• 제목/요약/키워드: TBM method

검색결과 201건 처리시간 0.024초

Experimental verification for prediction method of anomaly ahead of tunnel face by using electrical resistivity tomography

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • 제20권6호
    • /
    • pp.475-484
    • /
    • 2020
  • The prediction of the ground conditions ahead of a tunnel face is very important, especially for tunnel boring machine (TBM) tunneling, because encountering unexpected anomalies during tunnel excavation can cause a considerable loss of time and money. Several prediction techniques, such as BEAM, TSP, and GPR, have been suggested. However, these methods have various shortcomings, such as low accuracy and low resolution. Most studies on electrical resistivity tomography surveys have been conducted using numerical simulation programs, but laboratory experiments were just a few. Furthermore, most studies of scaled model tests on electrical resistivity tomography were conducted only on the ground surface, which is a different environment as compared to that of mechanized tunneling. This study performed a laboratory experimental test to extend and verify a prediction method proposed by Lee et al., which used electrical resistivity tomography to predict the ground conditions ahead of a tunnel face in TBM tunneling environments. The results showed that the modified dipole-dipole array is better than the other arrays in terms of predicting the location and shape of the anomalies ahead of the tunnel face. Having longer upper and lower borehole lengths led to better accuracy of the survey. However, the number and length of boreholes should be properly controlled according to the field environments in practice. Finally, a modified and verified technique to predict the ground conditions ahead of a tunnel face during TBM tunneling is proposed.

스마트 팩토리에서 머신 러닝 기반 설비 장애진단 예측 시스템 (A Predictive System for Equipment Fault Diagnosis based on Machine Learning in Smart Factory)

  • 조재형;이재오
    • KNOM Review
    • /
    • 제24권1호
    • /
    • pp.13-19
    • /
    • 2021
  • 최근 산업 분야에서는 공장 자동화 뿐만 아니라 장애 진단/예측을 통해 고장/사고를 사전에 방지하여 생산량을 극대화하기 위한 연구가 진행되고 있으며, 이를 구성하기 위해 많은 양의 데이터 축적을 위한 클라우드 기술, 데이터 처리를 위한 빅 데이터 기술, 그리고 데이터 분석을 쉽게 진행하기 위한 AI(Artificial Intelligence)기술이 도입되고 있다. 또한 최근에는 장애 진단/예측의 발전으로 인해 설비 유지보수(PM: Productive Maintenance) 방식도 정기적으로 설비를 유지보수 하는 방식인 TBM(Time Based Maintenance)에서 설비 상태에 따라 유지보수 하는 방식인 CBM(Condition Based Maintenance)을 조합하는 방식으로 발전하고 있다. CBM 기반 유지보수를 수행하기 위하여 설비의 상태(condition)의 정의와 분석이 필요하다. 따라서 본 논문에서는 머신 러닝(Machine Learning) 기반의 장애 진단을 위한 시스템 및 데이터 모델(Data Model)을 제안하며, 이를 기반으로 장애를 사전 예측한 사례를 제시하고자 한다.

세그먼트 라이닝의 열차 진동하중에 대한 동적 응답특성 (Dynamic response of segment lining due to train-induced vibration)

