Experimental verification for prediction method of anomaly ahead of tunnel face by using electrical resistivity tomography

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • 제20권6호
    • /
    • pp.475-484
    • /
    • 2020
  • The prediction of the ground conditions ahead of a tunnel face is very important, especially for tunnel boring machine (TBM) tunneling, because encountering unexpected anomalies during tunnel excavation can cause a considerable loss of time and money. Several prediction techniques, such as BEAM, TSP, and GPR, have been suggested. However, these methods have various shortcomings, such as low accuracy and low resolution. Most studies on electrical resistivity tomography surveys have been conducted using numerical simulation programs, but laboratory experiments were just a few. Furthermore, most studies of scaled model tests on electrical resistivity tomography were conducted only on the ground surface, which is a different environment as compared to that of mechanized tunneling. This study performed a laboratory experimental test to extend and verify a prediction method proposed by Lee et al., which used electrical resistivity tomography to predict the ground conditions ahead of a tunnel face in TBM tunneling environments. The results showed that the modified dipole-dipole array is better than the other arrays in terms of predicting the location and shape of the anomalies ahead of the tunnel face. Having longer upper and lower borehole lengths led to better accuracy of the survey. However, the number and length of boreholes should be properly controlled according to the field environments in practice. Finally, a modified and verified technique to predict the ground conditions ahead of a tunnel face during TBM tunneling is proposed.

로드헤더의 굴착 원리와 데이터베이스를 활용한 로드헤더 핵심 설계 항목의 통계분석 (Excavation Mechanism of Roadheader and Statistical Analysis of its Key Design Parameters Based on Database)

  • 박영택;최순욱;박재현;이철호;장수호
    • 터널과지하공간
    • /
    • 제23권5호
    • /
    • pp.428-441
    • /
    • 2013
  • TBM을 적용하기 어려운 터널과 다양한 조건의 광산에서 기계 굴착장비인 로드헤더의 수요가 증가하고 있다. 하지만 우리나라에서 로드헤더의 적용 실적은 거의 전무하며, 일부 국가에서만 로드헤더의 설계 제작기술을 보유하고 있다. 따라서 본 연구에서는 로드헤더의 최적 선정과 설계를 위한 로드헤더의 굴착 원리 및 핵심설계항목들을 분석하였다. 또한 전 세계 143개의 로드헤더 설계 정보들을 데이터베이스화하고 로드헤더의 설계에 활용하기 위한 통계적인 상관관계들을 도출하였다. 마지막으로 데이터베이스에 기반하여 로드헤더를 설계하기 위한 절차를 제시하였다.

EPB tunneling in cohesionless soils: A study on Tabriz Metro settlements

  • Rezaei, Amir H.;Shirzehhagh, Mojtaba;Golpasand, Mohammad R. Baghban
    • Geomechanics and Engineering
    • /
    • 제19권2호
    • /
    • pp.153-165
    • /
    • 2019
  • A case study of monitoring and analysis of surface settlement induced by tunneling of Tabriz metro line 2 (TML2) is presented in this paper. The TML2 single tunnel has been excavated using earth pressure balanced TBM with a cutting-wheel diameter of 9.49 m since 2015. Presented measurements of surface settlements, were collected during the construction of western part of the project (between west depot and S02 station) where the tunnel was being excavated in sand and silt, below the water table and at an average axis depth of about 16 m. Settlement readings were back-analyzed using Gaussian formula, both in longitudinal and transversal directions, in order to estimate volume loss and settlement trough width factor. In addition to settlements, face support and tail grouting pressures were monitored, providing a comprehensive description of the EPB performance. Using the gap model, volume loss prediction was carried out. Also, COB empirical method for determination of the face pressure was employed in order to compare with field monitored data. Likewise, FE simulation was used in various sections employing the code Simulia ABAQUS, to investigate the efficiency of numerical modelling for the estimating of the tunneling induced-surface settlements under such a geotechnical condition. In this regard, the main aspects of a mechanized excavation were simulated. For the studied sections, numerical simulation is not capable of reproducing the high values of in-situ-measured surface settlements, applying Mohr-Coulomb constitutive law for soil. Based on results, for the mentioned case study, the range of estimated volume loss mostly varies from 0.2% to 0.7%, having an average value of 0.45%.

