Study on the Effective management plan of Technical proposal bid.Business (기술제안입찰의 효율적 운영방안에 관한 연구 - 공공건설공사를 중심으로 -)

  • Choi, Hyun-Snag;Cho, Yong;Cho, Sung;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.107-111
    • /
    • 2009
  • This research provided the technology for the proposed bids to the efficient operation conditions for the application of the existing system of bids and bid proposal, the current technology of the institutional, problems were analyzed. The results of the technical proposal, the current bidding system has been exposed very early points, as ways to overcome these problems and to suggest effective operating plan was to define the details.

  • PDF

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Suggestions for Detection System of Bid-rigging in Public Construction Projects

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.712-713
    • /
    • 2015
  • In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.

  • PDF

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

Analysis of Factors Affecting Successful Bid Price in Public Construction Technical Bidding (공공공사 기술형 입찰에서의 낙찰가격에 미치는 요인 분석)

  • Lee, Jung-Woong;Yi, Sung-Wook
    • Asia-Pacific Journal of Business
    • /
    • v.13 no.1
    • /
    • pp.213-230
    • /
    • 2022
  • Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method (기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF

AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments (지자체 공공건설사업의 발주방식 선정기준에 관한 연구)

  • Choi, Eun-A;Kim, Byung-Ok;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.111-117
    • /
    • 2009
  • With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.

Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey·Alternative Bid Construction (턴키·대안입찰공사 낙찰자 결정방식의 문제점 및 개선 방안 도출)

  • Park, Hong-Tae;Lee, Yang-kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1881-1891
    • /
    • 2014
  • Full system of turnkey deliberation committee in 2010 was abolished and permanent Deliberation committee was introduced. So far, ordering organization selected the best method suitable for the design and comprehensive evaluation method in the turnkey bid construction. Comprehensive evaluation method have bid price design score coordination, weighted basis, the best design approach fixed amount, five successful bidder decision method in addition. Design deliberation branch committee in the successful bidder decision way configured and operated branch members of special design consultation committee, But main agent changed from committee deliberation pull system to permanent committee deliberation, as well as and The lobby burden was not improved. This similar to the past at the portion of the design deliberation and the way of the design deliberation in the turnkey bid construction. Therefore it is necessary to improve the design deliberation system. In other words, design score and technology competition should be adapted to determine a successful bid. This study suggested the operating system of the design deliberation, the decision method problems of the successful bidder and ways to improve the design deliberation.

Life Cycle Cost Evaluation Index Enhancing of Public Facilities (공공시설물의 LCC 평가기준 개선방안)

  • Gu, Bon-Hak;Kim, Tae-Hui;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.412-415
    • /
    • 2007
  • Recently advanced nations utilize evaluation system about LCC, and KOREA begin to introduce the system to reduce construction expense. And Introducing "Technical proposal type bid" that is new government construction order mode made needs for valuation of price to evaluate facilities LCC. These days LCC is evaluated by BTL and turnkey project in KOREA, but it is suffering from difficulty in evaluation. because evaluation element and standard are indefinite. In addition LCC evaluation of public construction business except BTL and turnkey is not consisting. Therefore, in this research we present LCC evaluation Index for systematic and objective evaluation.

  • PDF

FACTOR ANALYSIS ON CONTRACTOR COMPETITION STRATEGY: A HONG KONG STUDY

  • L. Y. Shen;Y. T. Tan;S C Song;M X Yu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.289-298
    • /
    • 2007
  • The development of construction industry has led to the increase in the number of criteria imposed by project clients for selecting contractors. For example, clients often request tenderers to satisfy various conditions such as tight programme, financial strength, managerial ability, relevant work experiences, technical strength, high workmanship standard, safety requirement, quality specification, and yet others. This trend has attracted research interests of devising various methods for helping project clients to assess contractors' bids. For example, in recent development, the Works Bureau of the Hong Kong Government has introduced two mechanisms in tender evaluation for various public work contracts, namely, the Marking Scheme effective from June 2002 and the Formula Approach effective from November 2002 [1], [2]. These approaches evaluate a contractor's tender by considering collectively its tender price and performance attributes, the latter including contractor experience, past performance, technical resources and technical content of his proposal. The tender with the highest combined price and performance score (CPPS) will be normally recommended for acceptance. It appears, however, that there is little existing research in helping contractors to identify a competition strategy that enables the contractor to offer his most competitive bid collectively taking into account his resource capacities and project client's multiple performance criteria. This paper examines the factors affecting contractor's competition strategy to compete for works in Hong Kong. The understanding about the factors will contribute to identifying effective competition strategy. The data used for the analysis were collected from Hong Kong construction industry. The research findings may provide valuable references for investigating effective competition strategies in other construction industries outside the region.