  • 이경주;송기일
    • 한국터널지하공간학회 논문집
    • /
    • 제25권4호
    • /
    • pp.305-330
    • /
    • 2023
  • 쉴드TBM 터널은 NATM 터널과 달리 라이닝이 세그먼트로 분절되어 있다. 따라서 라이닝에 동일 하중이 발생되어도 NATM 터널 라이닝과 쉴드TBM 터널 라이닝의 응력 분포가 다르게 발생된다. 쉴드TBM 터널에서 라이닝에 발생되는 응력을 분석하는 대표적 방법은 연결부를 고려하지 않는 강성일체법과 링간 이음 및 세그먼트 연결을 고려하는 2링 빔스프링 모델이 있다. 본 연구는 라이닝 분절 Segmentaion을 고려한 Break-joint Mode 해석 방법이지만 세그먼트 라이닝 연결부의 구조적 역할을 고려하지 않고 마찰력 성분인 수직강성과 전단강성 만 도입된 쉘 인터페이스 요소를 이용한 모델링을 적용하여 진동하중 발생 시 라이닝의 응력 및 변위에 대한 응답결과를 분석했다. 토압 등 정적 하중에 대해 천 정부에서 가장 큰 응력이 발생되는 강성일체법과 달리 본 연구의 해석방법에 의해 발생된 세그먼트 라이닝 응력 분포는 세그먼트 연결부가 집중된 천정부 Key 세그먼트에서 가장 작은 응력이 발생하였고 연결부를 경계로 응력의 분포가 뚜렷이 구분되었다. 그리고 정적 해석 결과는 강성일체법에 발생된 라이닝 응력이 본 연구 방법에 의해 발생된 세그먼트 라이닝의 응력에 비해 최대 7배의 큰 응력이 발생되었다. 이러한 결과는 세그먼트 연결부를 고려한 기존의 2링 빔-스프링 모델의 응력분포 양상과 일치하는 결과다. 그러나 열차 진동하중에 대한 응력값은 Break-joint Mode로 해석한 본 연구방법의 응력이 강성일체법에 비해 더 큰 응력을 발생되었다. 이는 짧은 부재들의 조합으로 이루어진 세그먼트 Ring이 원주방향으로 일체로 되어 부재의 길이가 상대적으로 더 긴 강성일체법 결과에 비해 더 작은 응력이 발생되는 정역학적 개념과 상이한 결과다. 진동하중에 대해 Break-joint Mode에서 세그먼트 라이닝에 응력이 더 크게 발생된 원인은 부재의 고유주기, 감쇠비 등 동역학적 요인의 차이보다는 열차 진동하중에 대해 라이닝에 발생되는 변위의 차이에 기인하는 것으로 판단되지만 이에 대한 증명은 추후의 과제로 남겨두었다. 본 연구 방법의 Break-joint Mode를 이용하면 정지상태의 열차 하중에 의해 발생되는 라이닝의 응력과 변위값을 비교하여 쉴드TBM 터널의 충격계수(DIF)를 비교적 간단하게 추정할 수 있다. 본 연구는 쉴드TBM 터널의 Segmentaion을 고려한 3차원 모델링으로 추후 지진파 등 다양한 하중조건의 검토를 통해 기존 해석방법 결과와 비교하여 모델링의 추가적 신뢰성을 확보할 필요가 있다.

외부 하중에 따른 세그먼트 라이닝 변형과 보강용 내부 강재 라이닝의 거동 특성 (Deformation of segment lining and behavior characteristics of inner steel lining under external loads)

  • 이경주;송기일
    • 한국터널지하공간학회 논문집
    • /
    • 제26권3호
    • /
    • pp.255-280
    • /
    • 2024
  • 쉴드TBM 터널에서 단면 부족이나 큰 변형이 세그먼트 라이닝의 안정성에 우려될 경우 터널 외부에 지반 그라우팅으로 보강하거나 터널 내부에 강판 보강, 링 빔 보강, Inner double layer lining으로 보강하는 경우가 있다. 또한, 기존의 쉴드 TBM 터널의 해석은 세그먼트라이닝의 분절 특성을 고려하지 않는 연속체의 강성일체법으로 해석되어왔다. 본 연구는 내부 강재 라이닝으로 보강한 double layer 보강 단면에 대해 보강 메커니즘을 연구하였다. 본 연구는 세그먼트 라이닝에 대한 모델링을 개선하여 세그먼트 라이닝의 분절 특성을 고려한 분절체 모델링(BJM)을 적용하였고 이를 통해 세그먼트 라이닝의 변형 특성을 반영한 double layer 보강 단면을 해석하였다. 연구 결과 기존 콘크리트 세그먼트 라이닝은 하중을 일정부분 분담하는 역할이 아닌 터널 주변 지반을 보강한 것과 같은 역할을 하였다. 일반적으로, 세그먼트 라이닝의 분절을 고려한 BJM 모델과 분절을 고려하지 않는 강성일체법 모두 하중을 받은 라이닝의 변형 형상과 응력 분포가 유사하게 나타났다. 그러나 하중의 강도가 임계치를 넘는 경우 변형의 양상에 차이가 있으며 변형 특성을 보다 면밀히 검토할 수 있는 것으로 나타났다.