도심지 소단면 터널식 공동구의 핵심 안전 위험요소 및 위험성 평가 연구 (Study on key safety hazards and risk assessments for small section utility tunnel in urban areas)

  • 성주현;정민형
    • 한국터널지하공간학회 논문집
    • /
    • 제20권6호
    • /
    • pp.931-946
    • /
    • 2018
  • 도심지에서의 공동구의 활용성 증가에 따라 쉴드 TBM 공법이 적용된 터널식 공동구의 시공 및 연구개발이 활발히 진행되고 있다. 터널식 공동구는 지하굴착 공사로써 건설안전에 상대적으로 취약하지만, 건설업 재해율 감소를 위한 설계안전성 검토 제도 도입에도 불구하고 터널식 공동구 건설에 적합한 위험요소가 제대로 알려져 있지 않다. 따라서 본 연구에서는 터널식 공동구에 적합한 안전 위험요소를 발굴하고 이중에서 중점으로 관리되어야 할 핵심 안전 위험요소를 도출하였다. 도출된 핵심 안전 위험요소는 매트릭스 기법을 적용하여 위험성 평가를 실시함으로써 공동구 계획, 설계 및 시공 단계의 위험성 평가 및 주요 참고 자료로 사용될 수 있도록 하였다.

구동형 언더커팅 디스크의 절삭효율 평가 (Assessment of rock cutting efficiency of an actuated undercutting disc)

  • 정호영;;김세훈;전석원
    • 한국터널지하공간학회 논문집
    • /
    • 제23권3호
    • /
    • pp.199-209
    • /
    • 2021
  • TBM과 로드헤더로 대표되는 기존의 기계화 암반굴착방식을 보완하고 대체하기 위한 새로운 개념의 암석절삭기법들이 연구되어오고 있다. 이러한 기법들 중 언더커팅 방식은 최근에 연구가 수행되고 있는 방식이다. 언더커팅에서는 기존의 전통적인 암석절삭 방식과 비교하여 보다 많은 절삭변수들이 암석의 절삭메커니즘에 관여한다. 본 논문은 이에 대한 기초연구로 수행되었으며, 언더커팅이 적용된 구동형 디스크, 실험실 스케일의 절삭시험시스템, 시험 방법에 대하여 소개하였다. 또한 본 논문에서 소개된 절삭시험시스템을 이용하여 구동형 언더커팅 디스크의 절삭력을 통해 비에너지를 계산하는 방법을 소개하였으며, 그 결과를 전통적인 암석절삭방식과 비교하여 분석하였다.

Influence of EDZ on the Safety of a Potential HLW Repository

  • 황용수;강철형
    • 방사성폐기물학회지
    • /
    • 제2권4호
    • /
    • pp.253-262
    • /
    • 2004
  • Construction of tunnels in a deep crystalline host rock for a potential High-Level Radioactive Waste(HLW) repository inevitably generates an excavation disturbed zone (EDZ). There have been a series of debates on whether a permeability in an EDZ increases or not and what would be the maximum depth of an EDZ. Recent studies show mixed opinions on permeability. However, there has been an international consensus on the thickness of an EDZ; 30 cm for TBM and 1 meter for controlled blast. One of the impacts of an EDZ is on determining the distance between adjacent deposition holes. The void gap by the excavation hinders relaxation of temperature profiles so that the current Korean reference designing distance between holes should be stretched out more to keep the maximum temperature in a buffer region below 100 degrees Celsius. The other impact of an EDZ is on the long-term post closure radiological safety. To estimate the impact, the reference scenario, the well scenario, is chosen. Released nuclides diffuse through a bentonite buffer region experiencing strong sorption and reach a fracture surrounded by a porous medium. Inside a fractured porous region, radionuclides migrate by advection and dispersion with matrix diffusion into a porous medium. Finally, they reach a well assumed to be a source of potable water for local residents. The annual individual dose is assessed on this well scenario to find out the significance of an EDZ. A profound sensitivity study was performed, but all results show that the impact is negligible. Even though the role of an EDZ turns out to be limited on overall safety assessment, still it is worthwhile to study the chemical role of an EDZ, such as a potential source for natural colloids, potential sealing of an open fracture by fine clay particles generated by the process of an EDZ, and alteration of a sorption mechanism by an EDZ in the future.

