a CER Using Production Cost Data in Korean Maneuver Weapon System (한국형 기동무기체계 양산비 비용추정관계식 개발에 관한 연구)

  • Lee, Doo-Hyun;Kim, Gak-Gyu
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.39 no.3
    • /
    • pp.51-61
    • /
    • 2014
  • In this paper, we deal with developing a cost estimation relationships (CER) for Korean maneuverable weapons systems using historical production cost. To develop the CER, we collected the historical data of the production cost of four tanks and five armored vehicles. We also analyzed the Required Operational Capability (ROC) of the weapons systems and chose cost drivers that can compare operational capabilities of the weapons systems We used Forward selection, Backward selection, Stepwise Regression and $R^2$ selection as the cost drivers which have the greatest influence with the dependent variables. And we used Principle Component Regression, Robust Regression and Weighted Regression to deal with multicollinearity and outlier among the data to develop a more appropriate CER. As a result, we were able to develop a production cost CER for Korean maneuverable weapons systems that have the lowest cost errors. Thus, this research is meaningful in terms of developing a CER based on Korean original cost data without foreign data and these methods will contribute to developing a Korean cost analysis program in the future.

Time, Energy, Monetary and Psychological Employment Cost of Working Wife compared to full-time housewife (취업주부의 시간, 에너지, 금전, 심리적 취업비용에 관한 연구)

  • 문숙재
    • Journal of the Korean Home Economics Association
    • /
    • v.33 no.6
    • /
    • pp.73-88
    • /
    • 1995
  • the purpose of this study was to compare the consumption of personal and material resources between working wives and full-time housewives and to conceptualize the cost of working wives by the degree of additional consumption of the resources. The proposed costs of working wives included the long working time (time cost), the short leisure time(energy cost), the increase of expenditures fro services and the serious role conflict(psychological cost). Three methods, t-test, simple regression analysis, multiple regression analysis/tobit analysis were used to analyse the differences in consumption of resources between two groups. On the basis of the analysed results, the employment cost of working wives were discussed.

  • PDF

A Simulation Study on The Discounted Cost Distribution under Age Replacement Policy

  • Dohi, Tadashi;Ashioka, Akira;Kaio, Naoto;Osaki, Shunji
    • Industrial Engineering and Management Systems
    • /
    • v.3 no.2
    • /
    • pp.134-139
    • /
    • 2004
  • During the last three decades, a few attentions have been paid for investigating the cost distribution for the optimal maintenance problems. In this article, we derive the moment of the discounted cost distribution over an infinite time horizon for the basic age replacement problem. With first two moments of the discounted cost distribution, we approximate the underlying distribution function by three theoretical distributions. Through a Monte Carlo simulation, we conclude that the log-normal distribution is the best fitted one to approximate the discounted cost distribution.

A Study on Cost Evaluation for Capacitive Reactive Power (무효전력 비용 산정에 관한 연구)

  • 정춘식;박정도;문영현
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.3
    • /
    • pp.182-186
    • /
    • 2004
  • In this paper, the cost for capacitive reactive flower is evaluated considering the deregulation environment. For the cost assessment of reactive power, the duration curve of reactive power demand is introduced and investigated. Also, a guideline is suggested to estimate the Q-cost by using the inverse of the Q-demand duration curve. In order to obtain optimal real reactive power allocation, a new algorithm is proposed by using the piecewise linearization of the inverse of the Q-demand duration curve and the Linear Programming technique. The proposed method is tested with sample systems using MATLAB. The test results show that the algorithm yields reasonable reactive power allocation and Provides fair cost evaluation for reactive power.