분당선 철도 한강 하저터널에서 대구경 쉴드장비 선정 (Determination of a large shield TBM for a tunnel under the Han river in the Bundang railway)

  • 김용일;김동현;조상국
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.569-578
    • /
    • 2003
  • In this paper a determination of the optimal excavation method and machine type for a tunnel under the Han river between the Sungsoo-dong, Sungdong-Gu and the Chungdaw-dong, Kangnam-Gu in the Bundang railway. The geological investigation results show that some fractured zones exist locally under the northern boundary of the Han river bed, but the other regions consist mostly of hard rocks of good quality in the tunnel excavation level. Also, a hign water pressure of $5kgf/cm^2$ and a flash inflow of river water due to old boring holes are expected during tunnel excavation. A EPB shield TBM is selected as a optimal excavation machine for the Han river tunnel considering the geological and ,site conditions.

  • PDF

진동제어발파공법 적용 사례에 관한 연구 (A Case study on the Application of Vibration Controlled Blasting Method)

  • 손영복;김재훈;원연호
    • 화약ㆍ발파
    • /
    • 제21권3호
    • /
    • pp.61-71
    • /
    • 2003
  • 최근 도심지 굴착공법 선정시 주변환경에 대한 관심이 높아지면서 민원발생을 감안하여, 발파공법이 아닌 기계굴착공법(TBM, SHIELD 등) 등이 부분적으로 적용되고 있다. 그러나 이들 굴착공법들은 굴착조건의 변화에 따라 적용 한계성이 있고, 한계구간이 직면할시 시공성이 극히 떨어지거나 적용 자체가 불가능하게 된다. 이에 따라, 공사기간의 연장, 공사비의 증가 및 적용자체가 불가 할 경우는 공사중단에 이르게 되어 시공과정에서 다른 굴착공법으로 전환되는 사례가 빈번히 발생되고 있다. 따라서 본 사례는 도심지 터널구간으로 당초 할암공법으로 설계되었으나 암반의 강도가 높고 굴착단면적이 협소하여 할암공법이 적용될 수 없었다. 이에 대한 대안공법으로 TBM이나 기타 장비에 의한 기계굴착공법을 검토하였으나, 터널연장이 짧고 터널노선의 곡선부 반경이 작아 대형장비의 투입이 어려운 굴착조건 때문에 최종적으로 폭약을 이용한 발파굴착 공법을 선정하였다. 그러나 발파공법은 진동 및 소음이 필연적으로 수반되기 때문에, 주변 환경공해가 허용하는 범위 내에서 최대한의 시공성과 안전성 여부를 판단하기 위하여 발파진동 및 소음의 허용수준을 설정한 후 시험발파를 실시하였으며, 그 결과에 따라 진동제어발파공법을 적용하였다.

다중의 Add-compare-select 모듈을 갖는 병렬 비터비 알고리즘의 메모리 관리 방법 (A memory management scheme for parallel viterbi algorithm with multiple add-compare-select modules)

  • 지현순;박동선;송상섭
    • 한국통신학회논문지
    • /
    • 제21권8호
    • /
    • pp.2077-2089
    • /
    • 1996
  • In this paper, a memory organization and its control method are proposed for the implementation of parallel Virterbi decoders. The design is mainly focused on lowering the hardware complexity of a parallel Viterbi decoder which is to reduce the decoding speed. The memories requeired in a Viterbi decoder are the SMM(State Metric Memory) and the TBM(Traceback Memory);the SMM for storing the path metrics of states and the TBM for storing the survial path information. A general parallel Viterbi decoder for high datarate usually consists of multiple ACS (Add-Compare-Select) units and their corresponding memeory modules.for parallel ACS units, SMMs and TBMs are partitioned into smaller independent pairs of memory modules which are separately interleaved to provide the maximum processing speed. In this design SMMs are controlled with addrss generators which can simultaneously compute addresses of the new path metrics. A bit shuffle technique is employed to provide a parallel access to the TBMs to store the survivor path informations from multiple ACS modules.