  • PDF

공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구 (Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport)

  • 안창윤;박두희
    • 한국터널지하공간학회 논문집
    • /
    • 제23권5호
    • /
    • pp.325-337
    • /
    • 2021
  • 도로와 철도터널에서는 비상시 대피를 위한 시설이 필수적이며, 제연 및 화재 진압을 위한 설비와 승객의 피난 통로가 그것이다. 장대 병설터널에서는 횡갱을 배치하여 화재 발생 반대편 터널로 대피하도록 계획된다. 병설 쉴드터널에서는 횡갱의 시공을 위해 기 시공된 본선터널의 영구 구조물인 세그먼트 라이닝을 철거하여 원지반을 노출하여야 한다. 현대의 대부분의 쉴드TBM이 막장을 격벽으로 차단한 폐쇄형 쉴드TBM임을 감안할 때, 원지반이 노출되는 횡갱의 시공은 쉴드터널의 시공단계에서 위험도가 높은 과정 중 하나이다. 특히, 지하수위 아래의 토사 쉴드터널의 횡갱 시공에서는 세그먼트 철거 및 굴착 중 토사지반의 안정성 확보를 위한 차수 및 굴착공법에 대한 면밀한 검토가 요구된다. 본 사례 연구에서는 토사지반에서 대구경 강관추진을 활용한 횡갱 굴착 공법의 시공 중 유의사항을 소개하고 시공 후 계측결과를 분석하였다. 본 사례 연구에서 소개되는 횡갱 굴착공법은 그라우팅으로 보강된 토사지반에 대구경 강관 추진 후 내부 굴착하는 공법으로써, 두 가지 메커니즘에 의해 토사지반에서 굴착 중 막장의 안정성을 확보한다. 첫 번째는 대구경 강관을 추진하여 막장 전방 토사지반의 전주면을 강관에 의해 선 지보 한다. 두 번째는 대구경 강관 추진으로 내부로 압입된 토사의 Plugging 효과에 의해 막장 전면의 지지효과를 얻을 수 있다. 추진력에 의한 강관의 변형 및 강관의 관통 완료 후 응력발생 계측결과로부터 대구경 강관 추진에 의한 횡갱 굴착공법이 토사지반에서 충분한 시공성과 안정성을 확보함을 확인하였다. 본 사례 연구의 토사 쉴드터널의 횡갱 시공공법은 유사한 현장조건에서 널리 활용될 수 있을 것으로 판단된다.

전이 구간(트렌지션 커터존)의 최적 디스크커터 각도 산정에 관한 수치해석 연구 (Numerical analysis on the estimation of optimal disc cutter angle in transition cutter zone)

  • 이상연;송기일
    • 한국터널지하공간학회 논문집
    • /
    • 제23권1호
    • /
    • pp.1-12
    • /
    • 2021
  • Tunnel boring machine (TBM)의 설계에 있어서 지반과 직접적으로 맞닿아 절삭을 담당하는 커터헤드의 설계에 따라서 장비의 굴진효율이 달라지게 된다. 디스크커터는 배치되는 위치에 따라 센터 커터 존, 이너 커터 존, 트렌지션 커터 존으로 구분된다. 기존에도 페이스커터의 최적 절삭조건을 규명하기 위한 연구는 많이 진행되어 왔으나, 트렌지션 커터의 최적 절삭조건을 규명하기 위한 연구는 상대적으로 미진하였다. 본 연구에서는 트렌지션 커터의 최적의 절삭조건을 규명하기 위해 개별요소법 수치해석을 수행하고 트렌지션 커터 사이의 각도에 따른 비에너지 곡선을 작도하여 최적 절삭조건을 알아보고자 하였다. 수치해석 결과 전이영역에서 최소 비에너지를 보이는 트렌지션 커터 사이의 각도 9°인 것으로 확인되었다. 이를 트렌지션 커터의 경사각에 따라 3가지 영역으로 구분하고 영역별 디스크커터 사이의 각도와 비에너지를 정리한 결과 트렌지션 커터의 경사각이 커질수록 최적 비에너지를 보이는 트렌지션 커터 사이의 각도는 10°에서 8°까지 점차 감소하는 경향을 보였다. 이러한 결과는 기존에 사용되고 있는 트렌지션 커터의 설계 결과와 유사한 경향으로써, 본 연구의 결과를 밑받침한다.

