• Title/Summary/Keyword: Televiewer and BIPS

Search Result 4, Processing Time 0.02 seconds

Consideration of Changed Attitude of Discontinuity through the Depth -Example at Honam Coal Field and Around Suwon Area- (심도에 따른 불연속면의 형태 변화에 대한 고찰 -호남탄전과 수원인근 지역을 예로 하여-)

  • Lee, Byung-Joo;Choon, Sun-Woo
    • The Journal of Engineering Geology
    • /
    • v.18 no.2
    • /
    • pp.159-166
    • /
    • 2008
  • We have a question about the changing possibility of orientation of discontinuities through the depth of under-ground. To know this, the data from Honam coalfield composed of shale, sandstone and coal and Suwon area which crops out mica schist, were analyzed the discontinuities measured by BIPS and Televiewer. In Honam coalfield the orientations of joints are changed at 30-40 m depth of underground and in Suwon area they are changed around 20 m depth. To compared the results from Honanam coalfield and Suwon area, there are different rock type and geologic structure. However, the attitude of the discontinuities are changing at 20-30 m depth of underground.

Program Development to Evaluate Permeability Tensor of Fractured Media Using Borehole Televiewer and BIPS Images and an Assessment of Feasibility of the Program on Field Sites (시추공 텔리뷰어 및 BIPS의 영상자료 해석을 통한 파쇄매질의 투수율텐서 계산 프로그램 개발 및 현장 적용성 평가)

  • 구민호;이동우;원경식
    • The Journal of Engineering Geology
    • /
    • v.9 no.3
    • /
    • pp.187-206
    • /
    • 1999
  • A computer program to numerically predict the permeability tensor of fractured rocks is developed using information on discontinuities which Borehole Televiewer and Borehole Image Processing System (BIPS) provide. It uses orientation and thickness of a large number of discontinuities as input data, and calculates relative values of the 9 elements consisting of the permeability tensor by the formulation based on the EPM model, which regards a fractured rock as a homogeneous, anisotropic porous medium. In order to assess feasibility of the program on field sites, the numerically calculated tensor was obtained using BIPS logs and compared to the results of pumping test conducted in the boreholes of the study area. The degree of horizontal anisotropy and the direction of maximum horizontal permeability are 2.8 and $N77^{\circ}CE$, respectively, determined from the pumping test data, while 3.0 and $N63^{\circ}CE$ from the numerical analysis by the developed program. Disagreement between two analyses, especially for the principal direction of anisotropy, seems to be caused by problems in analyzing the pumping test data, in applicability of the EPM model and the cubic law, and in simplified relationship between the crack size and aperture. Aside from these problems, consideration of hydraulic parameters characterizing roughness of cracks and infilling materials seems to be required to improve feasibility of the proposed program. Three-dimensional assessment of its feasibility on field sites can be accomplished by conducting a series of cross-hole packer tests consisting of an injecting well and a monitoring well at close distance.

  • PDF

Use of Ultrasonic beam transmissivity for investigating the structural features in plastic pipe cased borehole (초음파의 매질 투과성을 이용한 시추공 케이싱 배면의 암상 및 절리구조 조사 연구)

  • 김중열;김유성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.751-758
    • /
    • 2002
  • Boreholes that are drilled in soft or unconsolidated materials such as gravels and coals are prone to collapse. To maintain the hole, some kinds of casing pipes are needed. If thereby a plastic pipe e.g. PVC is used for the casing, Televiewer tool is still capable of detecting structural features such as fractures in the borehole wall behind the pipe, whereas other borehole-imaging logging devices such as BIPS (Borehole Image Processing System) and FMS(Formation Micro Scanner) won't provide any information about that. Televiewer's primary component is a piezoelectric transducer centered in the hole. It acts as both a transmitter and receiver, and sends an ultrasonic beam. That is reflected, in the same manner as the seismic wave propagation, from the both sides(inner and outer surfaces) of the casing pipe, transmits through the pipe and then reflected from the borehole wall. With an appropriate choice of time-windowing, it is possible to capture the returning signals from both the borehole wall and the outer side of casing pipe as well. A suite of laboratory tests were performed on various physical models composed of plastic pipes with different diameters. Although the amplitudes of returning signals were reduced to about half the usual value due to the transmission loss, the dynamic range of Televiewer tool was sufficient to observe the structural features behind the casing pipe. Besides, several representative case studies at various research areas in our country are presented. The results demonstrate the usefulness of the transmissivity of Televiewer acoustic km, which will assist in further structural interpretation.

  • PDF

Seepage Velocity and Borehole Image of Bottom Protection Layer Filled with Dredged Sand in Sea Dyke (준설해사로 충진된 바닥보호공의 형상 및 침투유속평가)

  • Oh, Young-In;Kang, Byung-Yoon;Kim, Ki-Nyeon;Cho, Young-Gwon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1727-1734
    • /
    • 2008
  • After the final closure of sea dyke, seepage behaviour of embankment is highly changed by variation of water head different between tide wave and controlled water level at fresh lake. Especially, the seepage behaviour of bottom protection layer of final closure section is more important factor for structural and functional stability of sea dyke, because of the bottom protection layer of final closure section is penetrated sea side to fresh lake. Even though bottom protection layer was filled with dredged fine sand, it has a high permeability. In this paper, mainly described about the seepage velocity and borehole image of bottom protection layer filled with dredged sand after final closure. Various in-situ tests such as BIPS (Borehole Image Processing System) and ABI (Acoustic Borehole Imager) survey, wave velocity measuring, and color tracer survey were conducted to evaluate the seepage behavior of bottom protection layer. Based on the in-situ tests, the bottom protection layer of final closure section was almost filled with dredged sand which is slightly coarse grain sand and there have sea water flow by water head different between tide wave and controlled water level at fresh lake. Also, comply with tracer survey results, the sea water flow path was not exist or generated in the bottom protection layer. However, because of this result not only short term survey but also just one test borehole survey results, additional long term and other borehole tests are needed.

  • PDF