  • PDF

강우의 모의발생에 관한 연구 (2차원 무작위 호우장에서) (A Study on the Rainfall Generation (In Two-dimensional Random Storm Fields))

  • 이재형;선우중호;항만하
    • 대한토목학회논문집
    • /
    • 제11권1호
    • /
    • pp.109-116
    • /
    • 1991
  • 최근 몇년동안 2차원 무작위 강우장의 확률특성치인 환상스펙트럼에 대한 논의가 있었고, 2차원 강우장의 모의 모형도 제안되었다. 본 연구는 맨처음 G.Matheron에 의해 소재된 회전띠기법(TBM)을 도입하여 앞서 제시된 환상스펙트럼이나 동방성 공분산 함수를 2차원 강우장으로 전환하는 문제를 다루었다. 특히 Bras의 강우 모의 모형에서 잔차 발생치의 보존특성에 중점을 두었는데 표본수의 증가에 따라 TBM에 의해 발생한 값을 토대로 산정한 평균과 공분산이 이론치에 접근해감을 보였다. 또한 표본의 갯수를 경제적인 규모로 선택하여 실시한 진행성 강우의 모의예도 제시하였다.

  • PDF

전자뇌관과 다단장약을 이용한 발파 사례 연구 (A Case Study on Multiple-deck-charge Blasting with Electronic Detonators)

  • 고태영;신창오;이효;이승철
    • 화약ㆍ발파
    • /
    • 제30권2호
    • /
    • pp.52-58
    • /
    • 2012
  • 싱가포르 DTL2 C915 건설공사 중 TBM 발진을 위한 개착구간의 암발파 공사를 위해 당초 전기뇌관과 ANFO로 발파시공이 계획되었으나 1회 발파공수 제한 및 가시설에 대한 엄격한 진동관리 규정 등으로 인해 작업공정이 많이 지연되어 TBM 발진을 위한 예정된 공기를 준수하지 못하는 것으로 검토되었다. 따라서 암발파 공법의 효율을 개선하고 1회 발파공수 및 파쇄면적의 최대화를 위해 다단장약이 검토되었으며, 다단장약의 효율성을 높이기 위해 정밀성이 장점인 전자뇌관이 선정되었다. 다단장약 적용으로 천공장이 길어짐에 따라 커지는 암반 구속력에 대응하기 위해 폭약의 위력을 증대시키는 방안으로 Emulsion Cartridge 폭약을 적용하였다. 그 결과 발파효율과 시공성을 개선함과 동시에 가시설의 안정성을 확보할 수 있었다.

지질취약구간 터널통과에 따른 지하수위 변화량 분석 (Analysis of Changes in Groundwater Level according to Tunnel Passage in Geological Vulnerable Zone)

  • 최정열;양규남;김태준;정지승
    • 문화기술의 융합
    • /
    • 제6권3호
    • /
    • pp.369-375
    • /
    • 2020
  • 본 연구의 검토대상 구간은 전력구 시공을 위한 쉴드 TBM 굴착 도중 터널 막장면을 통해 지하수 유출이 발생한 구간이다. 따라서 공사 전부터 지하수위의 변화가 발생되는 시점까지의 상황을 분석하기 위해 공사 중 관찰된 지하수위 변화를 토대로 주변 지반현황을 반영하여 3차원 수치해석을 수행하였다. 이를 통해 현장 주변에서 발생한 지하수위 변화와 터널공사의 상관성을 파악하였다. 본 연구의 수치해석결과는 대상지반에서 측정된 지하수위 계측결과와 유사하며 쉴드 TBM 막장면으로의 지하수 유출량 또한 실제 측정결과와 유사한 수준으로 나타나 본 연구에서 설정한 수치해석 방법과 모델링은 현장여건을 잘 반영하는 것으로 분석되었다.