커터수명지수 예측을 위한 다중선형회귀분석과 트리 기반 머신러닝 기법 적용 (Application of Multiple Linear Regression Analysis and Tree-Based Machine Learning Techniques for Cutter Life Index(CLI) Prediction)

  • 홍주표;고태영
    • 터널과지하공간
    • /
    • 제33권6호
    • /
    • pp.594-609
    • /
    • 2023
  • TBM 공법은 굴착면 안정성 확보 및 주변환경에 비치는 영향을 최소화하기 때문에 도심지나 하·해저터널 등에서 적용 사례가 증가하는 추세이다. 디스크 커터의 수명을 예측하는 대표적인 모델 중 NTNU모델은 커터수명지수(Cutter Life Index, CLI)를 주요 매개 변수로 활용하지만 복잡한 시험절차와 시험장비의 희귀성으로 측정에 어려움이 있다. 본 연구에서는 다중선형회귀분석과 트리 기반의 머신러닝 기법으로 암석물성을 활용하여 CLI를 예측하였다. 문헌 조사를 통해 암석의 일축압축강도, 압열인장강도, 등 가석영함량과 세르샤 마모지수 등을 포함한 데이터베이스를 구축하였고 파생변수를 계산하여 추가하였다. 다중선형회귀분석은 통계적 유의성과 다중공선성을 고려하여 입력 변수를 선정하였고 머신러닝 예측 모델은 변수 중요도를 기반으로 입력 변수를 선정하였다. 학습용과 검증용 데이터를 8:2로 나누어 모델 간 예측 성능을 비교한 결과 XGBoost가 최적의 모델로 선정되었다. 본 연구에서 도출된 다중선형회귀모델과 XGBoost모델을 선행 연구와 예측 성능을 비교하여 타당성을 확인하였다.

선형회귀분석과 머신러닝을 이용한 암석의 강도 및 암석학적 특징 기반 세르샤 마모지수 추정 (Estimation of Cerchar abrasivity index based on rock strength and petrological characteristics using linear regression and machine learning)

  • 홍주표;강윤성;고태영
    • 한국터널지하공간학회 논문집
    • /
    • 제26권1호
    • /
    • pp.39-58
    • /
    • 2024
  • TBM (Tunnel boring machine)은 터널 굴착 과정에서 여러 디스크 커터를 이용하여 암석을 절삭한다. 디스크 커터는 암석과의 지속적인 접촉과 마찰로 인해 마모된다. 디스크 커터의 표면이 마모되면 절삭 능력이 감소하고 굴착 효율이 떨어진다. 암석의 마모성은 디스크 커터 마모에 큰 영향을 미친다. 높은 마모도를 가진 암석은 커터에 더 큰 마모를 일으키며, 이는 디스크 커터의 수명을 단축시킨다. 세르샤 마모지수(Cerchar abrasivity index, CAI)는 암석의 마모성을 평가하는데 널리 사용되는 지표로 CAI는 암석의 마모특성을 나타내며, 디스크 커터의 수명과 성능 예측에 필수적인 요소로 인식되고 있다. 본 연구의 목적은 암석의 강도, 암석학적 특성과 선형회귀, 머신러닝 기법을 이용하여 CAI를 효과적으로 추정하는 새로운 방법을 개발하는 것이다. 문헌 조사를 통해 CAI, 일축압축강도, 압열인장강도, 등가석영함량이 포함된 데이터베이스를 구축하고 파생변수를 추가하였다. 통계적 유의성과 다중공선성을 고려하여 다중선형회귀분석을 위한 입력변수를 선정하였고, 머신러닝 모델의 입력변수는 변수중요도 분석을 통해 선정하였다. 머신러닝 예측모델 중 Gradient Boosting 모델의 예측 성능이 가장 높게 나타나 최적의 CAI 예측 모델로 선정되었다. 마지막으로 본 연구에서 도출한 다중선형회귀분석과 Gradient Boosting 모델의 예측 성능을 선행연구들의 CAI 예측모델과 비교하여 연구 결과의 타당성을 확인하였다.