• Title/Summary/Keyword: Technical Performance Measurement

Search Result 156, Processing Time 0.021 seconds

A Study on Technical Measures and their Application (기술척도 적용 연구)

  • Choi, Seok
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.3-8
    • /
    • 2007
  • Technical Measures includes Measures of Effectiveness(MOEs), Key Performance Parameters(KPPs), Measures of Performance(MOPs) and/or Technical Performance Measures(TPMs). Technical measurement is the set of measurement activities used to provide supplier and/ or acquirer insight into progress in the definition and development of the technical solution, ongoing assessment of the associated risks and issues. This paper describes how technical measures can be applied, using the measurement process described in the previous study and shows the relationship between the various types of technical measures.

  • PDF

Economic Model of Performance Measurement for Technical and Vocational Education in Developing Countries Using Official Development Assistance (개도국 직업훈련학교에 대한 공적개발원조 시 경제적 성과 측정 모형)

  • Ghang, Bong-Jun
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.3 no.1
    • /
    • pp.103-109
    • /
    • 2011
  • The ODA(Official Development Assistance) of Korea is growing considerably, and the ODA projects in the technical and vocational education have the good performance to the recipient countries, because they have the direct and quick benefits. But there are no economic model of performance measurement for the ODA in the technical and vocational education. The purpose of this study is to develop the economic model of measuring the performance of the ODA in the technical and vocational education. This study use the ROI model using financial information and the BSC model using non-financial information, and link each model closely. The ROI model using financial information is more relevant, because the benefits of the technical and vocational education are distinct and quick to the recipient groups.

  • PDF

항공기 개발사업을 위한 기술성과측정방법 연구

  • Han, Chang-Hwan;Choi, Seok;Kim, Seung-Bum
    • Aerospace Engineering and Technology
    • /
    • v.4 no.2
    • /
    • pp.42-49
    • /
    • 2005
  • Technical performance measurement (TPM) has been in widespread use for many years and is recognized as a highly useful method that can identify deficiencies in meeting aircraft system requirements, provide early warning of program problems, and be used to monitor technical risks. This paper presents the overview of technical performance measurement method and its application in aircraft system development for KHP, KTX etc.

  • PDF

Technical Performance Measurement & Aanaysis Process Implementation Method and Tool Development of The Defense R&D Project (국방연구개발 프로젝트의 기술적 성과 측정.분석 프로세스 구현방안과 도구 개발)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.3
    • /
    • pp.76-88
    • /
    • 2008
  • The purpose of the research is to propose an earned-value indicator for technical performance measurements of an ongoing defense R&D project and the associated measurement, analysis and the implementation process for data collection and usages. Furthermore, the study demonstrates the evidences of benefits and validity of the proposed approach through the enabling tool development and its application examples.

A Study on the TPM for Performance Management of Weapon System R&D Program (무기체계 연구개발 사업의 성능관리를 위한 기술성과측정에 관한 연구)

  • Hur, Jang-Wook;Noh, Hyun-Il
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.4
    • /
    • pp.612-618
    • /
    • 2010
  • In order to successfully manage of the state-of-the-art weapon system R&D program which are under the limited budget and schedule but also has a high level of technical risks, it is gaining weights to use such a scientific program management tool as TPM. Therefore, the purpose of this research is to review the concept of the TPM and its relation among MOE, MOP and TPM, and introduce an application method of TPM mainly focusing on helicopter development program. It has the organized structure, detailed procedure and 282 parameters for performance management through the TPM.

Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance (비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.

Next Generation Fiber Length Measurement

  • Tiikkaja, Esa;Sopenlehto, Taina
    • Journal of Korea Technical Association of The Pulp and Paper Industry
    • /
    • v.32 no.5
    • /
    • pp.54-59
    • /
    • 2000
  • The next generation fibre size analyser has been developed in Kajaani based on over 15 years experience in fibre measurement. This new FiberLab-analyser can measure fibre length both along the fibre centre line and as projected. The cross-sectional measurements of fibre are in principle similar to the earlier version FiberLab. Measured data are generally displayed in distributions. Some new calculations have been added, for example the fibres cross sectional area and fibre volume index both available as distributions as well. The performance of the FiberLab measurement is verified against the manual microscopic testing. These tests show that the new image analysis-based measurement well matches with the manual methods.

  • PDF

Improved Channel Profile Measurement Technique for ATSC Terrestrial DTV System (향상된 지상파 DTV 채널 프로파일 측정기술)

  • Lee, Jaekwon;Jeon, Sung-Ho;Kim, Jung-Hyun;Suh, Young-Woo;Kyung, Il-Soo
    • Journal of Broadcast Engineering
    • /
    • v.18 no.3
    • /
    • pp.435-444
    • /
    • 2013
  • ATSC terrestrial DTV system can support high data rates for HDTV(High Definition Television) service, but it suffers from significant performance degradation caused by multipath fading. Thus, it is necessary to analyze multipath fading effects in order to enhance the DTV reception performance. Generally, DTV channel profile can be obtained by auto-correlation between reference pseudo random signal and received DTV signal. However, in the ATSC terrestrial DTV system, the estimation performance of DTV channel profile may be decreased due to the VSB modulation features. In this paper, improved DTV channel profile measurement technique is analyzed and proposed.

On an Approach to Measuring the System Performance by Utilizing the Combined System Readiness Level and Achieved Technical Performance in Weapon Systems Development (무기체계개발에서 시스템 성숙도와 기술적 성능 달성도를 연계한 시스템 성능 측정 방법)

  • Kwon, Il-Ho;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.9
    • /
    • pp.4163-4170
    • /
    • 2013
  • The recent studies indicated that the major sources of the failure in carrying out the programs of weapon systems development would be the unsatisfaction of the required key performance and also the use of premature technology. As such, to manage the risk during the weapon systems development, the use of the technical performance measurement (TPM) and the technology maturity assessment (TMA) turned out to be necessary. However, the TPM studied so far seems to cover the assessment of performance at the component level only, and thus is insufficient in considering the system integration effect. On the other hand, the system readiness level (SRL) method has been presented by reflecting the effect on system integration, but the system performance and maturity has not been considered. To overcome this, a measurement method is proposed in the paper by utilizing the combined system readiness level and achieved technical performance at the system level. This system performance measure can be useful in managing the risk in the weapon systems development.