• Title/Summary/Keyword: TS측량

Search Result 35, Processing Time 0.017 seconds

A Study on the Efficient Application for Cadastral Surveying of RTK-GPS (RTK-GPS의 지적측량에 효율적 적용 연구)

  • Hong, Sung-Eon;Lee, Woo-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.1
    • /
    • pp.59-65
    • /
    • 2012
  • The study conducted the measurement of RTK-GPS with changing the number of observation as the method to differ reference stations of RTK-GPS. Also it aimed to suggest an effective application plan for cadastral surveying based on the accuracy analysis accordingly. According to the result of selecting the study region, observing with different reference stations, and comparing with previous TS performance, the 1st reference station was calculated as ${\pm}0.024m$ for x-coordinate's RMSE and ${\pm}0.029m$ for y-coordinate's RMSE, and the 2nd reference station was calculated as ${\pm}0.040m$ for x-coordinate's RMSE and ${\pm}0.029m$ for y-coordinate's RMSE. All these results (the 1st and the 2nd reference stations) are allowed as acceptable performance within the margin of error according to the existing cadastral regulations, and there was no significant difference between two performances. Therefore, unless there was no problem in receiving GPS satellite data, it would be possible to secure stable performance enough with 1 observation. Depending on surveying environment that has possible problems in receiving data, however, 2 or more observations would be necessary to secure stable performance.

3D Modelling Shape Embodiment and Efficiency Analysis of Reservoir that using RTK-GPS and E/S (RTK-GPS와 E/S를 이용한 저수지의 3D 모델링 형상 구현과 효율성 분석)

  • Lee, Jae-One;Park, Un-Yong;Yang, Young-Bo;Kim, Yong-Suk
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.1 s.31
    • /
    • pp.11-17
    • /
    • 2005
  • A lot of small-scale reservoirs that is extravagant in whole country are controlled state or real condition that correct data about the practice contents is not equipped all up to now. In this study, YungNam districts that region Gyeong-Ju city reservoir is distributed much of when flow speedily choose 23 peace among 73 small scale reservoir and experimented. Acquired data every 5 seconds, and user E/S and user value TS for orthocenter to 1 second interval and executes present condition measurement using RTK-GPS. Could was wave and state that reservoir of 15 places (about 65%) gives protective care that do 3D modelling with acquired data, and now correct contents about reservoir state past through comparative analysis with data. Also, area of full water and wave that analyze effective storage and area of full water of 23 places reservoir could know that 20.63%, effective storage decreased as 3.34%. I wish to contribute about analysis about present reservoir state through this and method the adminstration direction.

  • PDF

Availability Evaluation of Quasi Static RTK Positioning for Construction of High Rise Buildings and Civil Structures (고가(高架)구조물의 정위치 시공을 위한 준스태틱RTK 측위의 적용성 실험)

  • Kim, In-Seop
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.19 no.4
    • /
    • pp.119-126
    • /
    • 2011
  • During precise survey on the top of High rise buildings and civil structures, optical surveying equipments like a Total Station are not recommended to use because of some reasons that uneasier alignment with reflectors located at the top of building, increasing error depends on increasement of observation distance and unavailable dynamic positioning etc. Recently various GPS positioning methods have been applied to this job however almost of them are post-processing method which is required much longer time during for whole process includes stake-out, cross checking, fixing positions and final inspections. Therefore, in this study, we applied with RTK surveying system which allows stake-out and inspection in realtime to avoid delaying of construction schedule and also applied with Quasi Static RTK measurement and network adjustment to get a high accuracy within a few millimeters in structure positioning to achieve a successful management for process and quality control of the project. As a result, very high accurate surveying for structures within approx. 2mm in realtime has been achieved when surveyor conduct a network adjustment using least square method for 4 base lines created by Quasi Static RTK data and we expect this method will be applied to construction survey for high rise buildings and civil structures in the future.

Accuracy Analysis of Positioning Supplementary Control Point with the RTK-GPS and RTK-GPS/GLONASS (RTK-GPS와 RTK-GPS/GLONASS에 의한 도근점 측위의 정확도 분석)

  • Park, Woon-Yong;Kim, Jin-Soo;Kim, Yong-Bo;Back, Ki-Suk
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.11 no.1 s.24
    • /
    • pp.61-69
    • /
    • 2003
  • The study is the open area keeping a few visible satellites and the urban area covered with the high building, an electric pole were chosen for evaluation of accuracy of satellite positioning. First, suggest the validity of RTK-GPS, RTK-GPS/GLONASS and compared the accuracy with that of the classical surveying method. As a result. In urban area, in case of real time kinematic positioning when compare between the method combined by GPS/GLONASS and by GPS alone the result of GPS/GLONASS - combination more excellent. And in open ana positioning combined GPS/GLONASS was more excellent than GPS alone in both real time differential and real time kinematic. So, RTK-GPS, RTK-GPS/GLONASS contribute to the digital mapping of Basic map and the existed map necessary for the building of PBLIS to the computerization of cadastral map in the effectiveness in time and in cost and hereafter the combined GPS/TS is expected to contribute to the development of NGIS, Re-investigation of a land register, the execution drawing on site.

  • PDF

Construction of Management System of Road Position Information Using GPS Surveying Data

  • Kim, Jin-Soo;Roh, Tae-Ho;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.3 no.1
    • /
    • pp.15-22
    • /
    • 2003
  • This study aims to construct a management system of road position information as part of the build-up to a maintenance and management system of highways. First, information on the positions of the roads were obtained by a real-time kinematic satellite surveying, and then the degree of accuracy was analyzed in comparison with the data of the existing design drawings. The linear coordinates of road center line obtained by using RTK GPS showed about 7.6-13.2cm errors in X and Y directions in the case of the national road No.2 section, and about 8.4-9.2cm errors in the case of local road No.1045 section. These errors were within the tolerance scope regulated by the TS survey, and could be practically used. In the case of vertical alignment, there were about 6.2cm errors in the Z direction in local road No.1045 section. Aerial photographs are normally used in producing numerical maps, and it can be practically used because the tolerance scope of the elevation control point is l0cm when the scale of aerial photographs is 1/1000. The management system of road position information, utilizing Object-Oriented Programming(OOP), was built having the data acquired in this way as the attribute data. The system developed in this way can enable us to spot the positions of road facilities, the target of management with ease, to easily update the data in case of changes in the positions of roads and road facilities, and to manage the positions of roads and road facilities more effectively.

  • PDF